1 / 21

IBM Maximo Asset Management Development Roadmap Maximo Scheduler Review

IBM Maximo Asset Management Development Roadmap Maximo Scheduler Review. James Cooper, Technical Professional UK and Ireland Maximo User Group Bedfont Lakes, 17 th Sept 09. Agenda. IBM Maximo Development Strategy 2009 Roadmap 2010 Roadmap Maximo Scheduler Overview Maximo Scheduler Demo.

lenci
Download Presentation

IBM Maximo Asset Management Development Roadmap Maximo Scheduler Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IBM Maximo Asset Management Development RoadmapMaximo Scheduler Review James Cooper, Technical Professional UK and Ireland Maximo User Group Bedfont Lakes, 17th Sept 09

  2. Agenda • IBM Maximo Development Strategy • 2009 Roadmap • 2010 Roadmap • Maximo Scheduler Overview • Maximo Scheduler Demo

  3. Introducing New EMEA Maximo Support Manager • Sina Whiston • Replacing Laurence Vale • sina.whiston@uk.ibm.com

  4. Maximo Asset Management Development Strategy • Manage all asset classes in a single system –Production, Facilities, Transportation and IT • Support SMARTER Planet, converged and smart assets – IT & operational assets, leveraging Monitoring to drive smart assets • Provide Asset Based Service Management – Implements best practice to managing a system of logically and physically connected assets • Continue to Deliver Deep Industry-Specific Solutions– Enhance capability to increase the out of box values • Continue to protect customer investments by supporting existing and new platforms –focusing on ability to upgrade customer implementations, and delivering a modern, stable architecture • Continue architecture leadership – ease of integration, configuration, upgrade

  5. Performance & Availability Complexity Capabilities Maximo DB Archive Optim ArchiveDatabase • Oil & Gas 7.1.1 • Reliability & Availability Analysis • Transportation 7.1.1 • Consist Management (Rail) • Nuclear Power 7.1.1 • Permitting, Config. Change Mgmt • Utilities 7.1.1 • Reliability & Availability Analysis • Spatial Asset Management • Polygon selection, Usability enh. • Asset Configuration Mgmt 7.1.1 • Service Data Management • Primavera 7.1.1 • Import Task Resources Industry Solutions Maximo Archiving with IBM Optim Maximo Scheduler • Improve Apps Performance • Segregate Data & Move to Archive • Reduce database size prior to upgrade • Reduce Infrastructure Costs • Deploy Tiered Storage Strategies • Simplify Infrastructure • Improve Compliance • Retain Data According to Value • Gantt chart control • Drag and Drop WO/tasks • View resource requirements • Manage task dependencies • Perform a CPM schedule

  6. The v7.1 core suite of solutions represent the full integration of IBM and Maximo Solutions The core solutions share a common data subsystem and base functionality The delivery of the ISM 7.1 architecture marks the completion of the MRO integration into IBM Maximo Asset Management Tivoli Asset Management for IT Version 7.1 shared infrastructure and componentry Tivoli Process Automation Platform Tivoli Service Request Manager Change & Configuration Management Database

  7. Maximo Asset Management 2009 Roadmap Maximo for Energy Optimization 7.1 • Maximo Mobile Manager 7.1.1 • Mobile Work Manager • Mobile Inventory Manager • Mobile Asset Manager Life Sciences 7.1.1 • Maximo Scheduler 7.1.0 • Gantt Chart • CPM • Resource graph Maximo fixpack 7.1.1.5 • Maximo fixpack 7.1.1.6 • ITM for Maximo (Monitoring) • Cognos Report Integration Maximo Mobile fixpack 7.1.0.1 • Service Provider 7.1.1 • Customer Domains • Support ISM • Maximo Every Place (PRPQ) June August September October December July March • Oil & Gas 7.1.1 • Reliability & Availability Analysis TAMIT 7.2 • Maximo Archiving with Optim Data Growth Solution • Work Orders • Purchase Orders/Receipts • Purchase Requests • Invoice • Assets • Workflow transactions • For Release 6.2.x TADD & TADZ 7.2 • Transportation 7.1.1 • Consist Management (Rail) • Nuclear Power 7.1.1 • Permitting, Config. Change Mgmt • Utilities 7.1.1 • CUE Performance & Usability • = Available • Spatial Asset Management • Polygon selection, Usability enh. All dates are estimates and specific content is subject to change. • Asset Configuration Mgmt 7.1.1 • Service Data Management

  8. Industry Solutions • Asset Configuration Management • Service Lifecycle Management (SLM) capability to provide greater knowledge of products in service. Supports major asset operators in Aviation, Aerospace, and Rail sectors. • Nuclear • Enhance permits, config management, and corrective actions to improve operational performance, regulatory excellence, and life extension to get Maximo in early build cycle for Next Generation nuclear plants. • Oil and Gas • Expand Asset Integrity Management and Integrated Operations to improve control of work, risk analysis, operators logs, and integration with the IBM Chemicals & Petroleum Integrated Information Framework. • Transportation • Introduce Rail Rolling-Stock support to compete for rail customers managing their mobile assets. • Utilities • Improve usability via performance enhancements including CUE Perform Acceptance and improving UI and CUE focus issues. • Spatial • Improve user experience through Visual Planning and improvements to service addresses, auto creation and location of work orders and service requests, Polygon selection improvements.

