1 / 3

DSS Advisory Board

DSS Advisory Board. Current Status for DSS Good progress on software Database interface is advancing Installation Schedules Review of DSS project could be made in May Installation of first prototype DSS in 3 rd Quarter Experimental requirements? Necessary services for DSS operation

sauda
Download Presentation

DSS Advisory Board

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DSS Advisory Board • Current Status for DSS • Good progress on software • Database interface is advancing • Installation Schedules • Review of DSS project could be made in May • Installation of first prototype DSS in 3rd Quarter • Experimental requirements? • Necessary services for DSS operation • Status for electricity, networking, etc? • Sensors for DSS • Who provides which sensors?

  2. Receive Digital Inputs DIN History (only DIN,VAIN,ALM,ACT) Analog Inputs AIN Boundary violation Access Error Virtual AINs VAIN Alarm Evaluation AEV Warm/Coldstarts PS Modules I/O Access Redundancy CPU Memory CPU Timing DSS Code Event based Alarms ALM PLC interrupts Alarm to Action relations A2A CPU Status Module Status Com. Status PLC Status Actions ACT Periodic DSS Status PLC Status DSS Main Cycle

  3. Standard LEP rack 56U (52U used) • 4U: UPS (APC.com ?) • 1U: OPC Server PC • 2U: Local Display • 7U: CPU (left, only in CPU racks ;-) • 7U: PS (right) • 12U: External crates (max. 2) • 1U: Sliding table DSS CPU/External Rack 56U (256cm) • 25U: patch panel WAGO modules (some including • relais / optocoupler) • maybe OPC Server PC behind patch panel • Racks accessible from behind ?

More Related