1 / 47

Texas Coastal Ocean Observation Network in Review

Texas Coastal Ocean Observation Network in Review. March 17, 2005 James Rizzo. 1. South Padre Island 2. Arroyo Colorado 3. Port Mansfield 4. Rincon Del San Jose 5. Baffin Bay 6. Bird Island 7. Packery Channel 8. Texas State Aquarium 9. Ingleside 10. Port Aransas

metea
Download Presentation

Texas Coastal Ocean Observation Network in Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Texas Coastal Ocean Observation Network inReview March 17, 2005 James Rizzo

  2. 1. South Padre Island 2. Arroyo Colorado 3. Port Mansfield 4. Rincon Del San Jose 5. Baffin Bay 6. Bird Island 7. Packery Channel 8. Texas State Aquarium 9. Ingleside 10. Port Aransas 11. Copano Bay Causeway 12. Seadrift 13. Port O’Connor 14. Port Lavaca 15. East Matagorda 16. Galveston North Jetty 17. Eagle Point 18. Morgan’s Point 19. Manchester, Houston 20. Clear Lake 21. Battleship Texas 22. Round Point 23. Rollover Pass 24. Rainbow Bridge 25. Port Arthur 26. Mesquite Point 27. Texas Point Active Stations

  3. NOAA NWLON Stations Port Isabel Bob Hall Pier Rockport Freeport Galveston Pleasure Pier (PORTS) Galveston Pier 21 (PORTS) Sabine Pass (PARTS)

  4. TCOON

  5. Rincon Del San Jose877 7812 Station priority: • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 3

  6. Packery Channel877 5792 Station priority: • TGLO 2 • TWDB 1 • COE 1 • GLO-OS 3 • New structure FY 06

  7. Ingleside877 5283 Station priority • TGLO 2 • COE 1 • TWDB 3 • GLO-O 3 • CCRTNS 1 • DCP problems

  8. Texas State Aquarium877 5296 Station priority • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 1 • CCRTNS 1

  9. Port Aransas877 5237 Station priority • TGLO 1 • COE 1 • TWDB 2 • GLO-OS 2 • CCRTNS 1 • New structure FY 06

  10. White Point877 5188 Station priority • City of CC 1 • GLO 3 • COE 3 • TWDB 2 • GLO-OS 3

  11. Bird Island Basin877 6139 Station Priority • TGLO 1 • COE 1 • TWDB 3 • GLO-OS 1

  12. Bob Hall Pier – NOAA877 5870 Control station (NOAA/NWLON) • NOAA 1 • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 1

  13. Rockport – NOAA877 4770 Control station (NOAA/NWLON) • NOAA 1 • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 1 • New met pack FY 05

  14. Sabine Pass – NOAA877 0570 Control station (NOAA/NWLON) • NOAA 1 • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 1 • New met pack • Added to PARTS

  15. Port Mansfield877 8490 Station priority TGLO 1 • COE 1 • TWDB 1 • GLO-OS 2 • New structure April 05

  16. Port Isabel – NOAA877 9770 Control station (NOAA/NWLON) • NOAA 1 • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 1

  17. Galveston Pleasure Pier - NOAA877 1501 Control station (NOAA/NWLON) • NOAA 1 • PORTS 1 • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 1

  18. Galveston Pier 21 – NOAA877 1450 Control station (NOAA/NWLON) • NOAA 1 • PORTS 1 • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 1

  19. Seadrift877 3037 Station priority • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 2 • DCP problems • New structure March 05

  20. Port Lavaca877 3259 Station Priority • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 2

  21. Copano Bay Causeway877 4513 Station priority • TGLO 1 • COE 2 • TWDB 1 • GLO-OS 3 • DCP problems

  22. Arroyo Colorado877 9038 Station priority • TGLO 1 • COE 1 • TWDB 2 • GLO-OS 3 • Needs new platform

  23. South Padre Island877 9748 Station priority • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 3 • New structure April/May 05 (courtesy of USCG)

  24. Freeport – NOAA877 2440 Control station (NOAA/NWLON) • NOAA 1 • TGLO 1 • COE 1 • TWDB 1 • GLO-OS 1 • To be relocated to the U. S. Coast Guard Station Surfside.

