1 / 36

February 16-17 th 2010 Event

February 16-17 th 2010 Event. Preliminary Verification. Watches. OKX Performance POD = 33% Avg. Lead Time = 35 hrs FAR = 75% CSI = .17 Number of Watches: 4 Number of Events: 3 Watches with event: 1 Watches w/o event: 3. INTERNAL Goals POD = 60% CSI = 0.60

Download Presentation

February 16-17 th 2010 Event

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. February 16-17th 2010 Event

  2. Preliminary Verification

  3. Watches OKX Performance POD = 33% Avg. Lead Time = 35 hrs FAR = 75% CSI = .17 Number of Watches: 4 Number of Events: 3 Watches with event: 1 Watches w/o event: 3 INTERNAL Goals POD = 60% CSI = 0.60 Avg. Lead Time = 30 Hours

  4. Warnings OKX Performance POD = 0% Avg. Lead Time = n/a FAR = n/a CSI = 0 Number of Warnings: 0 Number of Events: 3 Warnings with event: 0 Warnings w/o event: 0 National GPRA Goals POD = 90% Avg. Lead Time = 15 Hours FAR = 33% (ER GPRA)

  5. 300 HPA

  6. 500 HPA

  7. 850

  8. Surface

  9. Radar

More Related