An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Build to Cost Meeting:Major NGAO system cost savings ideas Don Gavel NGAO Team Meeting September 11-12, 2008

  2. Performance Space • Shrink performance along axes to cut costs • Not necessary to cut all axes uniformly • Know the consequence of each reduction • Science Impact • Marginal Cost Reduction • Decide what is a “core” defining NGAO that fits the cost cap and is still worth the cost Wavelength Strehl Sky Coverage Field of View (Regard) Contrast Sensitivity / Throughput / Emissivity Multiplicity of Instruments

  3. Major Cost Savings Scopes • Cut Laser Power – by a third?, by one half? • Eliminate wide field d-IFS, concentrate science in 30 arcsec field • 6 LGS, 3 roving for point and shoot, 3 are fixed • Remove one of the two AO relays • Fewer optomechanical components • Improved throughput • Not split-relay • Pare down or eliminate the “switchyard” • Reduced number of instruments • One focal plane (shared for science & LOWFS) • Reduced number of dichroics and changers • Reduce automation • Sacrifice “instant” configurability

  4. More Cost Savings Scopes • Cut number of instruments • Refurbish and reuse OSIRIS • Combined visible/IR sensor in imager • Pare down dIFS multiplicity – one dIFS? Two dIFS with shared dewar? • Purchase science imagers from commercial supplier • Live with specs from off-the-shelf design • Make the opto-mechanics physically small • Off-the shelf optics and mounts • Smaller space to enclose and cool • Cut number of actuators • Trade with other error budget elements to minimize impact • Limiter: short wavelength coverage

  5. Even More Cost Saving Scopes • Accelerate the project plan • “Then-year” dollars loose value over time (with inflation) • Not necessary to finish earlier, just spend earlier – maybe by overlapping portions of design and FSD phases • Reduce technical risk • Targeted prototyping and simulations • Avoid overruns due to rework of uncertainty/untested systems failing to meet expected performance on first implementation