180 likes | 200 Views
Coaching Loco Links. Phase 2 Impact/Handling in Coaching Operations and Implementation. ICMS Team CRIS. COIS – Locos Current Functionalities. COIS- Locos Proposed functionalities. Comparison. Old Process – Divisional PC in COIS. New Process – SH /Divisional PC in LOCO.
E N D
Coaching Loco Links Phase 2 Impact/Handling in Coaching Operations and Implementation. ICMS Team CRIS
Comparison Old Process – Divisional PC in COIS New Process – SH /Divisional PC in LOCO Arrange loco for nomination-SH Nominate Loco –SH Confirm Nomination – PC Departure of Train in COIS Confirm Nomination- En-route –PC Arrival of Train Detach Loco and Next Nomination (Auto) • Arrange Loco for attachment. • Attach any Loco to train. • Departure of train. • En-route scheduled loco attach/detach. • Arrival of train. • Detach Loco (Auto)
Benefits of the New system • Nominate once on loco link and free from all next nominations in link. • No need to arrange locos for attachment for every train. • Lesser number of Loco Cut-In’s. • Enhance - Right Loco on Right train.
Coaching Loco Links Master Data • Released on production on 28th Mar, 2016. • Loco Links added so far: Total Loco links – 622 Electric links- 258 Diesel links - 364
Users • Shed User or Serving station user. • Divisional Power controller. • Zonal user – Coaching Loco link master data.
New Additions • Nomination of Loco. (SH or Serving station) • Nomination Confirmation.(PC) • Exception Marking. (SH/PC) • Expected Light engine Movements as per the nomination. (SH/PC) • Departure of Light Engine. (SH/PC) • Arrival of Light Engine. (SH/PC) • Discard Light engine. (SH/PC) • Formation of Light engine. (SH/PC)
Cycle of Transactions (Impact Handling of Coaching Loco links in ICMS)
Additional Functionalities • Capturing of non- train route in DATA module. • Capturing of Empty rakes as train in DATA module. • Empty rakes reporting in COIS as regular trains.
On release • Withdraw Loco Attach Detach from rake operations and pilot rake operations page.
MIS Reports Dashboard: • List of trains wrongly fed in Loco link(Loco not required DMU, EMU etc). • List of New Trains Added. • List of Renumbered trains. • List of Trains with Profile changes. MIS : • Trains not in Loco Link. (Full and partial). • Broken Loco Links. • Locos Running in Loco links. • Exceptional Marking reporting.