An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAL / UPPSALAPaul SellerI/O TSVs with T-Micro3DIC with EMFT Munich

  2. I/O TSV with T-Micro No Bond pads! 4*80 test 4S ASIC 4S Hexitec ASIC with TSVs, wire-bonding on back working last year. Thinned to 120um. • New ‘4S’ ASIC with small readout region. • Right: Test 80*4 pixel device with conventional bond pads (far right). Device tested and working. • Left: 80*70 ‘4S’ ASIC shows small non-pixel region on 4th side. Note no bond pads visible so can only test when TSVs are in place.

  3. I/O TSV with T-Micro • Plan: • T-Micro now processing 2 wafers. Ready August. • Mechanics and test system ready for wire bonding to standard Hexitec readout system.

  4. 3DIC EMFT

  5. 3DIC EMFT Processing steps nearly finished except final SLID bonding. See top of W vias (3*10um) through connect area.

  6. 3DIC EMFT Back of W vias (3*10um) through wafer. Back of vias filled after Al and copper electroplating. Ready now for Sn and SLID.

  7. 3DIC EMFT • Plan: • SLID Bonding happening this week. • Then checking and device segmentation. • Parts will be shipped to RAL for wire bonding and start of testing on electronic test system.