1 / 21

MANAGING DIRECTOR, KPTCL

POWER GRID CORPORATION OF INDIA LIMITED. SOUTHERN REGIONAL LOAD DESPATCH CENTRE. WELCOMES. MANAGING DIRECTOR, KPTCL. SR STATES – POWER SYSTEM STATISTICS. KARNATAKA INSTALLED CAPACITY – 5857 MW MAX DEMAND MET – 5445 MW DAILY CONSUMPTION MAX – 107 MU DAILY CONSUMPTION AVG – 84 MU

kyla-guzman
Download Presentation

MANAGING DIRECTOR, KPTCL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. POWER GRID CORPORATION OF INDIA LIMITED SOUTHERN REGIONAL LOAD DESPATCH CENTRE WELCOMES MANAGING DIRECTOR, KPTCL

  2. SR STATES – POWER SYSTEM STATISTICS KARNATAKA INSTALLED CAPACITY – 5857 MW MAX DEMAND MET – 5445 MW DAILY CONSUMPTION MAX – 107 MU DAILY CONSUMPTION AVG – 84 MU CONSUMER PROFILE – DOM INDU AGRI COMML OTHERS 37% 26% 33% 3% 1% . ANDHRA PRADESH INSTALLED CAPACITY – 9531 MW MAX DEMAND MET – 7441 MW DAILY CONSUMPTION MAX – 166 MU DAILY CONSUMPTION AVG – 130 MU CONSUMER PROFILE – DOM INDU AGRI COMML OTHERS 22% 29% 34% 5% 10% . TAMIL NADU INSTALLED CAPACITY – 7074 MW MAX DEMAND MET – 7228 MW DAILY CONSUMPTION MAX – 147 MU DAILY CONSUMPTION AVG – 126 MU CONSUMER PROFILE – DOM INDU AGRI COMML OTHERS 21% 33% 27% 9% 10% . KERALA INSTALLED CAPACITY – 2617 MW MAX DEMAND MET – 2426 MW DAILY CONSUMPTION MAX – 39 MU DAILY CONSUMPTION AVG – 34 MU CONSUMER PROFILE – DOM INDU AGRI COMML 76% 2% 6% 16%.

  3. INSTALLED CAPACITY IN SR The above capacity does not includes --- About 1344 MW of Wind Mill Capacity in Tamil Nadu. --- Micro and Captive plants in different states.

  4. OVER VIEW • CONSUMPTION PATTERN • HYDRO GENERATION • SCHEDULE VS DRAWAL PATTERN • LOAD CURVE • UTILISATION OF IPP’S TABLE

  5. SCHEDULE Vs DRAWAL AP KAR TN KER

  6. U I Schedule Vs Actual Drawal by AP Entitlement ά Capacity Charges 21-FEB-05 Schedule ά Energy Charges Actual Drawal Frequency

  7. U I Schedule Vs Actual Drawal by KAR 21-FEB-05 Entitlement ά Capacity Charges Actual Drawal Schedule ά Energy Charges Frequency

  8. U I Schedule Vs Actual Drawal by KER Entitlement ά Capacity Charges 21-FEB-05 Schedule ά Energy Charges Actual Drawal Frequency

  9. U I Schedule Vs Actual Drawal by TN Schedule ά Energy Charges 21-FEB-05 Entitlement ά Capacity Charges Actual Drawal Frequency

  10. U I Schedule Vs Injection by NTPC, Ramagundam Actual Injection 16-FEB-05 Declared Capacity ά Capacity Charges Schedule ά Energy Charges Frequency

  11. LOAD PATTERN AP KAR TN KER

  12. LOAD PATTERN OF ANDHARA PRADESH 04-FEB-05 Hydro Purchases Thermal ISGS

  13. LOAD PATTERN OF KARNATAKA 04-FEB-05 Hydro Purchases Thermal ISGS

  14. LOAD PATTERN OF KERALA 04-FEB-05 Hydro Purchases ISGS

  15. LOAD PATTERN OF TAMIL NADU 04-FEB-05 Hydro Purchases Thermal ISGS

  16. OPTIMAL RESERVOIR UTILISATIONSHARAVATHY IN KARNATAKA THE COST OF GENERATION AT SHARAVATHY IS LESS THAN 20 Ps /UNIT AVERAGE SELLING UI RATE OF KARNATAKA IS 372 Ps/UNIT Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs. PLANT OPERATORS AT SHARAVATHY THINK OF THE RESERVOIR LEVEL IN RUPEES RATHER THAN IN FEET!!! Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.

  17. SHARAVATHI GENERATION – TYPICAL DAY FREQ MW

  18. ENTITLEMENT OF KARNATAKA FROM ISGS

  19. INTER-REGIONAL EXCHANGES DETAILS UPTO 105 WKS (Till 26.12.04)

  20. MAJOR AND MINOR DISTURBANCES SINCE 1994 NO DISTURBANCES DESPITE LOSING ENTIRE SUPER GENERATING PLANTS LIKERAMAGUNDAM,VIJAYAWADA,KOTHAGUDEM, NORTH CHENNAI, SHARAVATHY ETC

More Related