1 / 30

Electricity Supply in Alaska

Electricity Supply in Alaska. Frank Abegg, PE Fairbanks, Alaska April 2006. `. Utilities 1,778 MW Industry 822 MW Defense 181 MW Total 2,781 MW. Alaska’s Electric Generating Capacity. `. Alaska’s Electric Capacity Utility & Non-Utility.

lok
Download Presentation

Electricity Supply in Alaska

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electricity Supply in Alaska Frank Abegg, PE Fairbanks, Alaska April 2006

  2. ` Utilities 1,778 MW Industry 822 MW Defense 181 MW Total 2,781 MW Alaska’s Electric Generating Capacity

  3. ` Alaska’s Electric Capacity Utility & Non-Utility

  4. Installed Electric Utility Capacity (1960 - 1995)

  5. ` Types of Power Generating Facilities in Alaska

  6. Alaska Electric Utilities Map

  7. Utility Power Output - 1995 (GWH/Year)

  8. Electric Utility Transmission Grid Electric Supply Alternatives for Industry in Alaska • On Site Generation • Central Power Plant • Cogeneration Option (Heat and Power)

  9. Electric Transmission Grid in Southcentral & Interior

  10. Electric Transmission Grid in Southeast

  11. Distribution Tap ( 4 MW Load) • 12 kV Line ~ $75,000 to $100,000/mile • Transmission Tap (up to 40 MW) • 69 kV Line~ $250,000 to $300,000/mile • Construction Time: Up to 5 years • Permits: Right-of-Way (EA or EIS) • Low Cost Financing ($/kWh) Electric Utility Grid Connection

  12. Anchorage & Fairbanks $0.11/kWh • Juneau $0.10/kWh • Nome $0.15/kWh • Tok $0.23/kWh • Ft. Yukon $0.28/kWh • McGrath $0.36/kWh Electric Utility Commercial Power Cost

  13. Diesels On-Site Power Options • Combustion Turbines • Steam Turbines • Alternative Energy • Wind, Hydro • Emerging Technology • Fuel Cells, Micro-Turbines

  14. 2,000 kW Diesel Trailer Module

  15. 3,600 kW Diesel Generator

  16. Diesel Power Plant • Size = 5 kW to 10,000 kW • Installation Cost = $200 to $400/kW • Operation & Maintenance • Fuel Options - Natural Gas or Fuel Oil • Fuel Use = up to 16 kWh per gallon • Heat Recovery Option • Permitting = General Permit or… • PSD & BACT Possible (1- 2 years minimum)

  17. Combustion Turbine with Cogeneration (Heat and Power)

  18. Combustion Turbine Plant • Size = 3 MW to 90 MW • Installed Cost: $700 to $1,200/kW • Operation & Maintenance • Fuel: Natural Gas to Heavy Oil • Fuel Use: Up to 13 kWh/gallon • Cogeneration & Comb. Cycle Option • Permitting: Construction & Operating • PSD & BACT Required (2 years)

  19. Steam Turbines

  20. Steam Turbine Plant • Size Range = 3 MW to 200 MW • Installed Cost: $1,500 to $4,000/kW • Operation & Maintenance • Fuel: Solid, Liquid, Gas • Cogeneration: Up to 70% Efficient • Permits: Construction & Operating • PSD and BACT Required (1-2 years)

  21. Alternative Energy - Wind

  22. Alternative Energy - Wind

  23. Alternative Energy - Wind • Site Wind ~ 15 mph (Average) • Installed Cost ~ $2,500/kW • Operation & Maintenance • Avg. Output: 25% of Rated Capacity • Wind/Diesel Hybrid Option

  24. Cooper Lake Dam

  25. Alternative Energy - Hydro • Cost: $3,000 to $5,000/kW • Bradley Lake 120 MW @ $385 million • Old Harbor 500 kW @ $ 2.5 million • Available Watershed • Mountain Lake (High Head) • River (Low Head) • Permits: FERC Licensing

  26. Emerging Technology - Fuel Cells

  27. Emerging Technologies - Fuel Cells • Commercial Size ~ Up to 250 kW • Installed Cost = $5,000/kW • Operation and Maintenance • Fuel: Natural Gas • Cogeneration: Up to 60% Efficient • Expected Operating Life ~ 50,000+ hours

  28. Capstan 30 kW Micro Turbine

  29. Emerging Technologies – Micro Turbines • Commercial Size ~ Up to 30 kW • Installed Cost ~ $3,500/kW • Operation and Maintenance • Fuel: Natural Gas • Efficiency: 25% • Cogeneration: Up to 50% Efficient • Expected Operating Life ~ 12,000+ hours

  30. Plan Ahead: Permits & Construction • Profile: Electricity and Heating Load • Define Criteria: Reliability, Life, etc. • Identify: Power Supply Alternatives • Evaluate: Life Cycle Costs • Initial Investment, Cost of Capital • Fuel Supply, Operation & Maintenance Power Supply Selection Process