Corporate Presentation. MINES AND MONEY – LONDON UK December 2, 2008. TOP FOUR PRIORITY PROJECTS. Liberty Corporate Overview Structure, Past and Present. Forward Looking Statements:.

ovidio
Download Presentation

Corporate Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Corporate Presentation MINES AND MONEY – LONDON UK December 2, 2008 TOP FOUR PRIORITY PROJECTS

  2. Liberty Corporate OverviewStructure, Past and Present Forward Looking Statements: This presentation contains certain "forward-looking statements" within the meaning of Section 21E of the United States Securities Exchange Act of 1934 and the United States Private Securities Litigation Reform Act of 1995, as amended and "forward-looking information" as defined under applicable Canadian Securities Laws. Except for statements of historical fact relating to the company, certain information contained herein constitutes forward-looking statements which are frequently characterized by words such as "plan," "expect," "project," "intend," "believe," "anticipate", "estimate" and other similar words, or statements that certain events or conditions "may" or "will" occur. Forward-looking statements are based on the opinions and assumptions of management at the date the statements are made, and are subject to a variety of risks and uncertainties and other factors relating to the corporation’s activities and operations as a mineral exploration company that could cause actual events or results to differ materially from those projected, expressed or implied in the forward-looking statements and could effect the extent to which a particular projection is realized. Without limitation, these factors include statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company which all have degrees of risk. These factors also include possible variations in extent of mineralization, ore grade or recovery rates, fluctuating metal prices, changes in currency exchange rates, changes in project parameters, the possibility of project cost overruns or unanticipated costs and expenses, political risk, failure of plant, equipment or processes to operate as anticipated, unexpected changes in mine life, availability of a local market for the sale of minerals recovered, litigation and general risks of the exploration and mining industry, including the uncertainty of future profitability and the uncertainty of access to additional capital. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be anticipated, estimated or intended. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking statements if circumstances or management's assumptions, estimates or opinions should change. The reader is cautioned not to place undue reliance on forward-looking statements. In addition to other disclaimers contained in this presentation and web site, Liberty International hereby expressly disclaims any liability for errors or omissions contained in the presentation and website. The presentation does not constitute an offer to sell securities of Liberty International in any jurisdiction which can only be done by way of a Subscription Agreement to certain qualified investors in accordance with applicable Securities laws.

  3. Liberty Corporate OverviewStructure, Past and Present Liberty Corporate OverviewStructure, Past and Present INTRODUCTION Liberty International Mineral Corp (Liberty) is a Canadian natural resource exploration company based in Kelowna, British Columbia. It is in the business of exploring for gold in Liberia West Africa as well as poly-metallic deposits of gold, silver, copper, zinc, lead and molybdenum in British Columbia, Canada The following presentation is a summary of the four primary projects currently being undertaken by Liberty on the properties held under Mineral Exploration Agreements in Liberia and Mineral Tenure Licenses or Mining Option Agreements in Canada Qualified Person - Canada Lawrence M. Buss, P.Geo., is the Qualified Person responsible for supervising the preparation of the Canadian portion of this Liberty International Mineral Corp. Power point presentation and technical disclosure including the construction of the plans and site visits. Mr Buss, the Company's independent contract Regional Exploration Manager, Canadian Properties, is the Qualified Person responsible for the review of project exploration requirements. Mr Buss has reviewed and approved this news release and presentation. Qualified Person – Liberia Mr. Greg Nowak, CPG, is the Qualified Person responsible for reviewing the update and approving the content of the Liberia West Africa portion of this Liberty International Mineral Corp Power Point presentation and technical disclosure including site visits to several of the properties. Mr. Nowak, the Company’s Regional Exploration Manager for West Africa properties and projects, is the Qualified Person responsible for the review of project exploration requirements. Mr. Nowak has reviewed and approved this news release and presentation.

