Operational beams for SPS in 2001. Operational beams status. SFTPRO/MDSPS OK up to 1.6x10 13 LHC/TSTLHC [W28] double batch injection, acceleration & splittings: OK new: closed loop during all splitting process Extraction timing C1195/C2395 MESPS [W31]
E N D
Operational beams for SPS in 2001 SSWG, July 3rd , 2001
Operational beams status • SFTPRO/MDSPS • OK up to 1.6x1013 • LHC/TSTLHC [W28] • double batch injection, acceleration & splittings: OK • new: closed loop during all splitting process • Extraction timing C1195/C2395 • MESPS [W31] • FT 3.5GeV/c removed =>extraction timing as TSTLHC (C1195) • RF gymnastics OK (3.5ns achieved) • TSTSPS [W41?] • accelerated to 20GeV/c • start RF gymnastics soon (this week?) SSWG, July 3rd , 2001