1 / 20

Plans for Advanced Virgo

Plans for Advanced Virgo. Raffaele Flaminio LMA/CNRS on behalf of the Virgo Collaboration. SUMMARY - Motivations - Detector design - Expected sensitivity - Status and timeline. Virgo commissioning history. Virgo just started its second science run (VSR2)

adina
Download Presentation

Plans for Advanced Virgo

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plans for Advanced Virgo Raffaele Flaminio LMA/CNRS on behalf of the Virgo Collaboration SUMMARY - Motivations - Detector design - Expected sensitivity - Status and timeline

  2. Virgo commissioning history • Virgo just started its second science run (VSR2) • Detector close to the design sensitivity • BNS range > 8 Mpc (design is ~12 Mpc)

  3. Virgo noise budget Actuation Eddy currents Magnetic Scattered light • Noise budget well understood • Sensitivity close to fundamental noises • Large improvements need large hardware modifications: Advanced Virgo Suspension thermal SHOT Mirror thermal

  4. Enhanced LIGO/Virgo+ Virgo/LIGO 108 ly Adv. Virgo/Adv. LIGO Credit: R.Powell, B.Berger Motivations for Advanced Virgo • Present detectors are testing upper limits of theoretical predictions • Even in the optimistic case expected rates are too low to start GW astronomy • Need to improve the sensitivity • Upgrade Virgo to a 2nd generationdetector • Sensitivity: 10x better than Virgo • Detection rate: ~1000x better • Be part of the 2nd generation GW detectors network • Timeline: commissioning to start in 2014. • Make science with Advanced LIGO

  5. Advanced Virgo Science Case • 1 day of AdVirgo data ~ 3 years of Virgo data • Coalescing binaries detection rates • BNS ~ 10/yr • BBH ~ 0.1 - 100/yr (model dependent) • Advanced Virgo in the network: • Much better event reconstruction • Source location in the sky • Reconstruction of polarization components • Reconstruction of amplitude at source and determination of source distance (BNS) • Detection probability increases: 40% more events than Advanced LIGO only • Detection confidence increase (coincidence techniques) • Multi-messenger opportunities • Collaboration with E.M. and v detectors will increase the search sensitivity or equivalently detection confidence • Advanced GW network opens new perspectives for Astroparticle Physics • The experimentalists view • After ten years of R&D, technology for a major improvement has been demonstrated

  6. Advanced Virgo design

  7. Optical configuration and readout • Main drivers • Reduce impact of quantum noise • Mitigate coating thermal noise • Allow for sensitivity tunability • Use of signal recycling • Foreseen since the beginning • Compatible with vacuum infrastructure • Mature technique • Increase cavity finesse (~900) • Enlarged spot size on test masses • From 2/5 cm to 5/6 cm • Use DC detection • New higher finesse output mode cleaner • Under vacuum photodiodes

  8. Non degenerate cavities/Multiple payloads • Main drivers • Reduce signal loss due to scattering into higher modes • Improve interferometer control signals • Relax spec on thermal compensation system • Use non degenerate recycling cavities • Cavity length ~ 28 m • Telescope in the recycling cavity • Reduce beam size on input/output bench (~ from cm’s to mm’s) • Need for multiple payloads • Impact on couplings and mirror position control

  9. Laser • Main driver • Reduce shot noise • Improve high frequency sensitivity • Increase laser power 10x • Reference solution: solid state amplifier developed at LZH for Advanced LIGO (can provide 180 W) • Alternative: fiber laser • Drawbacks • Radiation pressure noise • Mirror thermal lensing • Mitigation • Heavier mirrors • Improved thermal compensation

  10. Input optics • Main drivers • Manage higher power, Meet AdV noise requirements • Input mode cleaner • Keep 144 m suspended triangular cavity: more noise filtering, easier modulation frequency choice, existing infrastructure • Mirrors: heavier for radiation pressure mitigation, improved polishing for smaller low angle scattering • Electro-optics modulators • Low thermal lensing KTP crystals • Faraday isolator • Realized at IAP (Russia), meets AdV specs

