Diamond Light Source Update Richard P. Walker. Current Machine Status. Target Achieved Energy 3 GeV 3 GeV Beam current 300 mA 300 mA Machine Development 250 mA User Mode Emittance - horizontal 2.7 nm rad 2.7 nm rad - vertical 27 pm rad 4-50 pm rad ~ 27 pm in User Mode

ramiro
Download Presentation

Diamond Light Source Update Richard P. Walker

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Diamond Light Source UpdateRichard P. Walker

  2. Current Machine Status Target Achieved Energy3 GeV 3 GeV Beam current 300 mA 300 mAMachine Development 250 mA User Mode Emittance - horizontal 2.7 nm rad 2.7 nm rad - vertical 27 pm rad 4-50 pm rad~ 27 pm in User Mode Lifetime at 300 mA > 10 h ~ 18 h Min. ID gap7 mm 5-7 mmUser Mode, depending on ID Stability< 10% 2.5% (H), 7.5% (V) No feedback of beam size 0.5% (H), 1.7% (V) Feedback, 1-100 Hz & divergence 0.7% (H), 7.3% (V) Feedback, 1-1000Hz

  3. 12 Insertion Devices Operational • 10 in-vacuum undulators • 1 variable polarization APPLEII device • 1 3.5T superconducting wiggler

  4. Future Insertion Devices (i) • I04.1 • Short, ex-vacuum, permanent magnet device; under construction in-house, installation Dec. ’08/Jan. ’09. • I12 • Superconducting multipole wiggler, 4.2 T, contract with BINP. • FAT next week; installation Mar. ’09. • I20 • 2 x hybrid wigglers, W83, construction in-house; • installation Jun. and Aug. ’09 • I07 • Cryogenic Permanent Magnet Undulator (U17.7) contract with Danfysik. Installation end ’09. Spare in-vacuum U23 device installed as a temporary measure.

  5. Future Insertion Devices (ii) • I10 • 2 x APPLE II devices with 10 Hz polarization switching using 5-kicker scheme; engineering implications under study •  2 girder changes • I13 (L) • 2 x in-vac. undulators with “double mini-beta” optics proposed; • beam dynamics and engineering implications under study. •  1 or 2 girder changes • I09 (L) • Helical undulator + in-vac. CPMU, with “double mini-beta” optics proposed; beam dynamics implications under study. •  1 or 2 girder changes

  6. “Double mini-beta” optics for I13

  7. User-Mode Operations “Standard” operation: 250 mA maximum, 2 injections/day Aiming for 300 mA early next year – reliability more important than beam current.

  8. User-Mode Operations 3120 h in 2007, 92.4% uptime 4080 h in 2008, 94.8% uptime so far 4656 h in 2009

  9. User-Mode Operations

  10. User-Mode Operations

  11. User-Mode Operations

  12. So what’s going on with the RF ? • mostly cavity vacuum trips, associated with very rapid pressure rise and collapse of cavity volts • appear to be “conditioning events”, but mechanism not understood • conditions have been changing too much (beam current increases, cavity warm-up etc.) to correlate trips with anything For more information see Morten Jensen’s presentation at ESLS RF No. 12: http://www.diamond.ac.uk/Technology/RF/Agenda

  13. In-vacuum Undulator Minimum Gap Beam loss monitor counts at the IDs (red) and at the collimator (yellow) due to closing each ID individually to 5 mm gap IDs 2, 3 and 4 have significantly higher radiation losses at 5 mm gap compared to all 7 other in-vac IDs Why ? .. proximity to the collimators ?? Investigations ongoing

  14. Top-Up • First operation with external users, 3 days, Oct. 28-30th • No top-up failures, no beam trips due specifically to top-up

  15. Top-Up • Injection every 10 mins, typically 20-25 shots (single bunch) at 5 Hz • Current stability typically ± 0.5 % • (± 0.35% due to lifetime, 24 h at 250 mA) • Experience was positive - regular top-up operation from now on ! • Injection efficiency drift needs to be understood, and cured ….

  16. … thanks for your attention http://www.diamond.ac.uk