Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe. MXS control june 17, 2010. PERT chart changes. Added section for MXS testing; asked Keith to send MXS by end of next week See chart at http://nasa.ece.olin.edu/projects/2010/mxs/files/PERT_chart.xlsx. PIC code.

signa
Download Presentation

MXS control june 17, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gwynneth Davidoff, Kendall Pletcher, Mary Schmidt, Amy Whitcombe MXS controljune 17, 2010

  2. PERT chart changes • Added section for MXS testing; asked Keith to send MXS by end of next week • See chart at http://nasa.ece.olin.edu/projects/2010/mxs/files/PERT_chart.xlsx

  3. PIC code • Got Brad’s USB DAQ to work • Measures input voltages, outputs desired voltages • We would only need to adjust which pins we use (whether we want an external ADC and more outputs) • ID what we do not need from the code

  4. GUI code • Completed: • Constraining user inputs to specified limits • Determining how to implement ASCII file loading • In progress: • Testing ASCII file loading • Continuous updating • PIC interface

  5. Next steps • Continue finalizing GUI and PIC code • Work on interfacing GUI and PIC