1 / 22

RAP Incentive System

RAP Incentive System. Robert C. Rea, P.E . Materials and Research robert.rea@nebraska.gov. History How it works Post Consumer Recycle Content Label. RAP Incentive System. RAP. R eclaimed A sphalt P avement Millings from the roadway 5 % Binder (Oil) 95 % Aggregate. 1 Ton of RAP.

powellg
Download Presentation

RAP Incentive System

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAP Incentive System Robert C. Rea, P.E. Materials and Research robert.rea@nebraska.gov

  2. History How it works Post Consumer Recycle Content Label RAP Incentive System

  3. RAP Reclaimed Asphalt Pavement • Millings from the roadway • 5 % Binder (Oil) • 95 % Aggregate

  4. 1 Ton of RAP • 5 % Binder (Oil) • $35/ton • 95 % Aggregate • $14/ton ____________________ $49/ton material value 5% 95%

  5. Driving factors Millings stockpiles scattered around the state as many as 75 large stockpiles and hundreds of ‘sites’ some called ‘mountians of millings’ Couldn’t store any more 2008 Polymer and Binder shortage, binder cost doubled

  6. Average RAP Content What Changed? 27.3% RAP RAP Incentive 6.9% RAP

  7. Binder Savings Incentive How Does it Work ? % Incentive To ContractorTo NDOT 15 % 85 % 1 - 65 % 35 % 2 - 50 % 50 % 3 -

  8. Example from Contract Perspective Binder $650/Ton Paid as a separate item Mix Design Binder 5.4% RAP from project 5.4% Binder Aggregates $15/Ton Production Costs $25/Ton

  9. Cost Components

  10. Cost Components

  11. Cost Components

  12. Cost Components

  13. Average RAP Contents 39.4% 38.9% 39.2% 38.8% 37.3% 34.4% 28.6% 27.3% 6.9%

  14. Annual Savings from RAP Optimization 46.3M 45.7M 43.6M 41.7M 35.3M 31.9M 23.3M 19.8M 3.6M

  15. 2008 – 2018 Recycled Savings 7,000,000 Tons of Aggregate 400,000 Tons of Binder Crude Oil $400,000,000 savings in material costs

  16. Post Consumer Content Label Began using in 2014 In plan sets and Annual Report Show NDOT’s commitment to recycling and environmental stewardship Based on quantities of Asphalt and Concrete and calculated recycled contents

  17. Post Consumer Content Label

  18. Post Consumer Content Label

  19. Post Consumer Content Label

  20. NDOT Annual Report

  21. Thank You ! Questions ?

More Related