An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Oil Spillage Contingency Plan – County Kerry Mick Boyce, S.E.E., Environment Department, Kerry County Council.

  2. Thanks to : • Conor Culloo; • Vincent Hayes; • SEA-PT (Hugh Conlon).

  3. Incidents (Kerry) : Ranga (1980) – Slea Head; Celestial Dawn (2002) – Dingle Harbour; Fidelma (2002) – Inish na bro (Blaskets).

  4. Purpose of the Plan : • A guide to aid in the coordination of response to a marine-based Oil/HNS incident; • To guide responders through the actions and decisions required to mount an effective response to a marine-based Oil/HNS incident; • A guide to limit/mitigate the effects of such an event.

  5. Background Context : • Legal requirement to produce appropriate plan (Sea Pollution Act); • Number of marine-based incidents around the coast of Kerry; • SEA-PT and Harbour Board plans already in place.

  6. Background Context (Contd.) : • County Oil Pollution Officer [COPO] in place (me!) – appointed by Manager’s Order; • Large KCC stock-pile built up over many years (TVH); • Members of SEA-PT; • In-house experience (previous incidents, training etc.)

  7. Plan preparation options: • Outsource; • In-house. Decision criteria : • Budgetary considerations; • Data gathering/local knowledge; • Availability of in-house knowledge and expertise; • Use of standard IRCG format (generic format and data). Final Decision : In-house

  8. Initial Stages of Plan preparation : • Staff member assigned to prepare the plan; • In-house group established to oversee the project ; • Internal and external consultations (state agencies and departments, NGOs etc.) - limited response; • Data gathering (assets at risk etc.); • Literature review (availability of generic material).

  9. Format : standard IRCG template; • Coverage : coastline (seashore) within the functional area of Kerry County Council (excluding SEA-PT and Harbour Board areas); • Preparation timeframe : approx. 3 months; • On-going review by implementation group during period of preparation of plan;

  10. Submission of various drafts to IRCG.; • Approved by IRCG in May, 2012; • Lifespan : 5 years; • Annual up-date/review.

  11. Main Elements of the Plan

  12. Part 1 - Strategy

  13. Relationship with other plans : • SEA-PT & Harbour Plans; • Major Emergency Plan etc. Roles & Responsibilities (including Internal command structure): • Local Authority (Shoreline Response); • IRCG etc.

  14. Risk Assessment : • Sensitive Coastline (SAC, SPA, Shellfish, Blue Flag...); • Marine traffic (fishing, leisure, commercial traffic etc.); • Wide variation in coastline types; • Tourism reputation etc.

  15. Response Strategies and Plans : • What are we dealing with (classification : type of Oil/HNS)? • How much (quantification)? • How will it behave in the marine environment (fate and likely destination)? • How might we deal with it (containment and recovery options)?

  16. Tiered Response : Tier 1 : Background and minor operational spills resulting in shoreline pollution which can be dealt with by the relevant local authority or harbour authority.

  17. Tier 2 : Small-scale incidents where local authority may require mutual aid in order to initiate and maintain a shoreline response

  18. Tier 3 : A large spill where substantial further resources may be required and support from national government is necessary through the implementation of the National Contingency Plan (NCP).

  19. Training & Exercise Policy : • What training is to be undertaken (SEA-PT exercises, IRCG courses); • Training records.

  20. Scenarios

  21. Part 2 - Actions

  22. Response procedures : • Plan activation; • Notification formats (who to contact, when and how).

  23. Health & Safety : • Risk assessments; • Safe work procedures, • Safety Data Sheets etc.

  24. Waste Management : • Options for waste minimisation (eg. removal of debris etc.); • Identification of potential temporary storage sites etc. (technical amendment to landfill licence.); • Details of waste contractors etc.

  25. Part 3 – Data Directory

  26. Contact Directory : • Current contact details for all relevant people and organisations etc. Resource Directory : • Inventory of equipment etc.

  27. Part 4 – Cost Recovery

  28. Insurance Options : • P & I Clubs, Standard Insurance Policies etc. Financial Control : • Record keeping (what costs are being incurred and on what basis); • Procurement procedures (eg. materials, plant & equipment etc.).