1 / 13

Tom Miller MWG Chair Xiaobo Wang MWG-Vice Chair

Tom Miller MWG Chair Xiaobo Wang MWG-Vice Chair . MWG Meeting May 13, 2013. Agenda. Welcome and Introductions WECC Activities Task Force Update Electric Topology Implementation Test results Promod enhancements version 11 and future Reserve granularity. Topology Test Prep.

afric
Download Presentation

Tom Miller MWG Chair Xiaobo Wang MWG-Vice Chair

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tom Miller MWG ChairXiaobo WangMWG-Vice Chair MWG Meeting May 13, 2013

  2. Agenda • Welcome and Introductions • WECC Activities • Task Force Update • Electric Topology Implementation • Test results • Promod enhancements • version 11 and future • Reserve granularity

  3. Topology Test Prep

  4. Preparation of 4/29 Test Case • Used 2010 Backcast (3/8/13 version) • Defined 24 pools based on Balancing Authorities and 3 consolidations • Input entitlement shares of joint plants • Input hurdle rates between pools • Set pool reserves to 4% of daily peak • Note that some of the data has changed since 4/29 and will be implemented later

  5. Progress and complications • Run completed • Took 22 hours (vs. 13 hours with 8 pool topology) • New pools and joint plants work in Promod, but not in post-processing tool • Accounting for joint plants needs to be done carefully (generated where, delivered where) • Data inputs kept changing – had to just run with preliminary inputs

  6. Map of TEPPC Load Areas

  7. 8 Pools to 24 Pools SMUD + TIDC >> BPA + MidC + SCL/TPWR NWMT + WAUW >>

  8. Topology Test Results

  9. Separate Deck • Results ….

  10. Promod Enhancements • Version 11.0 (released January 2013) • Multiple 8760 hourly shapes • Multiple Load and Rating patterns (monthly granularity – bus loads, branch ratings, etc.) • Ramp Rate Penalty Cost • Hydro Scheduled based on Load net Wind (and other selectable transactions) • Runtime improvement; User interface response

  11. Future Enhancements Needed • CO2 Import Penalty for CA AB-32 • Additional improvement to DC transmission algorithm • Enhancement to simplify modeling of Demand Response • Change to limit the contribution of hydro units to reserves • Ability to model multi-layer reserve requirements (BA plus reserve sharing)

  12. Reserve Granularity • For 2022 dataset reserves were: • 4% of daily peak + hourly flexibility reserve

  13. Comments and Questions

More Related