  4. Liberty Corporate OverviewStructure, Past and Present LIBERTY INTERNATIONAL HEAD OFFICE Kelowna BC Canada

  5. Canada and Liberia Huge Highly Potential Land Holdings Liberty Corporate OverviewStructure, Past and Present

  6. BIG PROPERTIES BIG PROJECTS BIG POTENTIAL Liberty Corporate OverviewStructure, Past and Present • LARGEST HOLDER OF TERRITORY UNDER MINERAL • EXPLORATION AGREEMENTS IN LIBERIA • LARGEST HOLDER OF TERRITORY UNDER MINERAL • TENURE LICENSES IN BRITISH COLUMBIA CANADA Liberty has raised ~ $17,000,000 without Brokers, Banks or Boutique Firms No Long Term Debt - Granted no exclusive rights or future commitments

  7. MANAGEMENT TEAM Director President CEO Len Lindstrom Kelowna BC Director Edwin Esslinger Edmonton AB Director Lawrence Guard Sundre AB Vice President Michael Lindstrom Kelowna BC Regional Exploration Mgr (Canada) Lawrence M. Buss Grand Forks BC Regional Exploration Mgr (Liberia) Greg Nowak Ohio U.S.A. Chief Engineer/Metallurgist Curt (Chris) Siddeco Vancouver BC Chief Resources Officer Bernard McMahon Trail BC Head Geologist (Liberia) Rockson Coffie Kumasi Ghana Sr Project Geologist (Liberia) Lawrence Mensah Accra Ghana Consulting Geologist (Liberia) Prof. Jenkins Dorbor Monrovia Liberia CTO and GM (Liberia) Tony Leblanc Kelowna BC Contract Chartered Acct Dan Beaton Victoria BC Investor Relations (Canada) Trent Dahl Vancouver BC Director (Liberia Subsidiaries) Harvey Loland Vancouver BC Public Relations Officer Melvin Wiebe Edmonton AB Resident Agent (Liberia) James Arku Monrovia Liberia Liberty Corporate OverviewStructure, Past and Present

  8. Land of Liberty Time of Opportunity Liberia W Africa Corporate DevelopmentStructure, Past and Present LIBERIA

  9. Liberia W AfricaCorporate DevelopmentStructure, Past and Present Liberty Geological Office in Monrovia Data Management & Mapping for 18 Projects Liberty Regional Exploration Manager Greg Nowak CPG (C) with Lawrence Mensah PGeo Geological Data Manager (L) and some of our Ghanaian field geologists reviewing lab results and planning programs in the Liberty Geological Offices Monrovia Liberia Geologist Correlating Field Data

  10. BELEFUANI TOTO RANGE Project Liberia Exploration ProgramsG-10 Exploration Inc High potential for a very significant Gold Deposit #1 PRIORITY W. AFRICA PROJECT

  11. Belefuani Toto Range & North Wata Projects Liberia Exploration ProgramsG-10 Exploration Inc Good access into main mineralized area ~15 km from county capital of Gbarnga Only 3 ½ hours drive from Monrovia by decent roads North Wata Project Gold Hill Toto Range Project

  12. Belefuani Toto Range ProjectAlluvial Gold Liberia Exploration ProgramsG-10 Exploration Inc Extensive alluvial gold mining sites stretch for several kilometers down the streams and across depositional flats on the SE flanks of Gold Hill indicating a very significant hard rock source in the vicinity Local laborer reveals his day’s return of alluvial gold from the Gold Hill diggings on Toto Range

  13. Belefuani Toto Range ProjectLocal Hard Rock Mining Site near top of Range with some Visible Gold in RockOne of three hard rock mining sites caved in due to end of rainy season Liberia Exploration ProgramsG-10 Exploration Inc

  14. Belefuani Toto Range Project Liberia Exploration ProgramsG-10 Exploration Inc Assay Results from Eco Tech Lab Kamloops BC Assay Certificate # 2007-1843 30 samples from Belefuani primarily Claim #7 region Samples of minor quartz veins from hanging wall and footwall returned results averaging 0.44 g/t Au Samples of Mafic Schist material separated from quartz veins in footwall returned results as follows: 1.61 g/t Au from Mafic Schist 4.50 g/t Au from Mafic Schist 13.84 g/t Au from Mafic Schist 33.14 g/t Au from Mafic Schist Due to rainy season and cave-ins the only sample of hard rock reportedly from deeper in the mining area was a mixture of hard rock quartz and schist material with minor visible gold obtained from a local miner (not insitu) which returned a value of: 730 g/t Au … 21.3 oz/t Au

  15. Belefuani Toto Range ProjectSoil Anomaly Consistent for 3.6 km x average of ~350 meters Liberia Exploration ProgramsG-10 Exploration Inc

  16. Befuani Toto Range ProjectGradient Array Pseudo Section(Waiting to receive final 3-D Imaging of Geophysical Pole-Dipole Model on Toto Range)Two parallel chargeability high zones over 150m in width Liberia Exploration ProgramsG-10 Exploration Inc

