1 / 13

Commissioner Anne C. George Connecticut Department of Public Utility Control Raab Associates/ Foley Hoag, Boston – Octob

Electricity Restructuring Roundtable Retail Rate Options for Large Customers in CT. Commissioner Anne C. George Connecticut Department of Public Utility Control Raab Associates/ Foley Hoag, Boston – October 28, 2005. Fuel Prices $$. Enviro Concerns $$. LMP $$ FERC.

meda
Download Presentation

Commissioner Anne C. George Connecticut Department of Public Utility Control Raab Associates/ Foley Hoag, Boston – Octob

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electricity Restructuring RoundtableRetail Rate Options for Large Customers in CT Commissioner Anne C. George Connecticut Department of Public Utility Control Raab Associates/ Foley Hoag, Boston – October 28, 2005

  2. Fuel Prices $$ Enviro Concerns $$ LMP $$ FERC CT Electric Consumers $$ Two Price Zones FERC Locational Marginal Pricing $$ RMR Regional $$ LICAP FERC Locational Installed Capacity Reliability-Must-Run generators

  3. Connecticut Department of Public Utility Control Post Hurricanes Katrina, Rita, WilmaEnergy $$$ Impact • Pre-hurricane, global energy prices had already escalated to historic highs • Preliminary estimates vary as to cost & extent of damage & recovery time for Gulf area energy facilities • Consumers nationwide, this winter, are expected to spend*: • 32 % more for heating oil ($/gal) • 48 % more for natural gas ($/md) • 6 % more for electricity ($/kWh) • Energy costs will vary based upon actual conditions: weather, global economic activity, & gulf recovery efforts $$$ *Source: EIA- STEO (10/12/05) - based on U.S. Average for typical per-household consumption

  4. Connecticut Department of Public Utility Control Steps to Addressing CT Electric System Needs CT has to: 1) Ensure adequate resources are in place to provide system reliability 2) Mitigate adverse $$$ monetary impacts from various price pressures (LMP & LICAP, CT 2 Zones) Action plan outlined in Public Act 05-1: An Act Concerning Energy Independence (Public Act 05-1/June Special Session)

  5. Connecticut Department of Public Utility Control CT Strategies to MeetElectric System Challenges On-going Strategies Energy Efficiency Conservation Demand/Load Response Distributed Generation Transmission Generation

  6. Connecticut Department of Public Utility Control CT Policy Approach to Improve Electric System AAC Energy Independence Basic concept – unique hybrid approach… state is catalyst for market to respond directly to identified needs Four basic strategies promoted: 1) Customer-side; Grid-side distributed generation- CHP 2) Incentives for other new generation (capacity contracts) 3) Demand side resources – demand response & EE 4) Rate changes

  7. Connecticut Department of Public Utility Control Rate Initiatives for Large Customers TOU Rates • DPUC decision on process for exemption (until 1/1/ 2010) from mandatory TOU rates (Jan. 1, 2006) • Optional TOU - for all customers (June 1, 2006) • Mandatory peak, shoulder & off-peak TOU rates - 350 kW or greater max. demand (Jan. 1, 2007) Seasonal Rates • Optional seasonal rates - for all customers (June 1, 2006) Interruptible & Load Response Rates • 350 kW or greater max. demand (June 1, 2006)

  8. Connecticut Department of Public Utility Control Rate Initiatives for Large Customers April 1, 2006 to March 31, 2007 EDCs issue comparative analyses to all customers on mandatory seasonal rates EDCs assist customers in managing loads & reducing peak consumption Exemption from Back-up Power Charge For new customer-side distributed resources if its capacity is less than peak load and the resources are available to the system during peak periods

  9. Connecticut Department of Public Utility Control DPUC Core Implementation Dockets • Measures to Reduce FMCCs(Short Term Measures) effective by 1/1/06 • Measures to Reduce FMCCs(Long Term Measures) RFP conducted on 2/1/06 • Development of Various Incentives for Customer SideDistributed Generation (gas rebate; back-up rates) • Development of a Program forMonetary Grants for Capital Costs of Customer Side Distributed Generation (capital grants) • Development of Long Term Financing for Customer Side Distributed Generation • Development of New Class III Renewable Program (CHP/C&I EE) • Development of a Process & Standards for RFP for Long-Term Measures to Reduce FMCCs • Financial Impact of Long-Term Contracts on Electric Distribution Companies

  10. Connecticut Department of Public Utility Control CT DPUC Decoupling Docket Docket 05-05-09 PA 05-1, Section 21: DPUC Decoupling Investigation • The law requires the DPUC to investigate how best to decouple earnings of gas and electric utilities from their sales in order to promote the state's energy policy • DPUC must report its findings and recommendations to the Legislatures Energy & Technology Committee by January 1, 2006

  11. Connecticut Department of Public Utility Control Areas To Be Considered • Ratcheted demand charges • Decoupling – fixed distribution revenue recovery • Exemption from back-up and stand-by rates • kVa rates • Residential demand based rates (high demand customers)

  12. Connecticut Department of Public Utility Control REPORT CEAB’s Role in DPUC Implementation Process First Report (Sept. 2005) – DPUC will use CEAB Needs Assessment to make determination on near-term FMCC reduction measures (1/1/06) Recommendations on Actions: Mitigate CT’s peak demand Preserve CT’s local generation & encourage new generation resources Improve CT’s transmission Second Report (Nov./Dec. 2005) – DPUC will use CEAB Needs Assessment to make determination on longer-term FMCC reduction measures (Feb. 2006 RFP). AAC Energy Independence – carved out projects awarded under DPUC Feb. 2006 RFP from CEAB RFP process

  13. Connecticut Department of Public Utility Control Benefits of Implementation of CT Strategies • New & upgraded facilities will result in improvements to system reliability & efficiency • Load management and reduction will: • reduce customer & system costs • operate to cut $$$ for LMP, LICAP

More Related