An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Linac4Accord Technique #1M. Vretenar, CERN O. Napoly, CEA Y. Gomez, CNRS-LPSC A. Variola, CNRS-LAL

  2. Background • Linac4 in the construction phase (visit to the CE works after lunch): procurements 2009-11, installation 2012, commissioning 2013. • Few development topics, contributions more oriented towards hardware procurements. • Main subjects: • a. contribution to design and tuning of the RFQ, as a continuation towards the CERN RFQ of the collaboration on the IPHI RFQ. • b. procurement of some high-tech hardware by French laboratories willing to increase their experience in particular fields: HV modulators for klystrons and medium-power RF amplifiers

  3. Linac4 Master Plan New Masterplan for MTP – some modifications with respect to the plan presented on 12.03 MILESTONES: • Building delivery: December 2010 • Infrastructure installation: 2011 • Machine and equipment installation: 2012 • Linac commissioning: 2013 • PSB modifications: shut-down 2013/14. • Beam from PSB: April 2014.

  4. Contributions (detail) • Contribution to the design, RF tuning and commissioning of the Linac4 RFQ, profiting of the CEA experience with the design and construction of the IPHI and SPIRAL2 RFQs. This team would be associated to the development already started at CERN. • 2. Procurement and testing of a solid-state RF amplifier for the Linac4 bunchers, using the experience gained by the RF team at LPSC Grenoble with the SPIRAL2 project. This team would be associated to a development already started at CERN. • 3. Construction and test of the high-voltage modulators that will feed the klystrons of Linac4, profiting of the team involved in the modulators of LAL. The LAL team would be associated to the developments done at CERN which has recently built and commissioned a prototype modulator.

  5. French contributions – physical locations RF amplifier modulators RFQ

  6. RFQ - 1

  7. RFQ - 2

  8. Buncher amplifiers Note that no VAT is included in the cost estimated by CERN !

  9. Modulators Difference of +71.4 kEUR with respect to the initial agreement (1.5 MEUR). The correction was made in September 2008 – we are investigating to find out the reason. Note that no VAT is included in the cost estimated by CERN !

  10. 1.1 Contributions to Linac4 RFQO. Napoly, CEA

  11. 1.1.1: “Design studies of the Linac4 RFQ” Conception: ∙ conception RF 3D : achevée ∙ conception du couplage de puissance ‘(‘ridge’) : achevée ∙ évaluation thermomécanique : achevée ∙ antennes (‘pickups’) intégrées aux pistons d'accord discussions en cours pour la réalisation et l’approvisionnement de 16 antennes RF ∙ principe de mesure de la loi de tension en fonctionnement en cours ∙ réglage de la loi de tension en fonctionnement par régulation des températures calcul f/T effectué, en cours d’exploitation  08/2009

  12. 1.1.2: “Measurement and commissioning on the Linac4 RFQ” Banc de mesure par perturbation (‘bead-pull’) ∙ électronique et logigiel: achevés (possible mise au point pour compatibilité avec nouvel Analyseur de Réseau Vectoriel) ∙ mise en plan de la mécanique: achevée, consultation faite, commande S29 ∙ réalisation de la mécanique et transfert au CERN: 2009/11 Réalisation des accessoires de mesure (pistons, 5 pickups et doigts régables) ∙ mise en plan de la mécanique: en cours ∙ réalisation de la mécanique: 2009/11 Mesures RF ∙ tronçon TR1 avant brasage: ~ 2009/11 ∙ tronçons TR2-TR3 : ~ 2010 ∙ RFQ: ~ 2011 Réalisation des antennes intégrées (connecteur+coax+boucle) x 16 ∙ mise en plan, réalisation: à venir

  13. Bilan Financier CEAau 1er semestre 2009

  14. 2. Participation du LPSC pour LINAC 4Workpackage 2.10 ‘L’achat et le test d’un amplificateur RF 352 MHzY. Gomez Martinez, LPSC

  15. Budget

  16. Ressources humaines

  17. Planning *Si demande de dérogation accepté

  18. 1.3 Construction and test of klystron modulatorsA. Variola, CNRS-LAL

  19. Situation • Different meetings in CERN and LAL to agree on the organization • Changement of responsible in CERN • Decision to split in two the contracts • CERN want to keep the technical control of the project • At present we are waiting for participating in the tests phase at CERN • LAL: One existing IE at present in LAL. • In the future there will be a board for a permanent position: maybe also in LAL the contact person will change!!! • Splitting in two the contract is twice the work for the definition documents. This was not foreseen at the beginning. We are asking 8 MM more to support the documents preparation • 230kEuros received for the ancillaries • At present ~ 1 MM @ LAL