1 / 17

Coaching Loco Links

Coaching Loco Links. Phase 2 Impact/Handling in Coaching Operations and Implementation. ICMS Team CRIS. COIS – Locos Current Functionalities. COIS- Locos Proposed functionalities. Comparison. Old Process – Divisional PC in COIS. New Process – SH /Divisional PC in LOCO.

aphyllis
Download Presentation

Coaching Loco Links

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Coaching Loco Links Phase 2 Impact/Handling in Coaching Operations and Implementation. ICMS Team CRIS

  2. COIS – Locos Current Functionalities

  3. COIS- Locos Proposed functionalities

  4. Comparison Old Process – Divisional PC in COIS New Process – SH /Divisional PC in LOCO Arrange loco for nomination-SH Nominate Loco –SH Confirm Nomination – PC Departure of Train in COIS Confirm Nomination- En-route –PC Arrival of Train Detach Loco and Next Nomination (Auto) • Arrange Loco for attachment. • Attach any Loco to train. • Departure of train. • En-route scheduled loco attach/detach. • Arrival of train. • Detach Loco (Auto)

  5. Benefits of the New system • Nominate once on loco link and free from all next nominations in link. • No need to arrange locos for attachment for every train. • Lesser number of Loco Cut-In’s. • Enhance - Right Loco on Right train.

  6. Coaching Loco Links Master Data • Released on production on 28th Mar, 2016. • Loco Links added so far: Total Loco links – 622 Electric links- 258 Diesel links - 364

  7. Users • Shed User or Serving station user. • Divisional Power controller. • Zonal user – Coaching Loco link master data.

  8. New Additions • Nomination of Loco. (SH or Serving station) • Nomination Confirmation.(PC) • Exception Marking. (SH/PC) • Expected Light engine Movements as per the nomination. (SH/PC) • Departure of Light Engine. (SH/PC) • Arrival of Light Engine. (SH/PC) • Discard Light engine. (SH/PC) • Formation of Light engine. (SH/PC)

  9. Cycle of Transactions (Impact Handling of Coaching Loco links in ICMS)

  10. Light Engine Cycle

  11. Additional Functionalities • Capturing of non- train route in DATA module. • Capturing of Empty rakes as train in DATA module. • Empty rakes reporting in COIS as regular trains.

  12. Additional Applications

  13. On release • Withdraw Loco Attach Detach from rake operations and pilot rake operations page.

  14. MIS Reports Dashboard: • List of trains wrongly fed in Loco link(Loco not required DMU, EMU etc). • List of New Trains Added. • List of Renumbered trains. • List of Trains with Profile changes. MIS : • Trains not in Loco Link. (Full and partial). • Broken Loco Links. • Locos Running in Loco links. • Exceptional Marking reporting.

  15. DEMO

More Related