1 / 3

8 Equipment Essential for Bride Construction - Bridge Equipment Suppliers

All the equipment which is used for bridge making uses hydraulic, which makes the lifting and positioning of the bridge sections a safer method rather than those traditional methods.<br><br>Visit Us:- https://allaboutship.com/

Download Presentation

8 Equipment Essential for Bride Construction - Bridge Equipment Suppliers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 8 Equipment Essential for Bride Construction - Bridge Equipment Suppliers All the equipment which is used for bridge making uses hydraulic, which makes the lifting and positioning of the bridge sections a safer method rather than those traditional methods. Contractors prefer to use this Bridge equipment from our Bridge Equipment Suppliers because they play an important role in key maintenance and demolition projects. Hydraulic bridge construction equipment 1.Hydraulic Gantry Hydraulic Gantry helps to provide a safe and efficient way to lift all those heavy loads. For this purpose, the traditional crane is not a good option.

  2. This hydraulic gantry makes them ideal for placing and positioning the medium-length girders for spans over the solid ground. 2.Low weight cylinders This equipment can easily fit into the small openings underneath a bridge structure. They are of small size and have low weight. Despite all these issues, these powerful tools help to provide enough force will easily lift the bridge span and allows the replacement of the bearing and other components easily. 3.Torque and tension tools Contractors prefer to use hydraulic torque wrenches and tensions, which are essential for providing the right amount of torque. These tools also help in demolition by providing an efficient way to loosen the bolted connections between those bridge sections. The use of this equipment is mainly during the final installation of pre-cast spans and the steel box beams. 4.Strand jacks Most of the Marine Suppliers of Safetyadvise using hydraulic strand jacks. These hydraulic stand jacks provide an effective solution for lifting the bridge segments into position. They are used for construction; they are also used for decommissioning projects, i.e... for supporting the weight of the bridge spans as these bridge spans are disconnected from the main structural frame. 5.Bar and Cable clutter These devices play a significant role in eliminating obstructions and also allow easy access for maintenance specialists and inspection. These tools provide you with a significant safety advantage over all those traditional cutting methods. These devices also help in cutting through the various materials without generating sparks and any flying debris. 6.Jack up systems This jack-up system is a multipoint incremental lifting system, and it helps in synchronous lifting, lowering, and holding. This jack-up system

  3. also helps in the deconstruction of the bridge, and it is used to support the weight of the bridge sections and is lowered to the ground safely. 7.Skidding Systems A skidding system is used to slide the pre-cast or box beam spans to stag them at the proper elevation. PTFE- coated pads are used while working with skid beams and hydraulic push-pull cylinders. These PTFE-coated pads are used to reduce friction. 8.SyncHoist Bridge Construction Equipment Synchoist is nothing but a below-the-hook crane attachment that is used by many Ship Agency Servicesto accurately adjust and align the box beams and all those other bridge sections when moving into their final position. Using Synchoist helps to eliminate the need for 2 cranes which is essential for manipulation and the rotation of the bridge sections. High-tonnage hydraulic cylinders are also used together with the hydraulic pumps to align and position pre-cast segments. Contact Us All about Ship Piraeus, Greece Email : info@allaboutship.com Website: https://allaboutship.com/

More Related