  17. Liberia Exploration ProgramsG-10 Exploration Inc Belefuani Toto Range Project Main Mineralized Zone and Projected Parallel Zones Main Strike Zone runs through geophysical resistive area in carbonate altered shear zone which appears to control Mineralization as indicated by 14 trench intercepts IP Gradient Array and PDP Surveys indicate high chargeability parallel structures along gold trend Primary local hard rock mining area (Gold Hill) where locals recover occasional hard rock with visible gold in it Potential 2nd strike zone over chargeability high with trenches BETR009 & BETR0013 intersecting similar sheared carbonate altered zone with extensive quartz veining Possible 3rd strike zone over parallel high chargeability zone and geochemical soil anomaly not yet trenched 4 km x 2 km Grid Waiting for 3-D image

  18. pending to further define main mineralized zone for drilling Liberia Exploration ProgramsG-10 Exploration Inc Belefuani Toto Range ProjectTrench Maps over Geochemical Anomaly (l) and Geophysical (r) TRENCH RESULTS BETR001 15.7m @ 2.57 g/t inc 5m @ 6.88 g/t inc 1.8 m @ 18.16 g/t Au BETR002 45m @1.36 g/t Au inc 22m @1.98 g/t inc 14m @ 3.04 g/t and 2m @13.67 g/t Au BETR004 35m @ 0.52 g/t inc 12m @ 0.81 g/t Au BETR006 53m @ 0.51 g/tAu inc 4.1m @1.04 g/t Au and 11m @ 1.08 g/t Au BETR007 10.3 m @ 0.71 g/t inc 8m @ 0.88 g/t inc 3m @ 1.87 g/t Au BETR003 missed main mineralized zone BETR005 could not continue due to duricrust over zone Primary hard rock mining area Red trenches as planned Sept 2008 New trenches BETR08-013 completed Nov 2008 Trenches BETR008 - BETR017 completed - waiting results soon from lab

  19. Belefuani Toto Range ProjectRoad and Bridge Building into Gold Hill Toto Range Liberia Exploration ProgramsG-10 Exploration Inc A $380,000 road has been completed by a local road building contractor, SSF Entrepreneur Inc, turning 7 km of rutted trails and 6 km of jungle hillside into a fresh road with well built bridges and water crossings to create year round access for Drill Rigs and heavy equipment into the Belefuani Toto Range Project - COMPLETED Bamboo Foot Bridge was the only way to cross the big river to Gold Hill Concrete culverts over all minor water crossings Now a solid bridge with good road for next 6 km into the Gold Hill Diggings New Iron Wood Bridge with concrete abuttments over the river at village will now provide easy access for drill rigs and heavy equipment

  20. Belefuani Toto Range ProjectHigh Potential and Top Priority to Drill $380,000 Road and Bridge Project completed into mineralized zone 8,000 meters RC Drilling Planned Basically Ready to Drill Liberia Exploration ProgramsG-10 Exploration Inc Portion of Liberty’s completed Wainsue – Gbarmue Road, Belefuani Gold Project, Liberia IP Survey Pole-Dipole 3-D Model indicates another consistent High Chargeability Zone - Belefuani North Wata Project (10 km N)

  21. Liberia Exploration ProgramsG-10 Exploration Inc Belefuani Toto Range Project Projected Budget to Drill Initial 8,000 Meters on Toto Range Accommodation, Transport, Communication $60,000 Geologists and Local Crews $100,000 Additional Geochemical, Trenching, Surveying $45,000 Drill Contractor (Mob/Demob, Fuel, Meters) $1,000,000 Analytical / Lab $90,000 Community Relations / Compensation $20,000 Licenses, Land Rental Fees $30,000 NI 43-101 Report $20,000 Contingency $136,500 Total Budget $1,501,500 Projected Time Line to Complete Time Line after Drills on site (64 holes @ 125 meters) 45-60 days Sample Results from Lab 30 days Resource Calculation & Release 30 days NI 43-101 Technical Report 30 days Total Time (less if drills double shift) approximately 5 Months

  22. PUTU CVI Project Liberia Exploration ProgramsGolden Ventures Inc High Potential for a Very Significant Gold Deposit #2 Priority W. Africa Project

