An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NRC’s Component Design Bases Inspections Donald P. Norkin U.S. Nuclear Regulatory Commission June 11-14, 2006Richmond, VA

  2. History • April 29,2004 - SECY 04-0071 - Proposed Pilot • 2004/2005 - Temporary Instruction 2515/158 • Vermont Yankee • V.C. Summer • Kewaunee • Diablo Canyon • May 1, 2005 - SECY 05-0118 - Pilot Results • January 2006 - Implement Component Design Bases Inspections

  3. Component Design Bases Inspection (CDBI) • 15-20 Risk Significant and Low Design Margin Components • 3-5 Relatively High Risk Operator Actions • 4-6 Operating Experience Issues • Replaces Safety System Design and Performance Capability (SSDPC) Inspection • Biennial - All Plants Will Receive CDBI Either in 2006 or 2007 • Will Develop Criteria for Determining Scope of Design/Engineering Inspections After 2007

  4. Significant Changes from SSDPC Inspections • Components vs. Systems, Which Impacts Licensee Document Retrieval • Margin Review for Sample Selection • Operating Experience • Enhanced Inspection Preparation and Sample Selection • Additional Week for Site Inspection • Increase Use of Contractors Having Hands-On Design Experience

  5. Staffing • Team Leader • Two Design Specialists (Typically Mechanical and Electrical Contractors) • Two Regional Inspectors (Operations and Engineering) • Part Time Support from Senior Reactor Analyst and Resident Inspector for Sample Selection • Trainee (If Possible)

  6. Schedule • Week 1 On-Site Info Gathering • Week 2 In-Office Prep/Sample Selection • Week 3 Sample Selection/On-Site Inspection • Week 4 In-Office Inspection • Week 5 On-Site Inspection • Week 6 or 7 On-Site Inspection/Exit Meeting

  7. Insights From Pilot Inspections • Pilot CDBIs Had More Findings Per Inspection Hour Than SSDPCs • More White Findings Than for SSDPCs • Most Findings Involved Original Design, Corrective Actions, and Operating Procedure