An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Telecom Cost Analysis – Rev. 1 Pat Burns VP for IT Telecom Costs - IAC

  2. Telecom Costs - IAC FY 09 Monthly Cost for Basic Service

  3. Telecom Costs - IAC

  4. Telecom Costs - IAC

  5. Telecom Costs - IAC

  6. Telecom Costs - IAC

  7. Telecom Costs - IAC

  8. Telecom Costs - IAC Project Categories • Physical Infrastructure • Wide area networking – fiber and optical gear • Inter-campus fiber infrastructure - fiber • Inter-building infrastructure – fiber and copper • Building rewires • Switch – SL-100 upgrades • E911 – E911 phones, video surveillance cameras • Futures – Unified Messaging, VoIP • Equipment • Vehicles & cable trailer • Fiber splicers • Fiber OTDR • Copper testers, 6a • Operator consoles • Other • Internet costs in FY02 • GSB shop remodel

  9. Telecom Costs - IAC

  10. Telecom Costs - IAC Project Details – Phys. Infra. • FY 99-00 • OIS Video $142,113 • AS-12 $47,000 • Clark $105,000 • FY 00-01 • Wagar $42,000 • Ayleswsorth $73,000 • AtmosSciSim Lab $6,313 • Weber $17,670 • UV Phase 5 $15,529 • FY 01-02 • OFCHS $25,507 • CIRA $13,273 • Chem Bio $5,188 • Industrial Science $1,162 • Weber AS.12 $3,000 • FY 01-02 (cont’d) - Fiber • Glover $3,019 • Green Hall $2,480 • Foothills $6,615 • VTH $2,100 • Rampart/Overland $2,175 • Foothills $11,276 • NRRC $972 • NWRC $1,720 • FY 02-03 • Tunnel Project $50,007 • Gugg/Chem-Bio/VTH $1,349 • Chem Bio $2,024 • VTH $5,000 • Foothills Generator $5,383 • AS.12 Projects$299,000

  11. Telecom Costs - IAC Project Details – Infrastructure (cont’d) • FY 03-04 • Housing $13,253 • Tunnel Project $44,288 • MRB CSUIITE $4,109 • ARBL to AIDL $11,890 • Aggie South $5,023 • AS.12 Projects $369,768 • CDOT $23,493 • Campus Fiber • Pitkin Ave $17,540 • Centre Ave $15,917 • Aggie North $5,209 • Campus Ring $151,237 • FY 04-05 • CSU/UW fiber $185,000 • CSUIITE Projects $63,134 • CDOT $31,027 • Tunnel Project $380 • Campus Fiber • Campus Ring $8,887 • Misc. $27,199 • FY 05-06 • AS.12 Projects $15,680 • Campus fiber • Hughes $2,007 • Misc $116,273

  12. Telecom Costs - IAC Project Details – Infrastructure (cont’d) • FY 06-07 • CDOT $1,420 • Campus fiber • Misc $59,921 • 555 S. Howes $8,119 • Rampart Rd T $5,347 • N. Lateral Loop $18,795 • Pitkin Street $3,400 • 1500 UV $10,484 • FY 07-08 • CSUIITE $30,000 • CDOT $1,539 • Glover $16,828 • GSB $60,000 • FY 07-08 (cont’d) - fiber • Misc Fiber Projects $55,250 • Overland Trail $47,309 • 1500 UV $43,027 • FY 08-09 (budgeted) • CSUIITE $100,000 • Fiber Projects $150,000 • CDOT $30,000 • Adesta $215,000

  13. Telecom Costs - IAC FY 09 BS Cost Comparison with CSU Peers(All currently have revenue from Housing) * Includes Voice Mail

  14. Telecom Costs - IAC FY 09 BS+VM Cost Comparison with Peers(All currently have revenue from Housing)

  15. Telecom Costs - IAC Perspective – Most Successful Activities • AS.12 building rewires • On-campus fiber: buildings, backbone • Off-campus fiber: inter-campus, WAN • Optical networking • BiSON ring at multi Gbps • In a nearly cost neutral manner, the campus has been provided • Excellent physical infrastructure • Excellent Internet access • While maintaining the lowest basic service costs among all of our peers, with no additional funding!

  16. Telecom Costs - IAC FY 10 Scenarios • Scenario A: Housing eliminates room phones • Loss in revenue = $590,252 • Scenario B: Housing retains ‘emergency’ phones in rooms • At $6 per month for 9 months = $205,902/yr. • Loss in revenue = $384,350 • The following scenarios assume we eliminate the aforementioned telecom projects progressively

  17. Telecom Costs - IAC Scenario A: No Phones in Housing(Cumulative Cost Reductions)

  18. Telecom Costs - IAC Scenario B: ‘Emergency’ Phones in Housing

  19. Telecom Costs - IAC Discussion of Scenarios A and B • Scenario A – range for monthly cost increase • Max = $18.77 - $11.13 = $7.64 • Min = $13.20 - $11.13 = $2.07 • Scenario B – range for monthly cost increase • Max = $16.49 - $11.13 = $5.36 • Min = $11.92 - $11.13 = $0.79 • Question – what do we value, and what do we agree to fund?

  20. Telecom Costs - IAC UpcomingTransition Costs • Telephone switch end of life in 2011 • In 1993, costs for current telecom infrastructure • Switch cost = $3.0 million • Enhanced to keep current @ $2.5 million • Octel VM system cost = $1.5 million • Underground copper cost = $3.5 million (Qwest) • 1-time costs for VoIP may be ~$3-5 million • ‘Hardening’ the network • Backbone switch upgrade • Adding UPSs and POE in the closets • May be otherwise funded – consider separately? • TBD in FY 2010

  21. Telecom Costs - IAC Discussion • How do we fund • Wide area fiber and equipment • Physical IT infrastructure upgrades • Hardening the existing network • Transition to integrated VoIP system or maintain analog phones? • Adding VoIP infrastructure • Power over Ethernet • UPS • End user devices • Aggregate VoIP infrastructure

  22. Telecom Costs - IAC Consequences

  23. Telecom Costs - IAC Recommendations • Maintain operators @ $0.89/mo. • Maintain at full amounts: • ‘E911’ @$0.35/mo. • ‘Equipment’ @$0.21/mo. • Redirect into VoIP portions of $4.77/mo.? • ‘Phys. Infra.’ @ $3.11/mo. • ‘Futures’ @ $0.33/mo. • ‘Switch’ @ $1.31/mo. • Eliminate ‘ Other’ @ $0.20/mo. • Reduce VM/UM costs by ~$1/mo.