Introduction to Georgia Power & Gas Infrastructure Project (PGIP)

Introduction to Georgia Power & Gas Infrastructure Project (PGIP) . Introduction to PGIP. Contract A task order under global A/E IQC that Tetra Tech holds Date: Signed on May 21 st , 2010 Duration: 30 months Contract Type: Cost plus fee Management: Osvaldo Juvier COP

hedva
Download Presentation

Introduction to Georgia Power & Gas Infrastructure Project (PGIP)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction toGeorgia Power & Gas Infrastructure Project (PGIP)

  2. Introduction to PGIP • Contract • A task order under global A/E IQC that Tetra Tech holds • Date: Signed on May 21st, 2010 • Duration: 30 months • Contract Type: Cost plus fee • Management: • Osvaldo Juvier COP • Mamuka Kikalishvili DCOP • Home Office Support (Tetra Tech, Inc) • Subcontractors: • POWER Engineers, Inc , US –Electrical Component • Trow Engineering Consultants, Inc, US-Gas Component

  3. Components Component 1: Electricity Transmission Upgrade, Reconstruction, and Operation: Electricity Transmission Upgrade, Reconstruction, and Operation • Reconstructing the 220kV Senaki power lines dismantled during Georgia’s 1992 Civil War; • Constructing new power substations to support the Senaki line; • Identifying and installing smart grid technologies; and  • Implementing operational controls to improve efficiency and reduce risks in transmission management.

  4. Components Component 2: Gas Transit Infrastructure Construction, Replacement, and Rehabilitation : Gas Transit Infrastructure Construction, Replacement, and Rehabilitation  • Phase I: Constructing a new 30.6 km, 700 mm gas pipeline from Senaki to Poti/FIZ; • Phase II: Replacing 12 km of undersized pipeline sections with new 700 mm piping; and  • Phase III: Rehabilitating 48.3 km of leaking 700 mm pipe between Saguramo and Sachkhere. • PotiProject 90% Complete