An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. En-route Working Group(and working group of the whole) 13 March 2013

  2. All Working Groups • Operational DCL End-to-End • At final draft • Comments to Carol Burr by APril • Will be approved at DCIT-32 in April • Next step is to start the Flight Deck and other documents (SIDD?) • Actions have been allocated to start this • Action allocated to begin preparation of other operational documentation • IOC requirements reviewed and prioritized based on operational viability and fleet inclusion • UM83 on/off switch • UM79 repeat TO point • Airway/airway • Radials flown as route elements

  3. En-Route End-to-end Service descriptions • DCIT-31 target: En-Route end-to-ends complete, Use Case level • Transfer of Comm / Initial Contact (Andy Fry leading) • Route modifications (Suzy Hawkins leading) • Additional feedback will be treated as it comes in (e.g. we just received new “full” use cases) • Plenary approves both end-to-end documents? • Detailed message construction and messaging scenarios • Target is end-August to match FAA timescales • Specific lists already available in both TOC/IC and Route Mod’s • Actions assigned out for detailed scenarios • Will be synched with Harris Interoperablity testing activity now being launced • End-to-ends are the central repository so that ground and air have common testing scenarios and cross-usable results • We are on track for DCIT synched requirements by FID • Validation still needs to be done

  4. Back-up

  5. FAA Services Roadmap CY 14 16 18 20 22 24 26 28 30 Segment 1 Phase 1 - Tower Service Departure Clearance Tower IOC Departure Clearances (DCL) Segment 1 Phase 2 - En Route Services Transfer of Communications Initial Check-In Altitudes / Altimeter Settings Go Button / Airborne Reroutes Tailored Arrivals Controller Initiated Routes Direct-to-Fix Crossing Restrictions Advisory Messages Speed and Headings Beacon Codes Stuck Microphone Transfer of Communications Initial Check-In Altitudes / Altimeter Settings Go Button / Airborne Reroutes Tailored Arrivals Controller Initiated Routes Direct-to-Fix Crossing Restrictions Advisory Messages Speed and Headings Beacon Codes Stuck Microphone Data Comm Routine Communications En Route IOC Initial En Route Services TFM Data Comm Reroutes Segment 1 Phase 3Full En Route Services Data Comm Routine Communications FANS 1/A+ over VDL-2 transitioning to ATN Avionics FANS Ground System ATN Segment 2 - Advanced Services Segment 2 IOC 4D Trajectories D-TAXI

  6. En-route Working Group Working Targets • Final Investment Decision in fall 2014 • Requirements need to be done at end-2013 / early-2014 (CY) • For DCIT, this End-to-End, Flight Deck and SIDD level documents • DCIT ERWG Priorities • Service work areas selected on the basis of complexity, criticality to Program, and aircraft operator value • Complexity • Criticality to Program success • TOC/IC, including National Single Data Authority (NSDA) and “Eligibility into this” • Route Modifications • Go Button • Controller Initiated Reroutes • Direct-to-fix • Tailored Arrivals • Crossing constraints