Pre-Bid Conference for DCBO RFQ: Blythe Solar Power Project Phase 2, Units 3 and 4

Join the pre-bid conference for the Delegate Chief Building Official (DCBO) RFQ for the Blythe Solar Power Project Phase 2, Units 3 and 4. Learn about contracts, loan division, and environmental protection.

stamos
Download Presentation

Pre-Bid Conference for DCBO RFQ: Blythe Solar Power Project Phase 2, Units 3 and 4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Siting, Transmission and Environmental Protection (STEP) DivisionPre-Bid Conference for theDelegate Chief Building Official (DCBO) Request for QualificationsBlythe Solar Power Project Phase 2, Units 3 and 4(09-AFC-6C) California Energy Commission, Sacramento, CA. October 16, 2018

  2. DCBO Pre-Bid Conference Contracts and Loan Division • Andrea Hoppe, Commission Agreement Officer Siting Transmission & Environmental Protection Division (STEP) • Christine Root, STEP Compliance Office Manager • Eric Veerkamp, Compliance Project Manager

  3. CBO Authority / DCBO The Energy Commission is the Chief Building Official (CBO) and has the responsibility of enforcing the California Building Code. • Authority to delegate to either a local building official or an independent third party. The Delegate CBO represents the Energy Commission: • Engineering plan review and on-site inspections. • Staff retains CBO authority: • Interpretation and enforcement of state and local codes.

  4. DCBO Pre-Bid Conference • The Blythe Solar Power Project, Units 3 and 4 will be a nominal 250 MW (125 MW for each unit) solar photovoltaic electric generating station. The project owner may utilize both thin-film solar (cadmium telluride), and polycrystalline silicon panels. The arrays will utilize a single axis tracking system. • Project elements include the solar modules, with tracking mechanism and inverters, transformers, combiner boxes, and associated underground conduit.

  5. DCBO Pre-Bid ConferenceKey Items To be Aware Of • Zero Sum Contract • Winning firm will contract directly with NextEra Energy for payment after completing negotiations with the Energy Commission. • Rates will be negotiated through the Energy Commission Process. • Contract cap will be negotiated by the Energy Commission and will be based on information provided by the project owners and our needs. • Third Party Beneficiary Agreement (Attachment 10)

  6. DCBO Pre-Bid Conference Key evaluation criteria Minimum Requirements • Certification Regarding Conflicts of Interest • Project Team Minimum Requirements Forms

  7. Minimum RequirementsCertification Regarding Conflicts of InterestCOI Form- Attachment 8

  8. Minimum RequirementsCertification Regarding Conflicts of InterestCOI Form- Attachment 8

  9. Minimum RequirementsProject Team Project QualificationsAttachment 11

  10. Administrative Items Grounds for rejection • Submitting Statement of Qualifications (SOQ) late • Missing required forms or signatures • Conflict of Interest • Anything marked “Confidential” or “Proprietary” • Submitting multiple SOQs • Unreported Public Interest Energy Research Program Royalties

  11. ACTIVITIES AND KEY DATES * An addendum will be released if the dates change for the asterisked (*) activities.

  12. STEP Division Website, ListServer, Project FSA, and DCBO RFQ Solicitation Files Siting Transmission & Environmental Protection Division http://www.energy.ca.gov/siting/ Energy Commission ListServers http://www.energy.ca.gov/listservers/ Blythe Solar Power Project Final Commission Decision Docket Log Transaction #201580 https://efiling.energy.ca.gov/Lists/DocketLog.aspx?docketnumber=09-AFC-06C Blythe Solar Power Project DCBO Solicitation Files http://www.energy.ca.gov/contracts/

  13. Questions?