1 / 11

EU project Advanced industrial microseismic monitoring (AIM)

EU project Advanced industrial microseismic monitoring (AIM). First annual meeting, Bratislava. Advanced industrial microseismic monitoring (AIM). Research and visits in the first and second years. Visits realized in the first year.

burton
Download Presentation

EU project Advanced industrial microseismic monitoring (AIM)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EU projectAdvanced industrial microseismic monitoring(AIM) First annual meeting, Bratislava

  2. Advanced industrial microseismic monitoring(AIM) Research and visits in the first and second years

  3. Visits realized in the first year • IG Lötter (ISS), Iversen (NORSAR), Sekereš (PROG), Sekerešová (PROG), Trifu (ESG), Kühn (NORSAR) • NORSAR Fischer (IG), Vavryčuk (IG) • PROG Brož (IRSM), Bulant (DGCU), Fojtíková (SAS), Gális (SAS), Jechumtálová (IG), Kristeková (SAS), Málek (IRSM), Šílený (IG), Štrunc (IRSM), Vavryčuk (IG) • DGCU no visits • IRSM no visits • ISS no visits • ESG no visits

  4. Visits planned for the second year • IG Lötter (ISS), Iversen (NORSAR), Trifu (ESG), Kühn (NORSAR), Oye (NORSAR) • NORSAR Fischer (IG), Vavryčuk (IG), Bulant (DGCU) • PROG Brož (IRSM), Bulant (DGCU), Fojtíková (SAS), Gális (SAS), Jechumtálová (IG), Kristeková (SAS), Málek (IRSM), Šílený (IG), Štrunc (IRSM), Vavryčuk (IG) • DGCU no visits • IRSM Sekereš (PROG), Sekerešová (PROG) • ISS Adamová (IG), Šílený (IG) • ESG Adamová (IG), Šílený (IG), Vavryčuk (IG)

  5. Length and schedule of visits • Total length is 2 months at least • each visitor at one host institution • Schedule is flexible • depends on the capacity of the host organization • Stays can be split • but no extra travel expenses are covered! • Visits must be approved • by the coordinator • by the host organization

  6. Research priorities in the first year • Academic partners: • theoretical methods in microseismic monitoring • numerical tests of various MT inversions • error analyses for configurations simulating the real datasets • Industrial partners: • defining suitable datasets • getting permissions from clients • collection of seismic data, basic preprocessing • building the structure models

  7. Publicationsin the first year • Bulant, P., 2010. Smoothing the 1-D velocity model of Dobrá Voda for ray tracing, in: Seismic Waves in Complex 3-D Structures, Report 20, 17-27, Department of Geophysics, Charles University, Prague. • Fojtíková, L., Vavryčuk, V., 2010. Focal mechanisms of micro-earthquakes in seismoactive area in  Malé Karpaty Mts., Slovakia, workshop "Earthquake Source Dynamics", Smolenice, June 27 - July 1, 2010, poster. • Fojtíková, L., Vavryčuk, V., Cipciar, A., Madarás, J., 2010. Focal mechanisms of micro-earthquakes in the Dobrá Voda seismoactive area in the Malé Karpaty Mts. (Little Carpathians), Slovakia, Tectonophysics, 492, 213-229.  • Fojtíková, L., Vavryčuk, V., Kristeková, M., 2010. Focal mechanisms and moment tensors of micro-earthquakes in the Malé Karpaty (Little Carpathians) Mts., Slovakia, conference "General Assembly of the European Seismological Commission", Montpellier, September 6-10, 2010, poster.   • Jechumtálová, Z., Bulant, P., Šílený, J., Fojtíková, L., 2010. 1-D versus 3-D structural model in seismic source studies, workshop "Seismic Waves in Laterally Inhomogeneous Media VII", Teplá, June 21-26, 2010, poster. • Šílený, J., Lotter, E., 2010. Moment tensors of mining tremors, conference "General Assembly of the European Seismological Commission", Montpellier, September 6-10, 2010, oral presentation.

  8. Research priorities in the second year • Academic partners: • new approaches in MT inversions • tests of robustness of MT inversions • analysis of datasets provided by industrial partners • Industrial partners: • defining new suitable datasets • collection of seismic data, basic preprocessing • building the structure models

  9. Specific tasks in the second year Dobrá Voda dataset • instalation of a small-aperture array at the Dobrá voda area • building a more accurate 3-D structure model • relocation of selected micro-earthquakes • calculating FD Green’s functions for the 3-D model • application of the amplitude MT inversion with including amplitudes of S waves • waveform MT inversions from optimally filtered data Other datasets • tests of applicability of the higher-order MT inversion to mining data • application of the waveform MT inversion to data of Pyhäsalmi ore mine, Findland • case studies of MT inversions in the Ridgeway gold mine, Australia, Driefontein gold mine, S.Africa and Moab Khotsong gold mine, S.Africa IG:filling two postdoc positions

  10. Recommendations of the project research committee Redistribution of visits originally proposed to NORSAR to visits to ESG • NORSAR has a limited capacity for hosting academic visitors: Fischer (IG), Vavryčuk (IG), Bulant (DGCU) • no visits are planned to ESG in the current schedule of visits (decision of the administration staff in Brussels) • ESG has a capacity for hosting visitors and is interested in being more involved in the AIM project

More Related