An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee Airforce Museum, Van Buren Twp

  2. MDOT’s Mission Providing the highest quality integrated transportation services for economic benefit and improved quality of life.

  3. Introduction • I-96 freeway originally opened in 1971 • Has served community for over 40 years • Has exceeded its service life

  4. Meeting Purpose • Update design progress • Decision to close the freeway • Review Construction Staging • Obtain input on corridor aesthetics (landscaping, colors, etc.) • Gather input on potential project/construction impacts

  5. How Did We Get Here? • On March 1, 2012, MDOT hosted the first public meeting to present: • General project information • Eleven different options for maintaining traffic during construction, including the preference on whether to close the freeway or keep lanes open through the work zone

  6. How Did We Get Here? • More than 1,700 people responded to a survey asking which options were preferred: TO OPEN or TO CLOSE the freeway during construction • 56 percent of respondents preferred full closure, favoring minimized construction duration

  7. What We are Doing • MDOT is working with the following stakeholders to mitigate reconstruction concerns, including but not limited to: • Wayne County • City of Livonia • Redford Township • Detroit Water and Sewer Department • Various School Districts • Business Owners • Residents

  8. What We are DoingRebuild / Upgrade • Road Reconstruction • Bridge Repairs • Geometric Upgrades • Drainage • Freeway Lighting • Signing • Landscaping

  9. Project Scope Rebuild / Upgrade • Seven miles of eight-lane freeway • Six full-service interchanges • On and off ramps serving businesses and residential areas • 37 Bridges • Bridge work scopes range from minor rehabilitation to replacement

  10. Project Scope Rebuild / Upgrade • Freeway Lighting • New lights will last longer and require less maintenance • LED lamp options under evaluation • Aesthetic Treatments for: • Barriers, bridges, retaining walls, and mainline shoulders • Bridge fencing • Service drive fencing and paving • Paint color selections for new/existing structures • Right‐of‐way landscape plantings

  11. Project Scope Rebuild / Upgrade • Maintaining Traffic/Access to Freeway and Local System • Detour around project site for through-traffic • I-94 to south • I-696 to north • Westbound connection at M-39 (Southfield Freeway) • Eastbound connection at I-275

  12. Project Scope Rebuild / Upgrade • Maintaining Traffic/Access to Freeway and • Local System • Local access across I-96 during Bridge Repair/Reconstruction • 31 of 37 bridges will be closed at various periods for construction • Six of 37 bridges will have partial closures • MDOT will ensure that no two adjacent bridges will be closed at the same time. As such, detours will be less impactful.

  13. Project Scope Rebuild / Upgrade • Relocate changeable message signs as needed • Improve vertical clearance under at bridges and update freeway design • Minimize impacts on existing walls

  14. Project Scope Design Challenges • Improve on and off ramp access to local roads • Improve drainage on the freeway • Flatten freeway side slopes

  15. Project ScheduleNext Steps • ThirdPublic Meeting will be held in mid-2013 • Present complete plan for construction, upcoming timelines and more details • Continue to work with business owners, residents and motorists to address any concerns regarding the project

  16. Contact Information • Ways to voice your opinion: • Project email address: MDOT-96fix@michigan.gov • Facebook: www.facebook.com/96fix • Twitter: www.twitter.com/96fix • Web site: www.96fix.com • MDOT Taylor TSC : • 6510 Telegraph Road, Taylor MI 48180 • Phone: 313-375-2400

  17. Questions? Customer Service is ImportantPlease take our customer survey:www.michigan.gov/mdot