  23. Putu CVI ProjectFive Mining Villages on Strike in CVI Prospect Liberia Exploration ProgramsGolden Ventures Inc Beleyala Beer Bottle CVI Headquarters New Creek Kumasi 2 Solo Camp

  24. Liberia Exploration ProgramsGolden Ventures Inc Putu CVI ProjectMining Village #1 – CVI Headquarters Mine Sites The main CVI Strike Zone where Liberty geologists have concentrated work starts at CVI Headquarters and extends NE for approximately 6km Continuous Mining Sites also extend to the west upstream from Headquarters Village for over 1.5 km and indicate a strong potential for at least another 1.5 km of mineralized strike zone in the CVI

  25. Putu CVI ProjectMining Village #2 - Beleyala Mine Sites Liberia Exploration ProgramsGolden Ventures Inc Beleyala aka Beer Bottle due to local claims of a miner recovering enough gold to fill a beer bottle from a single pit Geochemical and geophysical work completed to date by Liberty geologists indicate the area may sit over a major sheared and cross faulted geological structure

  26. Liberia Exploration ProgramsGolden Ventures Inc Putu CVI ProjectMining Village #4 – New Creek Mine Site Extensive workings at New Creek Mine Site ~600 m x 300 m dug all by hand one shovelful at a time Like most of the local gold working areas licensed to Liberty no heavy equipment has ever been here

  27. Liberia Exploration ProgramsGolden Ventures Inc Putu CVI ProjectMining Village #5 – Solo Camp Mine Site Three happy trekkers at end of the famous CVI Gold region in June 2006 - a 60 km jungle trek in and out at the time. Solo Camp Mine Site is the last of five major mining areas in the CVI where locals recover depositional gold from weathered laterite and saprolite. Liberty geologists are applying systematic scientific geological processes to discover the source in this gold rich area

  28. Liberia Exploration ProgramsGolden Ventures Inc Putu CVI ProjectCVI Geochem Soil Anomaly Contour Map

  29. Putu CVI Project Geophysics Map - IP High ConductivityGenerated from the first Geophysical Survey on CVI prospect Liberia Exploration ProgramsGolden Ventures Inc Geophysics IP Survey conducted by SAGAX AFRIQUE S.A. Using IP Induced Polarization Gradient Array

  30. Putu CVI Project Chargeability Zones, Anomalous Structures & 17 Drill Targets indicate potential gold distribution sources of the five large Alluvial Mine Sites Liberia Exploration ProgramsGolden Ventures Inc KUMASI 2Mine Site NEW CREEKMine Site BELEYALAMine Site CVI HEADQUARTERSMine Site SOLO CAMPMine Site

  31. Putu CVI ProjectResistivity and Chargeability 3-D Image of CVI Anomaly~5.5 Km Long Liberia Exploration ProgramsGolden Ventures Inc

  32. Liberia Exploration ProgramsGolden Ventures Inc Putu CVI Project Bridge and Road Construction 23km of Road and 16 Bridges into the CVI to gain access for heavy equipment and drill rigs for drill program on the CVI prospect. Contract price of $214,000 – the CVI property is now accessible but proper road construction still needs to be completed after rain season (Dec)

  33. TOP PRIORITY – DRILL THE CVI THE CVI PROJECT MUST BE DRILLED to establish a Resource Calculation on this highly prospective Liberty license. Liberty management intends to make the CVI Project a top priority at the end of rainy season (December 2008) with the intention of rapidly undertaking an extensive drill program over the CVI Prospect. Based on geochemical and geophysical results received to date on the property Liberty geologists believe this should prove a very significant potential Gold Deposit in the Putu CVI Region. Liberia Exploration ProgramsGolden Ventures Inc The preferred type of multi-purpose drill rig (combination RC and diamond core) that Liberty intends to contract for drilling the CVI Project

  34. Liberia Exploration Programs Golden Ventures Inc Putu CVI Project Projected Budget to Drill Initial 8,000 Meters on Toto Range Accommodation, Transport, Communication $100,000 Road Completion $100,000 Geologists and Local Crews $110,000 Additional Geophysics (Sagax) $30,000 Additional Geochemical, Trenching, Surveying $20,000 Drill Contractor (Mob/Demob, Fuel, Meters) $1,250,000 Analytical / Lab $150,000 Community Relations / Compensation $25,000 Licenses, Land Rental Fees $40,000 NI 43-101 Report $20,000 Contingency 10% 185,000 TOTAL BUDGET $2.030,000 Projected Time Line to Complete Time Line after Drills on site (~80 holes @ 125 meters) 80 days Sample Results from Lab 30 days Resource Calculation & Release 30 days Potential NI 43-101 Report 30 days TOTAL TIME (less if two drills double shift) approximately 6 Months

