160 likes | 194 Views
A polished concrete does not end up the process. Now, the major issue is to install it which takes a lot of planning and also a lot of hours to finish the entire work. It is not easy to do because there is a major factor called timing when it comes to concrete polishing in Indiana
E N D
A polished concrete does not end up the process. Now, the major issue is to install it which takes a lot of planning and also a lot of hours to finish the entire work. It is not easy to do because there is a major factor called timing when it comes to concrete polishing in Indiana. The instant when the timing goes wrong, you’ll have to stop the ongoing process and start all over again. The whole time taken depends on the size and condition of the room where concrete polishing has to be done. Mostly, the time taken in the installation is in between 3 to 6 days.
To maintain the integrity of the floor, there requires a lot of time and skill. Each step taken in the whole process is very important, and also there should be nothing left, that means, all aspects must be covered. If longevity is an issue, then don’t worry because it is for the best.
Steps of Installation of a Concrete floor: 1. Preparation: This is the first and the very basic step while polishing the concrete. There will be done a lot of prying and surveying for this work. For this, the surface should be suitable and also ready if it can be. Now, make sure to get the substrate right because this is the layer beneath the actual flooring. Next step is to find out what type of things we are dealing with before proceeding
Once everything is known and made okay, the excavation can begin. Remove the floorboards one by one and make sure to mark out the floor height with a line. Next, place a layer of sand at the very bottom to avoid the moisture before placing a sheet of plastic on top. Keep doing this until you get two layers and then top it with a wire mesh
2. Pouring Now, pouring is done and leveled using a float. Whatever the area size decides the time taken to complete the whole process. The longest time period is 2 to 3 days. But, what matters is getting it right, fully. 3. Polishing Now it’s time to polish the concrete. After the proper plates are installed in the planetary grinder, then we start going through the room so we don’t get bumped into the walls. If there is any incorrection, then this could result in scratches and nicks on the walls. Now, the tool marks are removed using hybrid tools. This is done so that there should be no impressions left on the surface due to grinding. 4. Sealing Now, there is one final step left which is cleaning up all the debris by using a non- abrasive cloth. The next step is applying the sealer applicator spray onto the concrete floor. The sealer should be applied
For more update , visit us https://www.commercialpaintingservices.com