An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ASHRAE Standard 90.1-2013 Aiming at 50% Energy Savings For 90.1-2013

  2. ASHRAE Standard 90.1-2013 • Background on Standard 90.1- 2013 • The “Goals” for 2013 • Changes under consideration • The Future

  3. 90.1-2010 – 2013 • ASHRAE Technology Committee - Ad-Hoc Committee on Energy Targets – June 2010 • Promote EUI as measurement • Encourage use of ASHRAE Stds 62.1 & 55 • SSPC 90.1 responsible for our energy targets • Standard 90.1 IS NOT the foundation for meeting Vision 2020 or NZEB • AEDGs are mechanism for NZEB

  4. ASHRAE Standard 90.1 Revision Goals • Technically justified • Simplicity • Flexibility • Enforceable

  5. 90.1-2010 – Major Step Title, Purpose & Scope change • Expand to new areas • Commercial/industrial equipment/processes • Identify & engage stakeholders

  6. ASHRAE Standard 90.1-2013 Timeline • MILESTONES • 90.1-10 Work Plan – 30% • 90.1-13 Work Plan – 50% • on regulated end use loads • 90.1-13 Work Plan – 40% • whole building (all end uses) • 90.1-13 Work Plan – EUI • 90.1-13 Work Plan – Alternate • Performance Methodology (APM) 30% 50% 40% APM 2004 Std 90.1-04 Future 2007 Std 90.1-07 2010 Std 90.1-10 2013 Std 90.1-13

  7. ASHRAE Standard 90.1 Sections • Section 1: Purpose • Section 2: Scope • Section 3: Definitions • Abbreviations • Section 4: Admin. And • Enforcement • Section 5: Building • Envelope • Section 6: HVAC • Section 7: SWH • Section 8: Power • Section 9: Lighting • Section 10: Elec. Motors • Section 11: ECB • Section 12: References • Appendices • Appendix C – Envelope • Appendix G - ECB

  8. ASHRAE Standard 90.1 • Since • July 1, 2010 • 2010 Users Manual • 23 New Addenda in process • 4 from previous cycle

  9. ASHRAE Standard 90.1 In Progress ENVELOPE • Building envelope (Addendum “bb” – 4th PR) • Door leakage • Cool Roof standards • Dynamic glazing & fenestration labeling

  10. ASHRAE Standard 90.1 In Progress LIGHTING • Escalator controls • Elevator lighting • LPD revisions • Electric motors • Electrical Metering • Branch circuit controls

  11. ASHRAE Standard 90.1 In Progress MECHANICAL • Commercial refrigeration • Heat pump efficiencies • SPVAC & SPVHP efficiencies • Transformer testing • Damper leakage

  12. ASHRAE Standard 90.1 In Progress MECHANICAL • Fan efficiencies –Advisory Public Review (APR) • Engaged interested parties • Set min Fan Efficiency Grade (FEG) > 67 • Based on AMCA 205-10 • Covers fan motor ratings > 1/6 hp • Does not cover fan systems • Addendum excludes • Fans with bhp< 5 • Fans covered by 6.4.1.1

  13. ASHRAE Standard 90.1 In Progress Energy Cost Budget • Cooling Towers • Laboratory Exhaust • Building Orientation • Fenestration • Temp & Humid Schds • Computer room criteria • (Addendum cj - 3rd PR)

  14. ASHRAE Standard 90.1 In Progress Energy Cost Budget - Renewables • Site-recovered & Site-generated energy credit allowed • Not considered “purchased energy” • Deducted from “proposed design” energy consumption • Credit < 5% for calculated energy cost budget

  15. ASHRAE Standard 90.1 Under Discussion Continuous Maintenance Proposal (CMP) • Data Centers PUE = Total Energy @ Meter ÷ Peak IT Equipment Energy

  16. ASHRAE Standard 90.1 Under Discussion Continuous Maintenance Proposal (CMP)

  17. ASHRAE Standard 90.1 Under Discussion Other Continuous Maintenance Proposals (CMPs) • Systems testing personnel limitations • Economizer revisions • Luminaire limitations • Definition of cooling design temperature • Revisions to evaluate systems with Appendix G

  18. ASHRAE Standard 90.1 Under Discussion Other Informal Concepts • Revisions to single & multi-zone VAV systems • PTUHP and DX equipment revisions • Occupancy controls for dedicated HVAC system • Energy recovery systems enhancements • Energy recovery for space heating • Cooling tower controls and efficiency

  19. 90.1-2010 – 2013 & Future • Wholisticsystems designs • Systems Design and subsystems effects

  20. 90.1-2010 – Future • Alternate Performance Methodologies • Determine “base minimum” using whole building designs • Explore regional utility rates • Explore time/demand rates • Consider water use and rates • Explore criteria metrics other than cost savings (e.g. system efficiencies) • Address renewables (site based & grid based) • Use AEDG format for the 90.1 standard

  21. 90.1– Moving Forward • Input Needed – Ideas Welcome • Designers • Equipment & Material interests • Code Officials • the list goes on ……… Come join the fun!