  9. IBM Maximo Asset Management - products Maximo Asset Management Tivoli Asset Management for IT Maximo Maximo Essentials Maximo for Energy Optimization Industry Solutions Utilities Life Sciences Nuclear Power Government Oil & Gas Transportation Add-On Solutions Scheduler Service Provider Change & Corrective Action Mgr Spatial Linear Assets Asset Configuration Manager SLA Manager Asset Navigator Calibration Everywhere Place Archiving with Optim Adapter for MS Project Mobile Work Manager SAP ERP Adapter Compliance Assistance Documentation Mobile Asset Manager Oracle ERP Adapter Adapter for Primavera Mobile Inventory Manager = new products in 2H09

  10. Maximo – Cognos Report Integration • Supports Maximo’s Open Reporting System in enabling Clients to use Reporting Tool of Choice

  11. Maximo Cognos Integration (MCI) See Cognos Report Within Maximo Execute Seamlessly to Cognos Portal 5

  12. Draft - Maximo Asset Management 2010 Roadmap • Maximo Mobile Manager 7.1.2 • Mobile Work Manager • Mobile Inventory Manager • Mobile Asset Manager Maximo Scheduler 7.1.1 Linear Asset Visual Control Maximo for Energy Optimization 7.1.1 Maximo Every Place (eGA) • Maximo 7.2 (Kestrel) • EAM release Q1 Q2 Q3 Q4 Oil & Gas 7.1.2 Maximo 7.1 Archiving with Optim Data Growth Solution Life Sciences 7.1.2 Transportation 7.1.2 Maximo Fix-pack 7.1.1.7 Nuclear Power 7.1.2 Utilities 7.1.2 Spatial Asset Management 7.1.2 All dates are estimates and specific content is subject to change. Asset Configuration Mgmt 7.1.2

  13. Draft - Maximo Asset Management 2010 Roadmap • Maximo Mobile Manager 7.1.2 • Mobile Work Manager • Mobile Inventory Manager • Mobile Asset Manager Maximo Scheduler 7.1.1 Linear Asset Visual Control Maximo for Energy Optimization 7.1.1 Maximo Every Place (eGA) Maximo 7.2 (Kestrel) Supply Chain Management • LIFO/FIFO Costing • Issue/Transfer Document • Hard/Soft Reservations • Consolidated Requisition • Enhanced PO functionality • Simplified Reorder Work Management • Work Order processing Maximo 7.2 (Kestrel) • EAM release Q1 Q2 Q3 Q4 Usability, Performance & Platforms Maximo 7.1 Archiving with Optim Data Growth Solution Life Sciences 7.1.2 Maximo Fix-pack 7.1.1.7 All dates are estimates and specific content is subject to change.

  14. Maximo Scheduler Review

  15. Maximo Scheduler – key facts • Requires Maximo 7.1.1.5 • General Availability was 28/8/09 • Scheduler is an add-on; extension requires license • Licensing costs from your account manager

  16. Planning Horizon 6 Quarters Daily Plan 12 Weeks 14 Days 6 Weeks 5 Years Maximo Scheduler 2 detail Maximo Scheduler 1 Scheduling Planning Forecast Analysis time

  17. Maximo Scheduler – 1 Visual Scheduling Work Order • new Gantt chart control • drag and drop wo/tasks • view resource requirements • manage task dependencies • perform a CPM schedule • “what if” scenarios – prior to committ changes • date constraints • task precedence constraints • schedulable tasks

  18. Maximo Scheduler – 2 PM Forecasts Assignment Mgr. • date and meter based • view forecasts in Gantt chart • edit future dates • view along with regular WOs • view resource requirements • date constraints • many to many assignments • part of WO application • bulk reschedule

  19. The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. THE INFORMATION PROVIDED IN THIS DOCUMENT IS DISTRIBUTED “AS IS” WITHOUT ANY WARRANTY, EITHER EXPRESS OR IMPLIED. IBM EXPRESSLY DISCLAIMS ANY WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE OR NON-INFRINGEMENT

More Related