An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESS: Machine Protection considerations and BIS architecture Apollonio andrea.apollonio@cern.ch Acknowledgments: D. Curry, A. Nordt, R. Schmidt

  2. Outline • Introduction to ESS • Linac4 Comparison • ESS MPS and BIS Architecture • Conclusions

  3. Outline • Introduction to ESS • Linac4 Comparison • ESS MPS and BIS Architecture • Conclusions

  4. Overview • The European Spallation Source (ESS) will house the most powerful proton linac ever built. • The average beam power will be 5 MW which is five times greater than SNS. • The peak beam power will be 125 MW which is over seven times greater than SNS • ESS is located in southern Sweden adjacent to MAX-IV (A 4th generation light source) • To provide a world-class material research center for Europe Lund (Sweden) [1]

  5. What is ESS? • ESS is a neutron spallation source for neutron scattering measurements. • Neutron scattering offers a complementary view of matter • in comparison to other probes such as x-rays from synchrotron light sources. • The scattering cross section of many elements can be much larger for neutrons than for photons. [1]

  6. Neutron Scattering • Neutron scattering can reveal the molecular and magnetic structure and behavior of materials, such as: • Structural biology and biotechnology, magnetism and superconductivity, chemical and engineering materials, nanotechnology, complex fluids, and others X-Ray Image  Neutron scattering of hydrogen in a metal organic framework  Neutron radiograph of a flower corsage Neutron radiograph [1]

  7. What is Different About ESS? Average Linac Current Output Energy Repetition Rate Pulse Length • The average proton beam power will be 5 MW • Average neutron flux is proportional to average beam power • 5 MW is five times greater than SNS beam power • The total proton energy per pulse will be 360 kJ • Beam brightness (neutrons per pulse) is proportional to total proton energy per pulse • 360 kJ is over 20 times greater than SNS total proton energy per pulse = 62.5 mA * 2 GeV * 14 Hz * 2.86 ms [1]

  8. Outline • Introduction to ESS • Linac4 Comparison • ESS MPS and BIS Architecture • Conclusions

  9. Linac4: Layout 45keV 3MeV 50MeV 100MeV 160MeV LEBT H-Source RFQ MEBT DTL CCDTL PIMS Transfer Line Low Energy Beam Transfer Medium Energy Beam Transfer Coupled Cell Drift Tube Linac Drift Tube Linac Pi Mode Structure Radio- Frequency Quadrupole acceleration acceleration RFQ DTL PiMS Courtesy L. Hein

  10. Linac4 MPS: requirements • Focus of Linac4 MPS: • Availability: target >95% • Activation: above 10 MeV in case of beam losses [2] • Damage: very low risk of significant damage in case of ‘single pulse losses’ • Optimization of proton delivery to the different destinations • MPS requirements: • Highly dependable (almost same HW as LHC BIS) • Reaction time within the same pulse (<400us) • Allow for flexible operation (SIS + External Conditions) • MPS requirements during commissioning depend on: • Energy reached • Bunch intensity • Users availability

  11. LINAC4 BIS: Architecture [3]

  12. BIS ACTIONS • ‘psb ejection’ Master bic • disable the extraction kickers • magnet current acquisitions at extraction time surveyed in addition via the SIS • ‘choppers’ Master bic: • Action on the Pre-chopper at 45 keV • For redundancy, action on the chopperat 3 MeV • In addition, the PSB RF is disabled in case some beam still reaches the PSB • ‘Source RF’ Master bic: • Action on the Source RF in order to inhibit the RF voltage • For redundancy, action on the Pre-chopper in order to deflect the beam at 45 keV • To preserve the Linac4 Source stability, it is always better to act on the choppers to stop the beam, when possible

  13. Outline • Introduction to ESS • Linac4 Comparison • ESS MPS and BIS Architecture • Conclusions

  14. ESS: Layout and Parameters

  15. ESS: Target Tungsten target with rotating wheel 33 sectors with cooling channels (Helium) Synchronized to 14 Hz Target Monolith r=6m, h=10m He flow around slices Wheel Proton Beam Window 2mm gap Beam Ports Angular sectors Courtesy A. Nordt

  16. 2 Weeks at ESS: MPS Activities • A risk analysis on a system basis had already been carried out • Several meetings per day with different system experts to investigate possible failures and failure effects • Use of Jira + personal notes to keep trace of work progress • ‘Spread’ the idea of a Beam Interlock System • Define competences of MPS and responsibilities of User systems • Outcomes: • Failure modes and effects system by system • System dependencies • Identification of signals required for MPS (type and number) • Definition of Beam modesand Machine modes • Ideas for the commissioning phase • Definition of a suitable BIS architecture • Document on outcomes of the work

  17. Example: Warm Linac • Source • Solenoids • Steerers • Quadrupoles • BCTs • BLMs • BPMs • Faraday Cups • Wire Scanners • Absorbers • Collimators • Iris • Choppers • Vacuum Valves • RF cavities

