An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DIFFERENCES: • SUBCONTRACTOR LISTING • (POST AWARD) • VALUE ENGINEERING • (CHANGE ORDER #1) • MULTI-PHASE CONTRACT • PLAN APPROVAL OCCURS • (POST AWARD) • ELIMINATES CHANGE ORDERS FOR ERRORS & OMISSIONS PHASE I DESIGN SERVICES ISSUE DESIGN-BUILD CONTRACTS PHASE 2 CONSTRUCTION LEGAL

  2. SOME RECENT EXAMPLES at San Diego State University

  3. TRADITIONAL DESIGN-BID-BUILDGrade: D Science Lab Building • Issues: • Change Orders = 8% • 2 Years Late • Claims High • Lawsuits & Settlement w/Sub-Contractors Cost: $36 Million Size: 106,000 Square Feet Completion Date: June 2001

  4. TRADITIONAL DESIGN-BID-BUILDC/G RENOVATION GRADE: A Completed: 6/03 Cost: $19.2 M • Issues: • Under Budget • Change Orders 5% • Scheduling • Multiple Contracts

  5. “PURE” DESIGN-BUILD Villa Alvarado Apartments Grade: C- • Ninety 1- & 2-BR Apartments • Completed: 1986 • Cost: $5.3 Million Issues: Low Quality Control Too Many Options

  6. “PURE” DESIGN-BUILD Parking Structure 4 Grade: B+ • 2,100 Parking Spaces on 8 Stories • Completed: 1994 • Cost: $12 M Issues: Foundation Claims

  7. “PURE” DESIGN-BUILD Grade: A Parking Structure 5 / Aztrack • 1,460 Parking Spaces -- 2 Stories • Sports Deck - Soccer and Track & Field • Completion: 2000 • Cost: $19.5 M Issues: Owner Project Management Team

  8. CM @ RISK w/GMP East Commons Renovation Grade: A Issues: Scheduling/Operations

  9. CM/GC Original Gateway Building Grade: B- • 150,000 SF Mixed Use Office • Completed: 1990 • Cost: $16.5 M Issues: Quality Sacrificed

  10. CM/GC Grade: A Tony Gwynn Baseball Stadium Completed: 1998 Cost: $5.5 M Issues: None

  11. CM/GC Aztec Athletics Center Grade: B • 127,000 SF • Completed: 2001 • Cost: $20.5 M • Issues: • Changing Program • GMP Not Achieved/Redesign

  12. “PERFORMANCE” DESIGN-BUILD Cogeneration Facility Grade: A • 14 Megawatt Generation • 25,000 Lbs/Hour High Pressure Steam • Completed: 12/02 • Cost: $17.5 M Issues: Complicated Criteria for Evaluation & Performance