An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Advanced allocation starts with us! CAO - the CEE Allocation office CEE Capacity Congestion Management Project Tomaz Ostir – ICT Manager 23rd June 2010, Portoroz

  2. Agenda • Development of the energy markets – the road to Coordinated Auctions • Central Allocation Office • Company – initiative and first steps • Team – multicultural & interdisciplinary • Work • New approach to crossborder capacity trading - FBA • Future development of crossborderacitivities

  3. The road to coordinated auctions /1 • 1st Energy Directives: 19 Feb 1997„Internal Market in Electricity and Gas“ • Instant Opening: UK, FIN, SWE, DE • Slow Movers: AT, ESP, NL • Late Adopters: FRA, GR, IT

  4. The road to coordinated auctions /2 • 2nd Energy Directives (26. June 2003) - „Accelaration Directive“ • 100 percent market opening by June 2007 • Harmonized transmission access system: Regulated Third Party Access • ERGEG • Unbundling Requirements: • Informational • Operational • Legal • by 2004(TSO)/ 2007(DSO)

  5. The road to coordinated auctions /3 • 3rd Energy Directives (in progress) • EU Council: Full Ownership Unbundling / Independent System Op. • National Action Plans on Energy Poverty • Price Setting Formulas / Peak Load Reduction • Independent Energy Regulators / European Regulator (CEER) • Grid Integration / Grid Codes • Forming of a European Transmission Grid • Cross Border Integration • Investment Plans for Grid Infrastructure (Monitoring & Order) • Monitoring of Cross Border Trade / Energy Prices

  6. CAO – Central Allocation Office Freising

  7. CAO – Central Allocation Office (start) • CAO Central Allocation Office GmbH founded in July 2008 with registered office in Freising, Germany • First preparatory organization steps done by the first managing director by the end of 2008 • IT tender in 2008 closed by concluding the contract for the auction IT solution supply • In December 2008 signed Contract for Services between TSOs and CAO • Preparatory works to start the operation • Consultancy services • Work on the Technical Requirement Specification for the IT solution (TRS) - accepted on 7 April 2009 • FBA method implemented, NTC as a fall-back

  8. CAO – Central Allocation Office (Team) • Experienced start-up team • CAO is doing necessary steps to be ready for the start • Goal fulfilled: trained team of people for dry-run in fall 2009 and for the start of operation • Number of employees since Jan 2010: 14 • Process oriented organization • CAO supported by TSOs workgroups dealing with market issues, FBA development and Scheduling issues • CAO manages to lead the main WGs now

  9. CAO – Central Allocation Office (Work) • Explicit auctions in CEE with use of flow based capacity allocation – Maximum Flow • Yearly, Monthly and Daily allocation • Secondary market • CAO is responsible for capacity calculation based on delivered data (grid model, generation shift key, totals, saldo etc.) • CAO provide and operate auction system • CAO provide settlement services • Decentralized Scheduling in the CEE for now • Intraday trading responsibility of TSOs

  10. NTC bilateral vs. FBA coordinated NTC bilateral TSO 1 Grid model ATC calculation Bilateral ATC Assessment Individual or Coordinated ATC auction(s) TSO 2 Grid model ATC calculation Bilateral ATC Assessment TSO n Grid model ATC calculation

  11. NTC bilateral vs. FBA FBA TSO 1 Coordinated Flowbased auction(s) TSO 2 Grid model TSO n CAO TSOs identify and control only the critical grid elements

  12. Consequences of FBA • One-stop shop for Market Participants • One IT for CEE • One auction for CEE • Virtual Borders – e.g. PSEO-ELES • The main intention of the Internal European Market establishment is to reach a higher social welfare • bid price and the bid amount for all allocated (accepted) bids + social welfare • Equivalent levels of network security

  13. Maximum available exchange? • Control only critical elements! • Consider critical outages (N-1) • Estimate Available Maximum Flow (AMF)

  14. “Flow decomposition” For each critical element: Available Maximum Flow (AMF) = Total maximum flow (TMF) - Natural flow (zero exchange flow) - Flow caused by already allocated/nominated capacity - Uncertain flows (reliability margins)

  15. Concerns of market • Complexity of the FBA allocation method • Structure of the input data: AMF, PTDF matrix • volatile results / high sensitivity • Not enough capacity as a result of the FBA allocation • Short time for necessary adaptations – 6M required • All changes in one step – critical • Misunderstandings to be explained

  16. Typical Misunderstandings • FBA will bring more capacity • FBA is only a system of most optimal calculation known ensuring max security of supply = it doesn't built any new lines • FBA will maximize from its nature allocated capacity on the most attractive directions • What is better: Market Coupling or FBA? • Such comparison does not have any sense • Market Coupling is only an implicit allocation method which still needs the capacities to be somehow calculated (NTC, FBA or we have to invent something new ;-)

  17. Typical Misunderstandings II • FBA manipulates with the capacity among profiles, because depending on sensitivity of flows • FBA provides always a standardized optimal result taking into account technical constrains and attractiveness of a direction – i.e. market decides where more capacity will be allocated • This is bringing 100% transparency in comparison with NTC world, where TSOs decides

  18. Typical Misunderstandings II: Example

  19. Typical Misunderstandings III • Bids on one profile influence Auction price on other profile • As long as bids use the same constraint there must exist interrelation between the Auction Prices • Similar principles already apply today in case of so called Technical Profiles used in “5 TSOs” auctions

  20. Typical Misunderstandings IV • Discriminatory approach towards different profiles through PTDF – negative PTDF coefficient = infinity prices • in example used for explanation of auction algorithm infinity price is used for the source-sink pair with negative PTDF on congested element • this only means that as long as the use of capacity is relieving congested element capacity will be allocated

  21. CAO in operation for 2010 - Interim Phase • Dealing with challenges in the FBA implementation, TSOs discussed set-up for 2010 • Interim phase of capacity allocation in CEE started in parallel with the FBA project: • CAO introduced common registration point for capacity allocation in CEE • CAO took over the role of 5TSOs Auction Office • CAO is providing other coordinating support to the other auction offices in CEE • Until FBA is ready to launch

  22. Approaching the start ... • The new Auction Rules basically consulted with market – now major changes expected • “Efficiency study” results to be available at the end of July 2010 • Next dry-run session planned for August – September • Start of the coordinated FBA procedure planned for October 2010 if no major problems appear • NTC long-term auctions expected to be also coordinated by CAO • Finalisation of the long-term FBA capacity calculation – expected in Q1 2011

  23. What is happening elsewhere • Electricity Regional Initiative • Consensus across Europe • Flowbased – capacity calculation • LT - Harmonized auction rules • LT Harmonized IT interfaces • Day ahead allocation – market coupling model • Intraday – continuous intraday platform • Balancing market integration • Transparency

  24. Other crossborder development - CASC – CWE • France • Belgium • Luxemburg • Germany (Amprion, EnBW, TPS) • Netherland • Coordinate NTC • Market Coupling - -> Implicit auction • Flow base ERGEG

  25. Other crossborder development ERGEG ERGEG ERGEG