1 / 3

USQCD ILDG Data Generation Plans

USQCD ILDG Data Generation Plans. MILC (UKQCD coordination) Asqtad Nf = 2+1 a = 0.09 fm 40^3 x 96 m_ud = 0.1 m_s Asqtad Nf = 2+1 a = 0.06 fm 48^3 x 144 m_ud = 0.4 m_s and 0.2 m_s ILDG availability ASAP ~6 mo after hep-lat. USQCD ILDG Data Generation Plans.

brick
Download Presentation

USQCD ILDG Data Generation Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. USQCD ILDG Data Generation Plans • MILC (UKQCD coordination) • Asqtad Nf = 2+1 • a = 0.09 fm • 40^3 x 96 • m_ud = 0.1 m_s • Asqtad Nf = 2+1 • a = 0.06 fm • 48^3 x 144 • m_ud = 0.4 m_s and 0.2 m_s • ILDG availability ASAP ~6 mo after hep-lat

  2. USQCD ILDG Data Generation Plans • LHPC (UKQCD coordination) • DWF 2+1 (tentative, after exploration) • 24^3 x 64 • m_pi ~ 350 MeV/c^2 • ILDG availability under discussion

  3. USQCD ILDG Data Generation Plans • RBC • DWF Nf = 2+1 (UKQCD coordination) • a = 1.1fm • 24^3 x 64 • m_ud >= 0.2 m_s • P4 staggered Nf = 2+1 (Bielefeld coord.) • N_t = 4, 6 N_s = various • m_ud small • ILDG availability 6 months after hep-lat.

More Related