NOKIA Packaging Simulation

NOKIA Packaging Simulation. Elena Brown Demetrios Boutsikakis Mike Duffy Jay Wassum. Introduction. NOKIA Manufacturing Facility Manufacturing Packaging Shipping Inefficient Packaging Operations Increase Units Per Man Hour (UPMH) in Packaging. Background of Problem.

amie
Download Presentation

NOKIA Packaging Simulation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NOKIA Packaging Simulation Elena Brown Demetrios Boutsikakis Mike Duffy Jay Wassum

  2. Introduction • NOKIA Manufacturing Facility • Manufacturing • Packaging • Shipping • Inefficient Packaging Operations • Increase Units Per Man Hour (UPMH) in Packaging

  3. Background of Problem • Packaging runs an inefficient operation • Personnel change due to current layoffs • Employees not settled • Previous UPMH: 26 • Current UPMH: 14 • Goal UPMH: 36-40 or 20% increase

  4. UPMH

  5. Goal • Identify inefficiencies in packaging line • Try to increase UPMH

  6. Data Collection • Previous studies and research • Employee feedback • Time studies • Observation

  7. Observations

  8. Our Theory • Combine two processes into one: • Inserting literature currently done by two people • Can be done by one person in one step • Will automatically increase UPMH by eliminating one worker from the process

  9. Simulation • Test theories to increase efficiencies in packaging line • ProModel • Graphical representation of process • Run time data • Ability to reconfigure process

  10. Will work if: • Our theory line can produce the same output less than or equal to the time of the current line • One literature person can insert the literature in the allotted time

  11. Present line: 250 entries 1hr 18 min 13 workers =14.736 (for 1 line) Theory line: 250 entries 1hr 18 min 12 workers =15.964 (for 1 line) UPMH with our Model

  12. Conclusions • Literature can be inserted by one person within the allotted time • Having only one literature person is more efficient • UPMH is increased by 8.33%

  13. Critique • There are many other ways we could have solved this problem. • Through the use of ProModel we increased UPMH, but not as much as our original goals. • Conflicting time schedules and distance of facility were problems.

  14. Thank You • NOKIA Packaging Management • Dr. Olinick • Erin Hopper