  11. Thermal compensation Shielded heating rings will compensate HR surface deformations • Main driver • Avoid degradation of interferometer performance due to thermal lensing • Main effects • Wavefront distortion in PR/SR cavities • Test masses surface deformation • Thermal compensation • Combined action of a CO2 laser and heating rings • CO2 laser cannot act directly on test masses • Requirements on power stabilization too demanding • Project CO2 laser on silica compensation plates • Drawback • Additional transmissive optics on the main beam • Mitigation • CP seismically isolated • Wedge on CP • Tilted to suppress impact on alignment signals Compensation plates shined with CO2 laser will correct thermal effects in the PRC

  12. Mirrors • Main drivers • Thermal noise reduction • Radiation pressure noise mitigation • Scattering losses reduction • Use state of the art coating in 2011 • Ti:Ta2O5 reference solution • On going R&D • Larger mass • 35 cm diameter, 20 cm thick • 42 kg • Low absorption fused silica • Scattering loss reduction • Specs: flatness < 1 nm, Roughness < 1 Ǻ • Reference solution: corrective coating • Alternative: improved polishing

  13. Seismic isolation • Main drivers • Isolate test mass form seismic noise • Control mirror positions • Use present Virgo super-attenuators (SA) • Compliant with AdVirgo requirements • A new SA to be built for the signal recycling mirror • More isolation required for input and output optics • Due to use of non-degenerate recycling cavities • Upgrade of top stage control • Full 6 dof control; add tilt control • Help control in windy days • Foreseen since the beginning

  14. Monolithic suspensions • Main driver • Reduction of suspensions thermal noise • Use of fused silica fibers to suspend the test masses • Relevant progress during the last months • Fiber production • Geometry under control • Excellent reproducibility • Clamp design • Welding technique • Can be done far from the mirror • Assembly procedure thoroughly tested • Dummy monolithic suspension tested

  15. Vacuum envelope • Main driver • Reduction of index of refraction fluctuation noise • Reduce residual pressure in the Virgo tubes • Current pressure ~ 10-7 mbar (dominated by water) • Reduction 100x required • Tubes bakeout needed • Need to separate tubes from towers • Design solution • Cryotraps at the tubes extremes

  16. Infrastructure: ‘culture’ noise reduction • Main driver • Reduce machine noise • Virgo commissioning experience showed that infrastructure improvements allows reducing environmental noise • Replacement of old air conditioning machines and relocation out of experimental halls • Insulated rooms for noisy racks, power supplies, scroll pumps • Improvement of laser/detection acoustic isolation

  17. Advanced Virgo performance

  18. Risk reduction: Virgo+ • The Virgo+ program is helping reducing the AdV risk by tackling in advance some relevant issues: • Higher power laser • Use of TCS • Monolithic suspensions • Higher arm cavity finesse • The use of monolithic suspensions in Virgo+ is crucial to reduce the risks connected to the fused silica fibers

  19. 08 09 10 11 12 13 15 16 14 8 Virgo Science Run 2 Timeline 150 AdV goal AdV Science Run 1 Advanced Virgo Advanced Virgo commissioning BNS INSPIRAL RANGE (Mpc) Advanced Virgo installation Virgo+ Installation of new mirrors and monolithic suspensions 6.5 Virgo+ commissioning Virgo+ installation

  20. Status of the project and conclusions • Advanced Virgo baseline design and cost evaluation is completed • Project reviewed by an External Review Committee (ERC, chair B. Barish) • Review started in Nov 08 and concluded in May 09 • Final report submitted to the EGO council (funding agencies) • The ERC supports Advanced Virgo as a worthwhile investment for funding • INFN set up a scientific committee (chair N. Cabibbo) to set priorities among the new proposed experiments • Advanced Virgo was top ranked • EGO council meeting on July the 2nd • Virgo/EGO are allowed to place the first preparatory orders • Project leader is appointed • Final INFN decision expected at the end of July • Extraordinary EGO council meeting called on October the 6th for final decision • Advanced Virgo is ready to go and join the 2nd generation GW detector network in 2015