Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University. BIM Project Execution Planning. Thursday, January 13, 2011. BIM Project Execution Planning Procedure. Identifying BIM Goals and Uses. “Begin with the end in mind.”. BIM Goals.
E N D
Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University BIM Project Execution Planning Thursday, January 13, 2011
Identifying BIM Goals and Uses “Begin with the end in mind.”
BIM Use Selection Worksheet Responsible Party BIM Use Proceed? Capabilities & Resources Value
Develop Information Exchanges INFO EXCHANGE INFO EXCHANGE
Information Exchange Worksheet = Output Inadequacy (Revise Information) OR = Input Inadequacy (Revise Responsible Party)
Validating the Planning Procedure • Surveys • Case Studies • Project (7) • Organizational (3) • Academic (2) • Focus Groups • Industry and User Feedback
Case Study Implementation Organizational Projects • US Army Corps of Engineers • Penn State University • Los Angeles Community College District (Draft) • University Health Systems - San Antonio • Millennium Science Building • Poff Courthouse • 2nd Data Center Project • Moore Building Renovation • Henderson Bridge Academic Integrated BIM Design Studio Integrated BIM Thesis BIM Project Execution Planning
Lessons Learned • Need BIM Champion(s) • Owner Involvement is Critical • Need team Buy-in and Transparency • The Planning Procedure should allow for Adaptations by the Project Team • The Project Execution Plan must be considered a Living Document • Planning takes Resources and it is Critical that Resources are Available
Acknowledgements Sponsors: • The Charles Pankow Foundation • The Construction Industry Institute (CII) • Penn State Office of Physical Plant • The Partnership for Achieving Construction Excellence (PACE) • Industry Partners: • LACCD • USACE • Balfour Beatty • Whiting Turner • Clark Construction Group • Jacobs • Barton Malow • GSA • MA DCAM Advisory Board Members • Dana ‘Deke’ Smith • Mark Butler • Derek Cunz • Mark Falzarano • Ed Gannon • Greg Gidez • Francois Grobler • Steve Hagan • Steve Hutsell • Mark Konchar • SoadKousheshi • Rob Leicht • Kurt Maldovan • Victor Sanvido • Alexander Zolotov PSU Research Team • Students: • Craig Dubler • Shane Goodman • Colleen Kasprzak • Ralph Kreider • Eric Nulton • ChitwanSaluja • NevenaZikic • Faculty: • ChimayAnumba • Sam Hunter • John Messner
? BIM Project Execution Planning Download the Guide at: www.engr.psu.edu/bim Ralph Kreider Graduate Research Assistant CIC Research Program Penn State University