1 / 13

The committee for international council on large electrical systems ( cigre )

The committee for international council on large electrical systems ( cigre ). S.K. Soonee Chairman CIGRE-India Study Committee C.2. Sc c2 system operation and control. Study Committee C2: System operation & Control. Composition Chairman- Michael Armstrong Secretary- Ben Li

lei
Download Presentation

The committee for international council on large electrical systems ( cigre )

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The committee for international council on large electrical systems (cigre) S.K. Soonee Chairman CIGRE-India Study Committee C.2

  2. Sc c2 system operation and control

  3. Study Committee C2: System operation & Control • Composition • Chairman- Michael Armstrong • Secretary- Ben Li • 24 National members, 12 National Observers • Europe-20, Asia/Oceania -8, Africa 3 • 3 Advisory Groups set up in 2007 for focus areas • C2.1- Real-time System Operation and Control • C2.1- System Operational Planning & Performance Analysis • C2.3- Control centre infrastructure and human resources for System Operation

  4. 8 WORKING GROUPS (WG) in SC-2

  5. C2.11System control in light of recent developments in Substation control (IEC standards) • Scope • Identify the advances in Substation Control which may influence system operation • Analyse their impact on system operation • Survey and catalogue best practices for embedding SCs in system control • Identify the potential improvements in system operations • Propose Recommendations / guidelines for using SCs integration in system control

  6. C2.13Voltage and Var support in System Operation • Scope • Reactive Devices at the disposal of system operator • Techniques for Reactive power and voltage control • EMS Modelling, Control techniques, local and centralized • Finding systematic weak points for Voltage/var control in the power system • Voltage/Var during normal and emergency conditions • Implementation of Reactive Power Management • Reactive Power Management and De-Regulation

  7. C2.33Control Centre Operator Requirements, Selection, Training and Certification • Scope • Overview of CC operators’ requirements regarding knowledge and skills. Operators work performance. • Overview of methods and practices to select power system CC operator candidates. • Critically review the methods and practices for CC operator training program design, development and utilization. • Review of the existing OTS/DTS architectures and functionality, and other training tools as well. • Collection and description of experiences in training program and tools practical use. Results achieved, problems identified. • Training program accreditation and operator certification. • Organization and justification of power system CC operator training

  8. C2.34Capabilities and requirements of a control centre in the 21st century - Functional and Human resources view • Scope • Capabilities and requirements of control centres • Information exchange, interpretation and presentation • Risk awareness and determination • Human resources, Requirements on human abilities • Operator training • Deliverables- Control centres • Capabilities and Requirements, Information exchange • Information interpretation and presentation • Operational Challenges • Deliverables- Risk management • Risk - awareness, determination, management • Deliverables- Human aspects • Resources, Required abilities, Operator training

  9. Proposed WG_C2.12 • Title • “Applications of Synchronized Phasor Measurement in Power Systems • Scope • Survey the use of wide area monitoring devices in power systems • Identify the most used WAM applications in system operation and Analyse the trend for near future • Location of PMUs to strengthen system operation by increasing observability and robustness • Analyse new control possibilities ,such as HVDC, using WAM signals

  10. Proposed WG_C2.15 • Title • Common Information Model and its prospective use in power system operations • Scope • Catalogue Current Use of CIM in Power systems Operation • Analyse the requirements applications and possible improvements • Establish best practices as seen in industry with used cases • Requirements of update on the standard from System operation perspective. • Possible cooperation with CIM user group or other Operational Associations

  11. Other proposed working groups • C2.14 • Requirement on design and implementation of Restoration Tools and Procedures • C2.21 • Lessons learnt from recent Emergencies and Blackout Incidents

  12. Proposed Roadmap for fold • Shadow working groups of CIGRE / VLPGO • Identify Working Groups where FOLD would like to be associated with • Identify resource persons from SLDC/RLDC/NLDC • Consolidate the views of LDCs in India on various issues under discussion at International fora • Constitute FOLD- Steering Committee • Constitute 8 Working Group of FOLD • Work on focus areas identified in the FOLD Charter • Develop -Terms of Reference, Deliverables • Have a time schedule • Identify Convener & members (volunteers)

  13. Thank you !

More Related