MATLAB Feedback Phase II Commissioning D. Fairley
Topics • Feedbacks for Phase II • Early Phase II Commissioning Results • Still to do for Phase II • Challenges Ahead • Plan and Schedule for Matlab Feedbacks • Fast Feedback Plans D. Fairley
Phase II Commissioning Results • Longitudinal Feedback commissioned thru BC2. Currently implemented as 7 different feedbacks (4 new loops) • Bunch Charge Feedback commissioned • Two additional feedbacks commissioned (bonus!) • Gun Launch • X Cavity Launch • Our physicists are happy with the results - report that when the feedbacks are turned off the machine drifts within minutes D. Fairley
LCLS – Accelerator and Bunch Compressor Schematic D. Fairley
Screen Shots D. Fairley
Screen Shots D. Fairley
Screen Shots D. Fairley
Phase II Commissioning, cont. • Feedback Framework has been successful in making installation and use of new feedbacks easier. • General Purpose utilities for all feedbacks • Configuration utility • Reference Orbit collection, editting, loading • Restore Actuator utility • Start, Stop, Enable, Disable control • Setpoint scanning capability • Transverse feedbacks are easiest to clone • Has been useful for Longitudinal feedback, since this is one feedback defined by many similar loops D. Fairley
Phase II Commissioning, cont. • Process for making a new feedback: • If necessary, create up to three new matlab scripts for the feedback: getMatrix function, loop init function, loop algorithm.* • Add EPICS DB template for each new feedback and re-build soft IOC * • Create a configuration file for the feedback • Create EDM screens for the new feedback * • Update ChannelWatcher config • Add Alarms for the feedback • Archive new feedback PVs * Usually done by copy and edit D. Fairley
Still to go for Phase II • Several Feedbacks are not completed; we are waiting for EPICS controlled BPMs, Magnets, and RF. • Longitudinal must include DL2 Energy • L2 Launch • L3 Launch D. Fairley
Challenges for Phase II • Using two klystrons to control 26+ klystrons for BC2, sometimes there is no solution for the longitudinal feedback. • Cross-talk between transverse feedbacks may be an issue when L2 and L3 Launches are installed • Better cooperation between Laser-Cathode Alignment GUI and Gun Launch could help. • We are still learning how various subsystems effect the feedbacks (as above, cathode alignment, klystrons at L2, charge changes, etc) and vice-versa. There will be more adjustments as commissioning continues… D. Fairley
Plan and Schedule • Short-term (before end of this run) • Commission L2 Launch feedback • Make Desired Energy and Desired Chirp ‘virtual’ actuators for the longitudinal feedback. These will take an Energy and Chirp value and control the 24-1 and 24-2 klystron phases accordingly. • Add feedback setpoints and limits to SCORE for save/restore • Disallow 24-1 and 24-2 klystron ‘swap’ where the longitudinal feedback settles on a solution where the klystrons flip in phase D. Fairley
Plan and Schedule • Later (Next Commissioning Run) • Formalize reference orbit usage • Commission L3 Launch feedback • Complete the Longitudinal thru DL2 D. Fairley
Fast Feedback Plans • Feedback for 120 Hz with time-slot compensation needed by July 2010 • Feedback for 60 Hz (no time-slot issues) needed by October 2009 • General plan • move feedback data transport to a dedicated network. • Move feedback processing into an IOC. • Setup implemented in new HLA framework D. Fairley