1 / 39

Resource Analysis

Resource Analysis. Objectives of Resource Assessment Discussion. The subject of the second part of the analysis is to dig more deeply into some of the issues discussed earlier. For example, we : Understand what factors are important and not very important in cost and benefit analysis

janna
Download Presentation

Resource Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Resource Analysis

  2. Objectives of Resource Assessment Discussion • The subject of the second part of the analysis is to dig more deeply into some of the issues discussed earlier. For example, we : • Understand what factors are important and not very important in cost and benefit analysis • Further elaborate on risk analysis • Evaluate tax benefits in different scenarios • Consider alternative structuring issues

  3. Wind Resource Assessment

  4. Wind Studies • The first step for the project lenders is to conduct an in-depth analysis of the owner's feasibility study and possibly even hire a consultant to conduct an independent feasibility study. Such studies will analyze the wind resource data and should demonstrate the financial viability of the project. These studies will detail technical, financial and other aspects of the project and are crucial to the lender in its risk assessment of the proposed project. • Independent Engineers compute the probability of different wind availability. However, these studies are based on the wind measurements for previous years and for a particular site, and while the studies accommodate the fact that the year in which the measurements were taken may have been a particular good or bad year, there is no guarantee that there will not be substantially less wind in the future. • Off-taking utilities are largely able to mitigate this risk because it is possible to get very accurate wind forecasts, which enables alternative sources to be used in order to maintain grid stability and supply if necessary. For the project itself, however, no wind means zero cash flow. • Such risk could, in theory, be hedged or covered by insurance, and while some attempts have been made in that respect, such tools are not yet a common feature and thus remain a risk which has to be factored in.

  5. Wind Speed Risk • A potential and significant risk for any energy project is the underlying resource for its generation – in this case wind. Identifying the availability of wind is paramount. This has two aspects. • The first is the question of whether a particular site has sufficient wind speeds. This issue is addressed by the lending banks insisting on long-term – usually at least 12 months – wind measurements, which are then used as the basis for a number of wind studies. Banks usually insist on at least two of those coming from reputable wind experts. These wind studies give an estimate of the annual electricity output of a project, based on a probability curve, usually 75% or 90%, that the project will generate x number of full load hours. Depending on the wind turbine used, there is therefore a 75% or 90% respectively, probability that the turbine will generate y kW/h per year when in service.

  6. Value of Renewable (Wind) on Market Basis • Assumptions • Wind Power Curve • Wind Capacity Factor • Wind Capital Cost • Net Energy Value of Wind • Required Subsidy

  7. Average Capacity Factors

  8. Source of Wind Data • www.knmi.nl • http://www.kma.go.kr/kor/weather/climate/climate_03_01.jsp?a=0&b=20&c=1&pop=temp_avg_135-2004.htm • CONSULT THE REPORTS AT THE SITE: • http://www.knmi.nl/samenw/hydra • http://www.ndbc.noaa.gov/station_history.phtml?station=41018 • http://www.ndbc.noaa.gov/station • http://lwf.ncdc.noaa.gov/oa/ncdc.html

  9. Power Curve of Wind Technology

  10. Wind Speed by Hour

  11. Wind Speed by Hour of Day and Month of Year

  12. Wind Speed Variation by Month

  13. Capacity Value of Wind • Assume to Production Cost Runs with the same amount of non-wind capacity, except that one case has some wind capacity • 1. Without Wind • 2. With Wind • The LOLE in the second case will be lower than the LOLE in the first case because in some high load hours, the wind farm will be running and lower the net load requirements for the other units. • The value of wind could be • LOLE reduction x Cost of outage • Eg • .000001 x 10,000 Won/kWh

  14. Weibull Distribution • In excel, =weibull(Wind Speed,C Factor (e.g. 2),Avg Speed/.89) • X = wind speed • K = Average Wind Speed/Gamma Factor = Average Wind Speed/.89 • C = 2

  15. RetScreen Reconciliation • Total energy delivered after losses and adjustments is 100,565 MWH • Capacity Factor is • Average Generation:100,565/8760 = 11,480 • Divided by 40,000 • Equals 28.7%

  16. Start with Monthly Wind Speeds • Before Working with the Power Curve and the Weibull distribution, adjustments to the wind speeds for height and wind density should be made:

  17. Compute Month by Month Wind Speeds • This table illustrates how the unadjusted wind speeds are adjusted

  18. Use the Weibull Distribution to Compute the Average Hourly Output by Month • This example shows the calculation for the first month. The index function can be used for the same calculation in other months

  19. Compute Total Production for Each Month • Compute the total production for one turbine for one year before adjustments for losses etc. using data table function in excel

  20. Adjust for Number of Turbines and Loss Factors

  21. Alternative Use of Weibull • Required Inputs

  22. Preliminary Calculations • This shows some calculations that are necessary

  23. Power Curve and Weibull

  24. Wiebull Distribution

  25. Raw Wind Speed Analysis

  26. Raw Wind Speed Data

  27. Actual Distribution vs Weibull

  28. Weibull versus Actual

  29. Alternative Power Curves

  30. Alternative Power Curves

  31. Variation in Average Wind Speeds

  32. Variation in Capacity Factor from Wind Speed Variations

  33. Solar Resource Analysis

  34. Solar Radiation in Energy per m2

  35. Capacity Factor

  36. Solar Production by Month

  37. Computation of Solar Energy per m2

  38. Clearness Index

More Related