1 / 3

GKP

Connectivity Of Proposed CMS at Diesel Lobbies (N.E. Rly.) As on 01.10.2006. GKP Stn . RUPC. Mau . To CRIS. KGM. FBD. BC. SV . KPV. GKP . 64Kbps. IZN . CPR . PBE. BTT . 64Kbps. 64 Kbps. GD . KSJ. LJN . BSB . 64Kbps. LJN Stn. MLN . BUI . To CRIS . BSB NE .

dante
Download Presentation

GKP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Connectivity Of Proposed CMS at Diesel Lobbies (N.E. Rly.) As on 01.10.2006 GKP Stn RUPC Mau To CRIS KGM FBD BC SV KPV GKP 64Kbps IZN CPR PBE BTT 64Kbps 64 Kbps GD KSJ LJN BSB 64Kbps LJN Stn MLN BUI To CRIS BSB NE Legend Proposed CMS LOCATION CMS locationsproposed by COM 16 New proposed BSNL Channel (12Nos) New proposed Rly Channel (07 Nos) Wireless LAN connectivity (16 Nos) Exiting BSNL Channel (06 Nos) ExitingRly Channel (06 Nos) SSE/Tele/FOIS Existing FOIS Router 64 Kbps (07 Nos) New proposed Router 64 Kbps (11 Nos) Existing ISDN (04 Nos) New proposed ISDN (12 Nos) SNM/FOIS

  2. Connectivity Of COIS Phase -IIwith Existing FOIS Network (N.E. Rly.) As on 01.10.2006 STM Coaching Cardex Section GKP SM CTNL CTNC Spare CTNC To CRIS Kathgodam GKP HQ CTNC Chappra RUPC AOM Coaching Manduadih CTNL CTNC Izzat Nagar RMS AOM Coaching To CRIS CTNL To CRIS AOM Coaching Varanasi RMS CTNC (LJN Stn) CTNL Lucknow RMS Legend Proposed COIS LOCATION Phase-II COIS locationsproposed by STM/Coaching and Sanctioned by CRIS 17 COIS locations (Commissioned) 08 Existing 64 Kbps BSNL Ch. (06 Nos) Existing 64 Kbps Rly Ch. (04 Nos) Proposed Rly Ch. Between MAU & BSB. (01 No) Proposed BSNL Ch. Between MUV & BSB , LJN CTNL & LJN Stn, IZN & KGM and KGM & RUPC. (04 Nos) Rly OFC Ch. Between FOIS/CTNL /LJN & CTNC/LJN Stn. (01 No) SSE/Tele/FOIS Existing FOIS Router 64 Kbps required to be upgraded by 2 Mbps (04 Nos) New proposed COIS Router 64 Kbps for KGM & MUV (02 Nos) Commissioned 64 Kbps Router (03 Nos) Existing ISDN (04 Nos) SNM/FOIS

  3. FOIS Connectivity on N.E.Rly. (As on 01.10.2006) Gorakhpur Yard RMS CCM Office RATE Office Nakaha Jungle TMS Gorakhpur RMS Sivan TMS Chhapra TMS To CRIS Chhapra RMS Narayanpur Anant RMS(E.C.Rly) Haldi Road TMS Lalkuan TMS Rudrapur City TMS Sonpur RMS (E.C.Rly) Basti TMS Traffic A/C Office Gonda RMS Izzat Nagar RMS Mau TMS Samastipur RMS(E.C.Rly) Gonda TMS Gonda Kachehari TMS Barauni RMS(E.C.Rly) Lucknow RMS Baitalpur TMS Kusumhi TMS Deoria Sadar TMS Varanasi RMS To CRIS LEGEND V-Sat ISDN Router 64 Kbps Rly 64 Kbps BSNL 64 Kbps Rly Proposed 64 Kbps BSNL Proposed SSE/Tele/FOIS Phase-I RMS locations (Commisioned) 07 Phase-II TMS locations (Commisioned)05 Proposed TMS locations by COM (To be Commisioned) 08 Other locations (Commissioned) 01 Other locations ( To be Commissioned) 02 ______ Total No. of locations 23 SNM/FOIS

More Related