1 / 7

STATUS

ICAO Seminar on Aeronautical spectrum management (Cairo, 7 – 17 June 2006) ULTRA WIDE BAND TECHNOLOGY A THREAT OR NOT TO AVIATION ? (presented by Eurocontrol). STATUS. TG 1/8 CLOSED THE UWB QUESTION IN ITU Autumn 2005

katieh
Download Presentation

STATUS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ICAO Seminar on Aeronautical spectrum management(Cairo, 7 – 17 June 2006)ULTRA WIDE BAND TECHNOLOGYA THREAT OR NOT TO AVIATION ?(presented by Eurocontrol)

  2. STATUS • TG 1/8 CLOSED THE UWB QUESTION IN ITU Autumn 2005 • Outcome: recommendation made however ultimate decision on UWB emission limits and regulation left with the State • TG 3 (The European technical study group), reviewed this decision and put forward proposed European limits to ECC • ECC consultation process • on general UWB applications closed on 24/12/05 • On 3.1-4.8 GHz applications closed on 29/05/06 • Aviations (EUROCONTROL + Adm.) complained for radars, radio- altimeters and MLS • Outcomes: 24/12/05 More stringent values in order to better protect primary radars

  3. ECC versus aviation limits

  4. So what is done/planned ? 1. Response to the consultation process 2. Testing of the 4 ‘threatened’ services with real UWB signal - UK Radar tests -DFS radar tests -Eurocontrol/EC PULSERS1 testing (emphasis should be on 9 GHz airport radar) 1 Pervasive Ultra Wideband Spectral Energy Radio Systems (PULSERS) – a European Industry/EC initiative

  5. UWB Allowable Field strength vs Distance UK TESTING

  6. DFS Testing • Bosch provide UWB-radar (wall probing, ..) simulators • No testing with UWB-communication with are the to-morrow mass market • Tested : PSR L an S bands, mode S, SSR • Outcomes: L band PSR is the most vulnerable to UWB-radar interference

  7. NEXT STEPS • Validation testing on the 4 affected systems, need cooperation with PULSERS • Participate in and influence ECC / TG3 closedown process as necessary

More Related