1 / 8

Tracker procedures

Tracker procedures. CERN, September 1 st 2009. installation. Tracker test during integration. Tracker DAQ and SlowCtrl software verified with: JMDC server flight JMDC flight T electronics all the intelligence was in the GSC (and operator)

abner
Download Presentation

Tracker procedures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tracker procedures CERN, September 1st 2009

  2. installation

  3. Tracker test during integration • Tracker DAQ and SlowCtrl software verified with: • JMDC server • flight JMDC • flight T electronics • all the intelligence was in the GSC (and operator) • to whom should we ask for more access to the radiator electronics? • who will be responsible of PDS operations during detector integration?

  4. Tracker onboard software activities: • Claude and Philippe at work in Perugia this week • TDR: • calibration harmonization with mainframe last release • housekeeping info implementation • JINF: • slowcontrol implementation • housekeeping info implementation

  5. Power ON • strict minimum (functionally OK, bad data quality): • get OK from TTCS (all the details and procedure to be verified/defined) • power on TxPDs • take data • proper procedure (optimum data quality) • get OK from TTCS (all the details and procedure to be verified/defined) • power on TxPDs • switch off redundant parts (ACTEL, S9055 • calibrate (both standard and Tracker specific calibration) • take data

  6. Tracker requirements • calibrate every 30 minutes (less frequently after some experience) • double trigger calibration every day (less frequently after some experience) • download to ground all the calibration data (786432 16 bit words, ie 4 raw events)

  7. Calibrations Dependence from Temperature • Pedestals drift depends from temperature (electronics) • Noise depends from temperature (silicon) X Y <s> = 2.71 (3.31) for Y (X) side Thermal Chamber Measurement (2007) Cosmic Rays Test (2008) From WJB

  8. Tracker monitoring • JMDC Task: • front-end electronics temperature, TTCS status • JMDC Q-list: • leakage currents (every minute or so) • power supply status (every minute or so) • TDRs node + JMDC: • calibration quality (details under discussion) • data quality (details under discussion)

More Related