  35. Summary of Liberia Gold Projectsextracted from Liberty Corporate Profile prepared by“IBK Capital Corporation”Toronto Ontario Liberia is surrounded by a horseshoe of countries with some of the richest gold bearing mines in the world Liberia has two of the richest gold bearing rock types in the world (Birimian and Archaean) Liberia holds great mineralogical potential which has never been systematically explored Liberty is the largest holder of mineral exploration territory in Liberia with 18 gold exploration projects underway and high potential for the discovery of significant and/or world class gold deposits. Liberia Exploration ProgramsLiberty International Mineral Corporation - Liberia Liberia Gold Potential In Conclusion:

  36. Liberia Exploration ProgramsLiberty International Mineral Corporation - Liberia Additional Liberia Projects Snapshot of Targets for Future More Advanced Exploration or JVs Other highly prospective Liberty projects include: The KPO Mountain Project: (1,000 km2) Six significant gold anomalies (projects) have been identified to date with grab samples assaying up to 2.575 oz/t gold and one quartz veinlet sample showing visible gold assayed at 475.3 oz/t gold The Grand Kru Project: ( km2) A transported quartz sample from creek entering the main mining site and two ‘Refuse’ grab sample assays of quartz from a hard rock target pit being mined by local artisanals include 8.7 oz/ton, 3.8 oz/ton and 8.1 oz/ton gold TheKuobahn Mountain Project: ( km2) In view of the historic and current artisanal mining activities, the local geology and assay results over a 20 km long strike provide strong indication that economical gold mineralization may exist within the project area The Bomi Alasala Mandingo Hill Project: ( km2) A short exploratory drill program (under 1,000 meters), without additional guidance of geophysics, resulted in hitting mineralization in all 11 short holes (up to 0.7m @ 58.3 g/t Au) but possibly missed the main target. Liberty intends to resume drilling after more advanced exploration is completed. Gibi Mountain and Nimba NE Projects: ( km2) * See Liberty main ‘Power Point’ for more details on these and other highly prospective projects

  37. Canada Exploration ProgramsKootenays BC CANADA Low Risk Environment High Potential Projects

  38. Nelson BC Chamber of Mines(Extract from Government Website) Canada Exploration ProgramsKootenays BC “Mining built The Kootenay-Boundary Region of BC. Over 40 Billion dollars of metal has come from the region and not only built towns but also great companies such as Cominco and Placer. The Region has a mild temperate climate, great infrastructure (including Teck Cominco’s world-leading zinc-lead smelter), and great geology. The Region is well-developed with a strong highway and forest road network, rail lines, hydro-electric power generation capacity, and a highly skilled workforce. The potential exists to produce another 40 Billion dollars in metals…” “Bob Thompson of the Geological Survey of Canada said, “The South has the infrastructure, your exploration dollar goes ten times further, you can mine much lower grade and much lower tonnage because the infrastructure is here. The most economically viable piece of country in Western Canada is adjacent to the 49th parallel. This is an area of high economic potential and it hasn’t had any money spent on it for a long time. There has not been nearly enough activity and maybe it is time to generate something new here.” “Still true today!”

  39. Canada Exploration ProgramsKootenays British Columbia Over 13,500 Km2 under Mineral Tenure

  40. Canada Exploration ProgramsCopper Cat Resources Inc Silver Lynx Project High Potential for a deposit of Silver Lead Zinc #1 Priority BC Project

  41. Canada Exploration ProgramsCopper Cat Resources Inc Silver Lynx Project Silver Lead Zinc Outcropping Approximately 1 meter x 6 meterexposed mineralization by road cut

