An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Desalination & Clean Water Technology Industry-Government Forum August 23, 2012 Roger Bailey Public Utilities Director

  2. Policy Development • Water Supply Reliability • Local Supply Development • Legal Constraints • Natural Disasters • State and Federal Regulations • Water and Waste Water Treatment Processes • Affordability for Ratepayers

  3. Water Supply: Seven-Year Average

  4. Water Supply Reliability • Limited local supplies • Increasing cost of imported water • Pumping restrictions • Recurring drought conditions • Internal population growth • Natural disasters

  5. State and Federal Regulations • Drinking Water Quality • Upgraded all three water treatment plants • Alvarado and Miramar – Ozone treatment • Otay – Chlorine Dioxide • National Pollutant Discharge Elimination System Permit • Modified Permit allows advanced primary treatment at Pt. Loma Waste Water Treatment Plant

  6. State and Federal Regulations • Greenhouse Gas Emission Reduction • AB 32 requirements • Energy/water/waste water nexus • Need technologies to improve reliability, treatment while reducing energy consumption • Water Conservation Mandate • 20% by 2020 • “Low hanging fruit” is taken – support new ideas

  7. Water and Waste Water Treatment • Upgraded all three water treatment plants • Alvarado and Miramar – Ozone treatment • Otay – Chlorine Dioxide • Modified Permit allows advanced primary treatment at Pt. Loma Waste Water Treatment Plant • Completed Recycled Water Study in July 2012 • Condition of Coastal Commission approval for 2010 NPDES permit

  8. Water Purification Demonstration Project • Operate one MGD facility • San Vicente Reservoir study • Define regulatory requirements • Conduct energy & economic analysis • Public education & outreach Components Outcomes • Validate treatment process • Gain regulatory approval • Evaluate cost • Public acceptance

  9. Recycled Water Study • Identify opportunities to increase recycling of wastewater for Indirect Potable Reuse (IPR)and Non-Potable Reuse (NPR) for a 2035 planning horizon • Determine the extent recycling can reduce wastewater flows to the Point Loma Wastewater Treatment Plant • Determine implementation costs

  10. Recycled Water Study • Two Forms of IPR Evaluated: • Groundwater Recharge • Reservoir Augmentation • Findings: • Groundwater basin size and data insufficient to determine potential recharge projects. Revisit when more data is available

  11. Recycled Water Study • Findings: • Two reservoirs deemed large enough to provide retention times within range required in draft groundwater recharge regulations • San Vicente Reservoir • Otay Reservoir

  12. Recycled Water StudyPrioritized Next Steps • Finalize the Water Purification Demonstration Project (Dec 2012) • Conduct Facility Siting Studies • Evaluate cost sharing concepts • Prepare Financing Plan • Integrate into Point Loma Waiver Process • Confirm Otay Reservoir IPR Potential

  13. Affordability for Ratepayers • Water and waste water service are fee based • Revenues for the system are derived from customers’ bills • The City has had success when State and Federal grant funds are available • Future enhancement to system must be financially beneficial for ratepayers

  14. Questions

  15. Back up slides to follow

  16. San Diego Water Reuse Timeline • 1993 City & County Water Authority propose Water Repurification Project • 1994 Congress passes the Ocean Pollution Reduction Act, allowing the City to reapply for a waiver that is later granted • 1994-1998 Planning, regulatory reviews & conditional approval (DPH), preliminary design on project (20 TAF or 18 MGD) • Fall 1998 Water Repurification Project becomes an issue in several closely contested political campaigns • Spring 1999 Project cancelled by City Council

  17. San Diego Water Reuse Timeline • 2002-2004 City enters into a settlement agreement with environmental groups committing to: • Evaluate improved ocean monitoring • Pilot test biological aerated filters • Conduct study on increased water reuse • 2004-2005 City undertakes Water Reuse Study • October 2007 City Council votes to proceed with the Demonstration Project  Water Purification Demonstration Project • November 2008 City Council approves temporary water rate increase to fund $11.8 million project • January 2009- Temporary water rates in effect August 2010

  18. Membrane Filtration • Side-by-side microfiltration (MF) & ultrafiltration (UF) to test effectiveness prior to reverse osmosis • Pressurized hollow fiber membranes • MF nominal pore size: 0.10 microns • UF nominal pore size: 0.02 microns

  19. Reverse Osmosis: Step Two • Same technology used by bottled water companies • Forces water under high pressure through sheets of plastic membrane • Demineralizes and purifies water

  20. Ultraviolet Light/Advanced Oxidation Process (UV/AOP) • RO permeate combines and feeds UV/AOP • Hydrogen peroxide (30%) injected upstream of UV at 3 mg/l • UV system utilizes low pressure/high output lamps • Single reactor, 72 lamp configuration Ultraviolet (UV) plus H2O2 Disinfection

  21. Testing & Monitoring Plan Objectives • Demonstrate proposed water purification technology will produce water quality that meets public health and reservoir augmentation criteria • Evaluate nutrient removal performance of the AWP Facility treatment train • Demonstrate integrity monitoring techniques and performance reliability measures • Monitor and collect operational and maintenance requirements of the AWP Facility equipment

  22. Water Quality Results - Overview • Exceptional overall water quality, met all project treatment goals • Purified water met all drinking water standards • Equipment at each step in the treatment process is performing properly

  23. San Vicente Limnology and Reservoir Detention Study • Dam to be raised 117 feet • Currently 90,000 acre-feet • 242,000 acre-feet after dam raise • Construction duration 2009-2013 • Augmentation would improve water quality