An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ch 3 Manufacturing Models and Metrics Sections: • Mathematical Models of Production Performance • Manufacturing Costs 1

  2. Why use metrics “A system of related measures that facilitates the quantification of some particular characteristic” • To track performance in successive periods, • Try out new technologies and systems to determine their merits, identify their problems, • To compare alternative methods, and • To make good decisions. 2

  3. Production Concepts and Mathematical Models Production performance metrics: • Production rate Rpfor an individual processing or assembly operation is usually expressed as an hourly rate, that is, number of work units completed per hour (pc/hr). • Cycle time Tcis defined as the time that one work unit spends being processed or assembled. It is the time between when one work unit begins processing or assembly and when the next unit begins. 3

  4. Production Concepts and Mathematical Models Production performance metrics: • Production capacity PC • Utilization U • Availability A • Manufacturing lead time MLT • Work-in-progress WIP 4

  5. Operation Cycle Time Typical cycle time for a production operation: Tc = To + Th + Tth where Tc = cycle time (min/pc), To = processing time for the operation (min/pc), Th = handling time (min/pc) (e.g., loading and unloading the productionmachine), and Tth = tool handling time (min/pc) (e.g., time to change tools) 5

  6. Production Rate (batch/job shop/flow) Batch production: Batch time Tb = Tsu + QTc where Tb= batch processing time (min) Tsu= setup time to prepare for the batch (min) Q= batch quantity (pc) Tc = cycle time per work unit (min/cycle) Average production time per work unit Tp Tp = Tb/Q= Tsu/Q + Tc Hourly production rateRp= 60/Tp 6

  7. Production Rate (batch/job shop/flow) Job shop production: For Q = 1, Tp = Tsu + Tc For Q > 1, Tp is determined as in batch production Mass production: RpRc = 60/Tcsince Tsu/Q 0 (Q is very large) where Rc = operation cycle rate of the machine (pc/hr) Tc = operation cycle time (min/pc) 7

  8. Production Rate (batch/job shop/flow) Flow line production: Bottleneck station is the station with the largest operation time (with highest utilization) Tc = Tr + Max To Tc = cycle time of the production line (min/cycle) Tr = time to transfer work units between workstations each cycle (min/cycle) Max T0 = operation time at the bottleneck station (min/cycle) Rc = 60/Tc Rc = theoretical (ideal) production rate (cycles/hr) 8

  9. Production Capacity “Max rate of output that a production facility is able to produce under a given set of assumed operating conditions” Operating conditions: • Number of shifts per day • Number of days per week • Employment levels Awork center is a manufacturing system in the plant typically consisting of one worker and one machine. 9

  10. Production Capacity Plant capacity for facility in which parts are made in one operation (no = 1): PC = n Sw Hsh Rp where PC = weekly plant capacity (units/wk) n = number of work centers working in parallel Sw = number of shifts per week Hsh = hr/shift Rp = hourly production rate of each work center (output units/hr) 10

  11. Production Capacity Plant capacity for facility in which parts require multiple operations (no > 1): PCw = where no = number of operations in the routing 11

  12. Production Capacity This capacity model assumes that all n machines are producing 100% of the time and there are no bottleneck operations due to variations in process routings to inhibit smooth flow of work through the plant. There are some operations that are fully utilized while other operations occasionally stand idle waiting for work. That is, utilization varies. 12

  13. Utilization and Availability Utilization: U = where Q = quantity actually produced, and PC = plant capacity “the amount of output of a production facility relative to its capacity” Utilization can be assessed for an entire plant, a single machine in the plant or any other productive resource. 13

  14. Utilization and Availability Availability: A = where MTBF = mean time between failures, and MTTR = mean time to repair “a common measure for reliability of equipment” 14

  15. Availability - MTBF and MTTR Defined 15

  16. Manufacturing Lead Time where MLTj = manufacturing lead time for part or product j (min) Tsuji = setup time for operation i (min) Qj = quantity of part or product j in the batch being processed (pc) Tcji= operation cycle time for operation i (min/pc) Tnoji = non-operation time (handling, temporary storage, inspections) associated with operation i (min) “the total time required to process a given part/product through the plant including any lost time due to delays, time spent in storage, reliability problems, and so on” 16

  17. Manufacturing Lead Time MLT = no (Tsu + QTc + Tno) where MLT = manufacturing lead time, no = number of operations, Tsu = setup time, Q = batch quantity, Tc= cycle time per part, and Tno = non-operation time (handling, temporary storage, inspections) 17

  18. Manufacturing Lead Time Job shop when Q=1 MLT = no (Tsu + Tc + Tno) Mass production when Q MLT = noQTc Flow line MLT = no (Tr + MaxTo) = noTc 18

  19. Work-In-Process WIP = where WIP = work-in-process, pc; A = availability, U = utilization, PC = plant capacity, pc/wk; MLT = manufacturing lead time, wk; Sw = shifts per week, Hsh = hours per shift, hr/shift “quantity of parts or products currently located in the factory that are either being processed or between processing operations” “the inventory in the state of being transformed from raw material to finished product” 19

  20. Costs of Manufacturing Operations • Two major categories of manufacturing costs: • Fixed costs - remain constant for any output level • Variable costs - vary in proportion to production output level • Adding fixed and variable costs TC = FC + VC(Q) where TC = total costs, FC = fixed costs (e.g., building, equipment, taxes), VC = variable costs (e.g., labor, materials, utilities), Q = output level. 20

  21. Fixed and Variable Costs 21

  22. Manufacturing Costs • Alternative classification of manufacturing costs: • Direct labor - wages and benefits paid to workers • Materials - costs of raw materials • Overhead - all of the other expenses associated with running the manufacturing firm • Factory overheadconsists of the costs of operating the factory other than direct labor and materials. • Corporate overhead is the cost not related to the company’s manufacturing activities. 22

  23. Typical Manufacturing Costs 23

  24. Overhead Rates Factory overhead rate: FOHR = Corporate overhead rate:COHR = where FOHC=annual factory overhead costs ($/yr) COHC= annual corporate overhead costs ($/yr) DLC = annual direct labor costs ($/yr) 24

  25. Example 3.5 Determine • The factory overhead rate for each plant • The corporate overhead rate 25

  26. Cost of Equipment Usage Hourly cost of worker-machine system: Co = CL(1 + FOHRL) + Cm(1 + FOHRm) where Co = hourly rate, $/hr; CL = labor rate, $/hr; FOHRL = labor factory overhead rate, Cm = machine rate, $/hr; FOHRm = machine factory overhead rate 26

  27. Averaging Procedures for Production Models 27

  28. Averaging Procedures for Production Models 28

  29. Averaging Procedures for Production Models 29

  30. Averaging Procedures for Production Models 30

  31. Averaging Procedures for Production Models 31

  32. Averaging Procedures for Production Models 32

  33. Averaging Procedures for Production Models 33

  34. Averaging Procedures for Production Models 34