  42. Canada Exploration ProgramsCopper Cat Resources Inc Silver Lynx Project Silver Lead Zinc Copper Samples from Outcrop Thin sections and rock analysis by Vancouver Petrographics Incindicates mineral assemblage has the aspects of a Volcanic Massive Sulfide (VMS) Exhalative-Type Deposit “A potential new type of deposit (VMS) in the Rossland Rock Group” according to Government GSC Report by Trique Hoy, PGeo Possible Low-Tonnage High-Grade Deposit from Assay Values received from Mineralized Outcrop & Tallus Materialby a logging road. Highest sample by Cassidy Gold Corp (2004) 24.59% Zn 22.35% Pb 556.4 g/t Ag 0.21% Cu (BC Govt Ministry of Mines, Energy and Petroleum Resources MINFILE No 82FSW378 Cassidy Gold Corp Report 2004) Single Chip Sample collected by L.Buss (Aug 2008) Certificate of Assay AK 2008-1206 12.4% Zn 3.9% Pb 134 g/t Ag 0.38% Cu Cut section of high grade rock sample supplied by Bruce Doyle

  43. Canada Exploration Programs Copper Cat Resources Inc Silver Lynx Main Area Regional Plan of main Silver Lynx Mineralized Zones to south

  44. Canada Exploration ProgramsCopper Cat Resources Inc Bird Creek Project / Silver Lynx Extension Contiguous to the north of Silver Lynx Recent Property ICP Results Eco Tech Lab Kamloops BC Five highest values of 65 boulder/float samples (September 2007) Certificate of Assay AK 2007-639 0.2 g/t Au 72 g/t Ag 1.46% Cu 15.6 g/t Au 152 g/t Ag 4.90% Cu 39.6 g/t Au 332 g/t Ag 3.60% Cu (Bird Creek Location) Certificate of Assay AK 2007-1106 15.2 g/t Au 35.1 g/t Ag 2.18% Cu 66.0 g/t Ag 5.99% Cu (Drummond Location) Two Chip Samples (August 2008) collected by L. Buss Certificate of Assay AK 2008-1206 8.26 g/t Au 54 g/t Ag 4.55% Cu 1.03 g/t Au 1.3% Cu (Bird Creek Location)

  45. Canada Exploration ProgramsCopper Cat Resources Inc Bird Creek Extension Regional Plan of main Bird Creek Mineralized Zones to north

  46. Canada Exploration ProgramsCopper Cat Resources Inc Silver Lynx & Bird Creek Projects Combined Regional Grid Silver Lynx & Bird Creek with Initial Drill Targets 7,200 Meter Initial Drill Layout on principle outcrop area of Silver Lynx Main (inset) Inferred Resource Calculation & 43-101 to follow Three mineralized lenses in SL Main inset High Consistent Geochem Soil Values indicate 3-4 potential large porphyry zones over the entire Silver Lynx / Bird Creek region Three large unknown regions (circled ?) scheduled for sampling - Potential huge polymetalic deposit MIRACLE MOUNTAIN BIRD CREEK MAIN BIRD CREEK NORTH BIRD CREEK SOUTH DRUMMOND DRUMMOND SILVER LYNX NORTH SILVER LYNX MAIN SILVER LYNX SOUTH

  47. Canada Exploration ProgramsCopper Cat Resources Inc Silver Lynx Main Drill Plot Permitted for 7200 Meters

  48. Canada Exploration Programs Copper Cat Resources Inc Silver Lynx Project Budget to Drill 7,200 Meters on Main Mineralized Zone PERMITTED & DRILLING TO START Accommodation, Transport, Communication $75,000 Drill Pads and Preparation $20,000 Geologists and Local Crews $75,000 Surveying $20,000 Drill Contractor (Mob/Demob, Fuel, Meters) $720,000 Analytical / Lab (ICP) $160,000 Geological Equipment and Tools $50,000 Community Relations / Compensation / Reclamation $40,000 Licenses / Option Fees $20,000 NI 43-101 Report $20,000 Contingency 10% $120,000 TOTAL BUDGET $1,320,000 Projected Time Line to Complete Time Line after Drills on site (18 holes @ ~400 meters) 30-40 days Core Results from Lab 30 days Resource Calculation & News Release 60 days Potential NI 43-101 Report 30 days TOTAL TIME (double shift two drills) approximately 5 Months

  49. Canada Exploration ProgramsNight Owl Resources Inc Green Horn Copper Project High Potential for a large Deposit of Copper Silver Liberty’s #2 Priority BC Project

  50. Canada Exploration ProgramsNight Owl Resources Inc Green Horn Copper Project Extensive Copper Mineralization Optioned north of Nakusp Mineral Option Tenures Greenhorn Strike Arrow Lake Dunn Creek Cu Showing Liberty Direct Claims NAKUSP