SIP 3

SIP 3. Day of Surgery: After first incision until midnight. Process Flow. 1 st Patient. OR. PACU. Discharge/ Floor. 2 nd Patient. Floor/ Check-In. Pre-Op. OR. PACU. Discharge/ Floor. 3 rd Patient. Floor/ Check-In. Pre-Op. OR. PACU. Discharge/ Floor. Call for next patient.

gbarrios
Download Presentation

SIP 3

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SIP 3 Day of Surgery: After first incision until midnight

  2. Process Flow 1st Patient OR PACU Discharge/ Floor 2nd Patient Floor/ Check-In Pre-Op OR PACU Discharge/ Floor 3rd Patient Floor/ Check-In Pre-Op OR PACU Discharge/ Floor

  3. Call for next patient Close Patient 1: Pt Out OR Pt ready to go to OR Patient 2: Pt In OR IP PAV Data • An overlap of activities occurs between the current case and the following case, playing a vital role into the continuum of the OR day

  4. Data • Average turnover time and prep time vary according to site: • Main: 71 min • Main Annex: 63 min • Pavilion: 48 min • Roosevelt: 34 min

  5. Issues • Hand-offs of patients and between staff make transitions difficult • The process is not visible and staff do not know if and when critical activities have occurred • Information sharing via paper or verbal does not happen in a timely manner • Changes in plans are not communicated to everyone • Paging or contacting the appropriate staff/faculty is time consuming and difficult • A balance must be made between surgery and education

  6. Analysis • Communication plays a major role in all aspects of the process • By reducing the turnover time and prep time, it will allow for maximum amount of OR utilization for patient safety

  7. Key Areas of Focus • Communication at Hand-Off • “Briefing” • Turnovers • TBA and Emergent/Urgent Case Management

  8. Obstacles • Culture – Everyone must work together as a team to meet a common goal • Culture – Each individual does not need to be efficient as long as the entire system is effective • Political – Each “group” has their own agenda

  9. Current Activities • 5S Events • Equipments (x2) • Turnover Prep • RPI’s - Turnover • Team Projects • Standardized Report at Hand-off • Briefing of the rest of the day