An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Emanuel Karantzoulis, Alessandro Fabris, Sincrotrone Trieste, Trieste, Italy. Status of Elettra Acknowledgments: S. Bassanese, P. Borsi, A. Carniel, S. Krecic, M. Svandrlik, R. Visintini

  2. 2 Overview /Pre-injector/Booster/Storage ring/Conclusions • OUTLINE • New injector • Pre-injector • Booster • Elettra performance and statistics • Conclusions

  3. 3 Overview /Pre-injector/Booster/Storage ring/Conclusions 2008 2007

  4. Overview /Pre-injector/Booster/Storage ring/Conclusions • NEW ELETTRA INJECTOR • GENERAL PROJECT ASSESMENT • Project timeframe: March 2005-March 2008. • Concluded on budget and on time. • 100 man-year of personnel matrixed to the project. • BOOSTER MILESTONES: • Building construction: September 2005 - July 2007 • Installations: April 2007 - August 2007. • Commissioning from September 2007. • First injection for users: March 3rd, 2008 as planned. 4

  5. Overview /Pre-injector/Booster/Storage ring/Conclusions • Pre-injector energy: 110 MeV maximum, 100 MeV operating • Operating improvements: • Pre-injector synchronous with Elettra RF master oscillator. • Safe operating conditions of pre-injector during storms: • power interruptions could damage the HV cabinet or klystron itself. • Interruption relay of HV modulator on UPS • Act on the thyratron trigger interlock time. • Work in progress ( to be completed in 2008): • Completion and test of spare modulator. • Construction of a spare gun. Buncher direct and reflected power vs. RF freq. Section direct and reflected power vs. RF freq. 5

  6. Overview /Pre-injector/Booster/Storage ring/Conclusions • Booster Operational Progress • Full energy injection at 2 GeV for users (March 3) with 3 HC tuned (ramping frequency: 1.5 Hz). • 2 GeV injection with IDs at user gaps (test). • Full energy injection at 2.4 GeV (April 13-machine shifts). • Major dipole pwr converter fault (April 16). • Restored 2 GeV injection from August 29 (ramping frequency: 2.4 Hz). • 2.4 GeV full energy injection (November 25). 6

  7. Overview /Pre-injector/Booster/Storage ring/Conclusions • Power converters status • Dipole: 2.4 GeV @ 3 Hz will be tested in this run. • Quadrupoles: 2.5 GeV @ 3 Hz reached. • Sextupoles: delivered. To be tested on the load, we continue to operate with the spare corrector supplies. • Refurbishing activities (possible only during Elettra shutdowns): • Improved layout and cards to lower interference from EM noise, improve grounding, eliminate communication errors. • New IGBT trigger cards embedding low level protection to reduce number of failures and improve functionality. • Work in progress: ripple and stability. At present X10 above At present X3 above 7

  8. Overview /Pre-injector/Booster/Storage ring/Conclusions (5.39,3.42) 8

  9. Overview /Pre-injector/Booster/Storage ring/Conclusions • Maximum injection efficiency > 95% 1.0 Hz Ratio 2.18 so 1.4/2.18=0.642 i.e ~100 % efficiency • Booster max current above design value (5 mA/shot) 1.5 Hz Again efficiency >95% 9

  10. Overview /Pre-injector/Booster/Storage ring/Conclusions Impact on Elettra operation 0.75 or 0.9 GeV (accelerator physics time) for SR-FEL and SISSI CIR 10

  11. Overview /Pre-injector/Booster/Storage ring/Conclusions • RF UPGRADE • One 150 kW plant (2 x 80 kW IOTs) • Upgraded one of the two transmitter with a new tube (TH793-1 from THALES) and circuit type assembly in October 08. • Up to now IOTs’ lifetime is not comparable with klystrons’. 11

  12. Overview /Pre-injector/Booster/Storage ring/Conclusions Up to date: 3144 scheduled hours of user operation out of a total of 4032 (77.9%) • Up to date: 3144 scheduled hours of user operation out of a total of 4032 (77.9%) • Uptime: 95.3 excluding storms, 91.9 % including storms, 322 h 12

  13. Overview /Pre-injector/Booster/Storage ring/Conclusions • PRE-INJECTOR: performs quite well, working to improve. • BOOSTER • PS are the major source of problems. • Next steps: • Bring PS’s in tolerances (and also any other system if necessary). • Complete instrumentation. • Increase stability and reliability. • Reach and establish operation at 3 Hz and 2.4 GeV. • STORAGE RING • Elettra is already showing the beneficial signs of the full energy injection. • Next steps: • Reduce refill times to ~ 10 minutes (reduce ID gaps at injection, keep GOF on during refills). • Keep current above 200 mA (2 refills/day). • Dedicate more machine shift for studies to implement top-up. 13