  25. Port O’Connor877 3701 Station priority • TGLO 1 • COE 1 • TWDB 2 • GLO-OS 1 • DCP problems • New structure March 05

  26. East Matagorda Old Gulf Cut877 3118 Station priority • TGLO 1 • COE 3 • TWDB 1 • GLO-OS 3

  27. Baffin Bay877 6604 Station priority • TGLO 2 • COE 1 • TWDB 2 • GLO-OS 3 • New structure April 05

  28. Clear Lake877 0933 Station priority • TGLO 1 • COE 2 • TWDB 3 • GLO-OS 3

  29. Morgans Point –TCOON/PORTS877 0613 Station priority • NOAA/PORTS 1 • TGLO 2 • COE 1 • TWDB 1 • GLO-OS 1

  30. Rainbow Bridge877 0520 Station priority • TGLO 2 • COE 1 • TWDB 1 • GLO-OS 1 • Added to PARTS • Station relocated To new dock

  31. Round Point877 0559 Station priority • TGLO 2 • COE 1 • TWDB 2 • GLO-OS 2 • NOAA 2

  32. Mesquite Point877 0539 Station priority • TGLO 2 • COE 1 • TWDB 2 • GLO-OS 3 • Added to PARTS

  33. Eagle Point – TCOON/PORTS Station priority • NOAA/PORTS 1 • TGLO 2 • COE 1 • TWDB 2 • GLO-OS 3

  34. Manchester Houston877 0777 Station priority • TGLO 3 • COE 1 • TWDB 3 • GLO-OS 3 • PORTS? 1

  35. Rollover Pass877 0971 Station priority • TGLO 1 • COE 1 • TWDB 2 • GLO-OS 3 • DCP problems • New structure April 05

  36. Galveston Entrance ChannelSouth Jetty 877 1416 Station priority • TGLO 3 • COE 1 • TWDB 3 • GLO-OS 3 • To be reinstalled when DCP is available

  37. Port Arthur877 0475 Station priority • TGLO 2 • COE 1 • TWDB 3 • GLO-OS 3 • Added to PARTS • Rebuild Structure FY 06

  38. Galveston Entrance ChannelNorth Jetty 877 1341 Station priority • NOAA/PORTS 1 • TGLO 3 • COE 1 • TWDB 3 • GLO-OS 3

  39. Battleship Texas State Park877 0743 Station priority • TGLO 2 • COE 1 • TWDB 2 • TGLO-OS2 • PORTS? 1 • DCP problems

  40. DCP problems • Ingleside, Copano Bay, Seadrift, Port O’Connor, Rollover Pass (Lack of replacement DCP parts) Aquarium - Silting White Point - Silting Manchester - Silting

  41. New Stations Colorado River Galveston South Jetty Beaumont Port of Orange Sabine Offshore

  42. CMP 2003 • Construction proposal Submitted October 2003 (G Jeffress) • DNR received funding in December 2004 • Replacement platforms: • Seadrift – March 05 • Port O’Connor – March 05 • Rollover Pass – April 05 • Port Mansfield – May 05 • Baffin Bay – May 05 • Development of rapid deployment water level monitoring platform

  43. CMP 2004 • Construction proposal Submitted October 2004 (J Rizzo) • Selected for funding • Replacement plarforms • Packery Channel • Texas Point • Port Aransas • Port Arthur • Data collection site in Rio Grande Valley

  44. CMP 2005 • To be submitted in October 2005 (J Rizzo) • Data and Information Proposal To upgrade TCOON with the latest technology available as approved by NOAA/NOS/CO-OPS. Proposed the collection of data in near real-time to be provided to Emergency Management, Coastal Resource Management, local, state, and Federal agencies. The replacement DCP’s have been approved by NOAA/NOS/CO-OPS. To purchase 15 new DCP and assorted replacement parts/pieces for TCOON. Total CMP 2005 budget should be around $150K.

  45. Collaboration with NOAA NOAA to replace 50 DCP’s with new Sutron X-PERT systems in FY 2005, 35 DCP’s in the Great Lakes and 15 NWLON DCP’s. January 05 J Rizzo proposed that DNR would replace all 7 NOAA/NWLON DCP’s at no cost to NOAA and no Contract modification would be required. In return, NOAA would relinquish the 7 Sutron 9000 removed to be added to the TCOON inventory.

  46. Relocation of Houston/Galveston Data Acquisition System • DNR will be relocating the data collection system at the COE in Galveston to the NWS/Emergency Management Center in Dickinson, Texas. • Antenna is installed and DNR is awaiting the go ahead to install the radio and DAS. • NWS will be providing network access to the DAS

  47. TCOON Real-Time Network • DNR is in the process of making “All” TCOON data available via the internet in near Real-Time. Data collection sites in Port Arthur, Galveston, Port O’Connor, and Los Fresnos will relay the data collected at their respective locations back to the database at TAMUCC as soon as the data are collected. • DNR will process and post the data on the DNR - TCOON web pages as soon as it’s processed. • This will make the TCOON the first state coastal real-time data collection network in the country. • Data will be available and invaluable to private, local, state, and federal agencies as well as promote public safety.

More Related