1 / 18

M uon A ccelerator P rogram

M uon A ccelerator P rogram. m +. m -. MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S. n. The MAP Initiative. Muon Collider & Neutrino Factory R&D has been pursued in the U.S. since 1996 by the Neutrino Factory & Muon Collider Collaboration (NFMCC).

truong
Download Presentation

M uon A ccelerator P rogram

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Muon Accelerator Program m+ m- MUON COLLIDER & NEUTRINO FACTORY R&D in the U.S. n Steve Geer OsC RAL 21 June, 2010 1

  2. The MAP Initiative • Muon Collider & Neutrino Factory R&D has been pursued in the U.S. since 1996 by the Neutrino Factory & Muon Collider Collaboration (NFMCC). • The Muon Collider R&D activity was enhanced in 2006 by the addition of the Muon Collider Task Force (MCTF) at Fermilab. • In October 2009 the DOE-OHEP leadership requested a new unified national organization (MAP) be put in place, and prepare a proposal for an enhanced R&D program: • -Motivated by recent progress, and an increased interest in a multi-TeVMuon Collider as a possible future facility at Fermilab Steve Geer OsC RAL 21 June, 2010 2

  3. Letter from DOE-OHEP Leadership Muon Accelerator Program MAP Steve Geer OsC RAL 21 June, 2010 3

  4. MAP Organization now in place “Level 0” “Level 1” “Level 2” * L0, L1, L2 Interim assignments Steve Geer OsC RAL 21 June, 2010 4

  5. MAP Proposal • ● Submitted by Pier Oddone on behalf of the MAP collaboration, 1st March 2010. • ● 214 MAP participants (at birth) from 14 institutions: • ANL, BNL, FNAL, Jlab, LBNL, ORNL, SNAL, Cornell, IIT, Princeton, UCB, UCLA, UCR, U-Miss. • ● Anticipate a DOE-OHEP review soon. Steve Geer OsC RAL 21 June, 2010 5

  6. MAP will pursue both Neutrino Factory & Muon Collider R&D NEUTRINOFACTORY MUONCOLLIDER In present MC baseline design, Front End is same as for NF Steve Geer OsC RAL 21 June, 2010 6

  7. R&D Common to both NF & MC (from proton driver to initial cooling channel) • Front-End Design & Simulations • - Pursued in the context of the IDS-NF • Includes site specific studies for NF/MC at FNAL, including using an upgraded Project X as the proton source (coordinator: Keith Gollwitzer) • MERIT experiment (Great success – in final analysis phase) • RF studies for cooling channel cavities operating in magnetic channels • -MuCool Test Area (MTA) program • U.S. contributions to MICE (see talks tomorrow) Steve Geer OsC RAL 21 June, 2010 7

  8. MuCool Test Area • MUCOOL Test Area built at FNAL for ionization cooling component testing: • 5T magnet • RF power at 805MHz & 201MHz • LH2 handling capability • 400MeV beam from linac Steve Geer OsC RAL 21 June, 2010 8

  9. Muon Collider Decision Tree 0.5 TeV e+e- 3 TeV e+e- 3-4 TeV m+m- Pier Oddone Steve Geer OsC RAL 21 June, 2010 9

  10. Muon Collider Motivation • If we can build a muon collider, it is an attractive multi-TeV lepton collider option because muons don’t radiate as readily as electrons (mm / me ~ 207): • - COMPACT Fits on laboratory site • - MULTI-PASS ACCELERATION • Cost Effective • - MULTIPASS COLLISIONS IN A RING (~1000 turns) Relaxed emittance requirements & hence relaxed tolerances- NARROW ENERGY SPREAD Precision scans, kinematic constraints • - TWO DETECTORS (2 IPs)-DTbunch ~ 10 ms … (e.g. 4 TeV collider) • Lots of time for readout Backgrounds don’t pile up • -(mm/me)2= ~40000 • Enhanced s-channel rates for Higgs-like particles A 4 TeV Muon Collider wouldfit on the Fermilab Site COST PHYSICS Steve Geer OsC RAL 21 June, 2010 10

  11. Beam Energy Spread Beamstrahlung in any e+e- collider E/E  2 Steve Geer OsC RAL 21 June, 2010 11

  12. MAP Goals • ● Deliverables in 6-7 years: • Muon Collider Design Feasibility Report (FY16) • - Hardware R&D results → technology choice • MC Cost range (FY16) • Also contributions to the IDS-NF RDR (FY14) • ● Will address key R&D issues, including • Maximum RF gradients in magnetic field • - Magnet designs for cooling, acceltn, collider • - 6D cooling section prototype & bench test • - Full start-to-end simulations based on technologies in hand, or achievable with a specified R&D program Steve Geer OsC RAL 21 June, 2010 12

  13. Key component models Impact of the MAP Plan Muon Collider Development + NF RDR NOW MAP PLAN Steve Geer OsC RAL 21 June, 2010 13

  14. Evolution of Support Last couple of years First ~10 years NOW(FY10) FY11 NFMCC + MCTF NFMCC Interim MAP MAP ~4 M$ ~9 M$ ~10 M$ ~15 M$ (requested) (~19 M$ enhanced plan) Steve Geer OsC RAL 21 June, 2010 14

  15. Physics, Detector & Background Studies • ● In addition to MC accelerator R&D, a parallel but coordinated effort is foreseen on physics & detector studies: • Machine-Detector Interface group within MAP will generate machine background files for, and “interface” with the physics-detector activity. • - Physics-detector studies leader will participate in MAP “management council”. • ● Detailed detector & Background studies from ~10 yrs ago gave encouraging results. A lot has happened since: • New MC lattice design • - A decade of detector development • Greater community expectations for detector performance • ● New physics, detector, background studies begun: • Kick-off workshop at FNAL November 2009. • Rapid progress since then on shielding design (shielding cone angle reduced from 20deg to 10deg). • Active detector simulation group now being created. • Working towards an initial report ~mid-2011. Steve Geer SPC FNAL 17 June, 2010 15

  16. International Aspects • ● Neutrino Factory R&D is pursued in an international framework: IDS-NF • - The MAP community is committed to making the required contributions to IDS-NF studies • ● Muon Collider R&D is pursued mostly in the U.S. • - Making it more international would be a good thing • - The MICE facility is potentially a wonderful asset for longer term Muon Collider R&D • ● Had some good initial experience with joint Fermilab-UK accelerator R&D fellowships focused on muon accelerator R&D areas: • The UK host has been Imperial College • Helps build R&D relationships in areas of common interest (e.g. MuCool RF R&D program, proton source issues, …) Steve Geer OsC RAL 21 June, 2010 16

  17. Summary • ● There is a new U.S. organization (MAP). The proposed MAP plan is designed to: • Continue support of the ongoing program (including U.S. commitments to MICE and the IDS-NF • Within the next 6-7 years find out whether a Muon Collider is feasible, and roughly what it would cost (cost range). • ● The U.S. motivation for MAP is coupled to a muon-based vision for the long-term future of Fermilab. • ● International collaboration on the R&D for these very ambitious but game-changing future accelerator facilities is very desirable • Has been very good for the NF R&D program • Would be very healthy for Muon Collider R&D Steve Geer OsC RAL 21 June, 2010 17

  18. A Vision for the Future at FNAL RLA Linac 2 ADDITIONAL SILDES detector  Muon Collider RLA Linac 1 Project X -factory beam To DUSEL NF MCTF Final Cooling Steve Geer OsC RAL 21 June, 2010 18

More Related