  18. Linac Interlocks and Actuators • No “LHC-type” beam dump (kickers + dump line) • The beam has to be stopped in the Linac at the lowest possible energy by the actuators • Actuators are typically: Source and Choppers • No way to cut the portion of beam downstream the MEBT • Reaction time of the BIS has to be within the same pulse when a failure occurs • Some peculiar Linac Interlocks: • BCMs current difference • Measures the transmission between two points • Alternative to BLMs (only option at low energy) • IRIS • 8 blades, variable aperture to change beam current • Complex device, cooling monitored • BI moving devices (e.g. Faraday Cups): • Position has to be interlocked

  19. ESS MPS: requirements • Focus of ESS MPS: • Availability: target 95% • Activation: above 10 MeV in case of beam losses • Damage: risk of significantdamage in case of • ‘single pulse losses’ even at low energy • Synchronization with the Target • ‘Errant Beams’ [4] • MPS requirements: • Highly dependable • Reaction time within: 10 us • Allow for operation up to different sections of the Linac • Actuators response times: • Source: 100 us • LEBT chopper: 100 ns • MEBT chopper: 10 ns

  20. ESS BIS: Architecture Courtesy A. Nordt • ESS Source can be switched OFF without losing stability (always activated)

  21. ESS BIS: Architecture Courtesy A. Nordt • One more actuator could be represented by the RF of the RFQ (SNS)

  22. ESS BIS: MASTER LEVEL 1 • The Iris will be a critical component (design and interlock) • Damage potential already in the LEBT (0.5 kW beam power) • 1st beam destination: LEBT FC • Input from Master Level 2 • Input monitoring the effect of the chopper (ChON + current in BCM2 = failure)

  23. ESS BIS: MASTER LEVEL 2 • Monitors Beam destinations (FCs + Dump + Target) • Current in the dogleg monitored and correlated with the beam destination • Definition of destinations for the commissioning and test phases

  24. ESS BIS: SLAVE MEBT • RFQ absorber and Chopper Dump: damage risk already at low energy • BCMs current differences (transmission): main tool to detect losses at low energy (below BLMs sensitivity) • RF interlocks: 1 per RF cell • Chopper: both User and Actuator

  25. ESS BIS: SLAVE SPOKES + MBETA1 • BLMs start to be in their sensitivity range • Cryo OK signal for start up (as LHC) • Possiblility of fast losses due to power supplies failures of the steerers

  26. Availability Model: Isograph Failure rates and recovery times from the failure catalogue: ~99% availability Work in progress: ESS Availability Model in Isograph Benchmark for Linac4 Availability Model Paper to IPAC’14 in collaboration with ESS

  27. Outline • Introduction to ESS • Linac4 Comparison • ESS MPS and BIS Architecture • Conclusions

  28. Conclusions • A possible architecture for the ESS BIS was designed • A document will soon be released summarizing these studies • ESS availabilitymodel is under work (benchmark for Linac4 availability model) Personal remarks: • Previous experience with Linac4 was a fundamental starting point • this very intensive way of working was very fruitful and allowed reaching an ambitious goal in a very short time

  29. THANKS A LOT FOR YOUR ATTENTION! References: [1] slides 4-7: “The European Spallation Source”, D. McGinnis, PLC Workshop 2013. [2] “Predictions of induced radioactivity and residual dose rates in Linac4” F. P. Della Torre, M. Silari, EDMS 1304119 (2013) [3] “Beam Interlock specifications for Linac4, transfer lines and PS Booster with Linac4”, B. Mikulec et al. EDMS 1016233 (2013).  [4] “Errant Beam Update”, Accelerator Advisory Committee, C. Peters, Accelerator Operations Machine Specialist, 7 May 2013

  30. Why is errant beam important • Errant beam mechanism • Beam hitting cavity surface desorbs gas or particulates creating an environment for arcing • Super Conducting Linac (SCL) cavity performance degrades over time • SCL cavities do not trip with every errant beam pulse, but the probability for a trip increases with time • Cavity fields have been lowered and cavities have been turned off which results in lower beam energy • SCL cavity performance degradation from errant beam can be restored (except for cavity 06c) • Requires cavity warm up during a long shutdown and then RF conditioning before beginning beam operation • Cryomodules have been removed from the tunnel for cavity RF coupler repairs but this takes months [3]

  31. SLAVE 2: DTL

  32. SLAVE 3: Spokes + MBeta

  33. SLAVE 4: Mbeta + HBeta

  34. SLAVE 5: Dump Line

  35. SLAVE 6: Target Line • Collimators in front to proton beam window interlocked? • Rastering can be off for low intensity

  36. Example of Input Signal to the MIS Magnet current surveillance: Current Bend_DUMP = 0 Current Bend_TARGET = 1 I(t) Beam to the target 100 A Current Bend_DUMP = 0 Current Bend_TARGET = 0 Current Bend_DUMP = 1 Current Bend_TARGET = 0 0 A Beam to the dump Beam to the dump Operational Mode