1 / 6

400 KV GHANAPUR-KURNOOL-GOOTY LINE

400 KV GHANAPUR-KURNOOL-GOOTY LINE. COMMISSIONING AND ADVANTAGES. COMMISSIONING HIGHLIGHTS. GHANAPUR-KURNOOL(224 KMS) TEST CHARGED FROM GHANAPUR ON 11/02/2005 AT 1140 HRS SYNCHRONISED AT KURNOOL AT 1311 HRS

Download Presentation

400 KV GHANAPUR-KURNOOL-GOOTY LINE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 400 KV GHANAPUR-KURNOOL-GOOTY LINE COMMISSIONING AND ADVANTAGES

  2. COMMISSIONING HIGHLIGHTS • GHANAPUR-KURNOOL(224 KMS) TEST CHARGED FROM GHANAPUR ON 11/02/2005 AT 1140 HRS • SYNCHRONISED AT KURNOOL AT 1311 HRS • KURNOOL-GOOTY(84 KMS) TEST CHARGED FROM GOOTY ON 11/02/2005 AT 1330 HRS AND SYNCHRONISED AT KURNOOL AT 1520 HRS

  3. ADVANTAGES OF THE LINE • VITAL BACKBONE LINK • PROVIDES SUPPORT IN OUTAGE OF NORTH-SOUTH NETWORK LINES FOR EG, 400 KV NUNNA-NELLORE-MADRAS, N’SAGAR-CUDDAPAH ETC • LOSSES IN THE GRID ARE REDUCED BY 6 MW IN NORMAL CONDITIONS AND BY AS MUCH AS 12 MW DURING LOAD CHANGEOVERS • SC LEVELS OF KURNOOL IMPROVED FROM 2400 MVA TO 4500 MVA AFTER RGM-HYD-KNL-GTY WAS COMMISSIONED • INCREASED SC LEVELS AT GTY (3484 TO 4600 MVA) ALSO • IMPROVED STABILITY, LESS VOLTAGE EXCURSIONS AT THESE STATIONS CAN BE EXPECTED • ALSO ANCHORS THE SRISAILAM SYSTEM WITH THE CTU GRID

  4. 400 KV D/C GAZUWAKA-NUNNA LINE COMMISSIONING AND ADVANTAGES

  5. COMMISSIONING HIGHLIGHTS • GAZUWAKA-NUNNA-II CHARGED FROM GAZUWAKA END AT 1626 ON 27/02/05 AND SYNCHRONISED AT NUNNA AT 1652 HRS • GAZUWAKA-NUNNA-III CHARGED FROM GAZUWAKA END AT 2303 ON 27/02/05 AND SYNCHRONISED AT NUNNA AT 2315 HRS

  6. ADVANTAGES OF THE LINE • PLANNED FOR EVACUATION OF POWER FROM POLE 2 AT GAZUWAKA • ALLEVIATED THE LOADING AND LOAD ANGLE ON THE S/C 400 KV GAZUWAKA-NUNNA LINE • IMPROVED THE EVACUATION OF SIMHADRI AS WELL AS GAZUWAKA IMPORT • LOSSES REDUCED BY 8 MW WITH FULL GENERATION AT SIMHADRI AND 500 MW IMPORT AT GAZUWAKA • IMPROVED STABILITY IN N.COASTAL AP AREA • RELIEVED LOADINGS ON GAZUWAKA-KAKINADA-VTS CORRIDOR

More Related