Construction Site – current Google Maps View

Construction Site – current Google Maps View. Construction Site today. 4. FAIR @ Darmstadt. Construction in Modules. Nuclear Structure & Astrophysics (Rare-isotope beams). Hadron Physics (Stored and cooled 14 GeV/c anti-protons). SIS18. p-Linac. SIS100 /300. UNILAC.

tiva
Download Presentation

Construction Site – current Google Maps View

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ConstructionSite – current Google Maps View Construction Site today Short Status of FAIR for NuPECC /KP 4

  2. FAIR @ Darmstadt Construction in Modules Nuclear Structure & Astrophysics (Rare-isotope beams) Hadron Physics (Stored andcooled 14 GeV/c anti-protons) SIS18 p-Linac SIS100/300 UNILAC QCD-Phase Diagram (HI beams 2 to 45 GeV/u) HESR Rare-Isotope Production Target Fundamental Symmetries & Ultra-High EM Fields (Antiprotons & highly stripped ions) Module 0: SIS100 andconnection toexistingaccelerators Anti-Proton Production Target Module 1: Experimental areas Dense Bulk Plasmas (Ion-beam bunchcompression & petawatt-laser) CR &RESR Cryring Module 2: Super-FRS NESR Materials Science & Radiation Biology (Ion & antiproton beams) 100 m Accelerator Physics Module 3: High-energyp(p-linac, p, CR,HESR) Short Status of FAIR for NuPECC /KP

  3. FAIR Experiments in all 4 scientificcoreactivities CBM APPA Super-FRS PANDA NuSTAR Short Status of FAIR for NuPECC /KP

  4. Planning Activities Short Status of FAIR for NuPECC /KP

  5. Civil Engineering New Beamline: ∑ 3.2 km thereof Syncrotron: 1.1 km Existing:SIS 18 600.000 cbm > 1 Miotonsofconcrete 35.000 tonsofsteel Short Status of FAIR for NuPECC /KP

  6. status of piling works • piling todate: • wellaheadofschedule • goal: finishedbeforeQ III/2014 Klaus Peters - Exotics at PANDA Short Status of FAIR for NuPECC /KP