1 / 12

FERC Information Assessment Team (FIAT) Implementation

FERC Information Assessment Team (FIAT) Implementation. Introduction. On March 2, 2005, FIAT presented its Final Recommendation Report to the Commission Before the Commission today are eight draft orders resulting from that report. Introduction. The orders include :

alena
Download Presentation

FERC Information Assessment Team (FIAT) Implementation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FERC Information Assessment Team (FIAT)Implementation

  2. Introduction • On March 2, 2005, FIAT presented its Final Recommendation Report to the Commission • Before the Commission today are eight draft orders resulting from that report

  3. Introduction The orders include : • Changes to existing information collections, and • Inquiries concerning new information collection needs

  4. Changes to Existing Collections

  5. Changes to Existing Collections

  6. Changes to Existing Collections

  7. Changes to Existing Collections

  8. Changes to Existing Collections

  9. Changes to Existing Collections

  10. New Collections • E-2 RM05-16-000 NOI – Confidential Generator Run Status Information • Includes information on the commitment, operating performance and capability of generating units.

  11. New Collections • E-2 RM05-16-000 NOI - Confidential Generator Run Status Information • Information allows the Commission to better oversee the markets.

  12. New Collections • E-3 RM05-17-000 NOI -Requirements for ATC • Seeking comment on standardizing Available Transfer Capability (ATC) calculations. • NERC Task Force Report provides useful guidance. • Standardizing and coordinating ATC would improve market transparency.

More Related