Consultant Selection

Consultant Selection. ACEC-Illinois/ IDOT-Region 1 Local Roads Seminar March 7, 2013. Kevin Burke III, P.E. Local Policy & Technology Engineer kevin.burkeiii@illinois.gov 217.785.5048. Outline. When QBS Is Required QBS Process Types of Consultant Contracts Length of Services

Download Presentation

Consultant Selection

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Consultant Selection ACEC-Illinois/ IDOT-Region 1 Local Roads Seminar March 7, 2013

  2. Kevin Burke III, P.E. Local Policy & Technology Engineer kevin.burkeiii@illinois.gov 217.785.5048

  3. Outline • When QBS Is Required • QBS Process • Types of Consultant Contracts • Length of Services • Conflict of Interests

  4. When QBS IS Required • Federal Funds • Total contract exceeds $150,000 • Contract value determine by phase • Unless, same consultant performing multiple phases • State Funds • Not an emergency • Total contract exceeds $25,000 • No existing relationship* • Local Public Agency (LPA) not home rule unit

  5. QBS Process • Define Project • Public Notice • Evaluation • Selection • Contract Negotiation

  6. Define the Project • Need, Purpose, and Objective • Various Components • Timetable • Unique Situations or Known Problems • Budget • DO NOT REQUEST COST INFORMATION • Required for Existing Relationship

  7. Types of Engineering Contracts/ Length of Service • Project Specific • Multiphase • Master Task Order • Maximum Length 10 Years

  8. Public Notice • Mail Notice or Publish in Newspaper • Request Statement of Interest • DO NOT REQUEST COST INFORMATION • Electronic Notifications?

  9. Evaluation • Evaluate All Proposals • Eliminate Non-Qualified Respondents • May Consider Requiring Presentations • Minimum of three (or all qualified) • DO NOT CONSIDER COST

  10. Selection • Minimum of Three • Contact Highest Ranking for Negotiation • Repeat if Necessary

  11. Negotiation • Fair and Reasonable Compensation • Ensure Scope Is Understood • Refine and/or Amend Scope • Establish • Project Schedule • Manpower Requirement • Responsibility • Execute Agreement

  12. Compensation Formulas • Lump Sum (FA, State, MFT) • Specific Rate (FA, State, MFT) • Cost Plus Fixed Fee (FA, State, MFT) • Direct Labor Multiplier (State, MFT) • Actual Cost (State, MFT) • Base Fee (MFT Maintenance)

  13. Conflict of Interests • Actual or Appearance • LPA Official with Interest • Interest in Acquired Property • Design and Construction Consultant

  14. Phase III Issues • In Responsible Charge • Resident Qualifications • Inspector Qualifications

  15. Questions